Journal of Shanghai Jiaotong University ›› 2019, Vol. 53 ›› Issue (Sup.1): 17-23.doi: 10.16183/j.cnki.jsjtu.2019.S1.004
Previous Articles Next Articles
ZHOU Mao,LIU Mingming,LIU Quandong,LIU Guanrong,LI Yutong,YANG Wei
Published:2020-04-08
CLC Number:
ZHOU Mao,LIU Mingming,LIU Quandong,LIU Guanrong,LI Yutong,YANG Wei. Modification of Human Body Size in Human Factor Analysis of Main Control Room of Nuclear Power Plant[J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 17-23.
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/10.16183/j.cnki.jsjtu.2019.S1.004
| [1]顾念华.核电站主控制室主控盘台的设计与制造简述[J].仪表技术, 2017(7): 43-45. GU Nianhua. Brief description of design and manufacturing of the main control panel of the nuclear power plant[J]. Instrumentation Technology, 2017(7): 43-45. [2]高媛, 李菁, 陈洁.主控室盘台人体工效学验证[J]. 科技视界, 2017(5): 120-121. GAO Yuan, LI Jing, CHEN Jie. Ergonomic verification of the main control room panel[J]. Science & Technology Vision, 2017(5): 120-121. [3]国家技术监督局.中国成年人人体尺寸: GB 10000-1988 [S].北京: 中国标准出版社, 1988. State Bureau of Technical Supervision. Human dimensions of Chinese adults: GB 10000-1988[S].Beijing: Standards Press of China, 1988. [4]国家技术监督局.在产品设计中应用人体尺寸百分位数的通则: GB/T 12985-1991 [S].北京: 中国标准出版社, 1991. State Bureau of Technical Supervision. General rules of using percentiles of the body dimensions for products design: GB/T 12985-1991 [S]. Beijing: Standards Press of China, 1991. [5]国家技术监督局.工作空间人体尺寸: GB/T 13547-1992 [S].北京: 中国标准出版社, 1992. State Bureau of Technical Supervision. Human dimensions in workspaces: GB/T 13547-1992 [S]. Beijing: Standards Press of China, 1992. [6]宿俊海, 李颖.基于人因工程的核电站主控室设计[J]. 仪器仪表用户, 2014(1): 85-87. SU Junhai, LI Ying. Design of main control room in nuclear power plant based on human factor engineering[J]. Instrumentation Customer, 2014(1): 85-87. [7]U.S. NRC. Human-system interface design review guidelines: NUREG-0700 Rev.2[S]. Washington, USA: Nuclear Regulatory Commission, 2002. |
| [1] | WANG Shun,LIU Mingxing,LIU Bin,WANG Song,HUANG Qi. Discussion on Localization of DCS Components in Nuclear Power Plant [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 24-28. |
| [2] | LIU Mingming,GAO Nan,LIU Quandong,JIN Xinglian,ZHANG Xu,CHEN Zhao. Application and Exploration of Virtual Reality Technology in Main Control Room Design of Nuclear Power Plant [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 29-32. |
| [3] | CHEN Jianwen,GONG Chengjun. Analysis and Treatment of Fault for Rod Position System [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 33-44. |
| [4] | LIU Yan,LEI Chuan,GUO Meng. Relay Board Jump of Reactor Protection System in One Nuclear Power Plant [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 45-50. |
| [5] | XU Shihao,JIANG Jing,XIE Weibo,CHEN Zhao,LIU Mingming. Scheme of Digital Reactor Protection System out of Service and in Service [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 51-54. |
| [6] | ZHANG Ying,CHEN Zhi,LI Yiliang,JIN Yuan. Optimization Design for Reactor Power Control System of HPR1000 [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 55-60. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||