Journal of Shanghai Jiao Tong University ›› 2021, Vol. 55 ›› Issue (1): 103-110.doi: 10.16183/j.cnki.jsjtu.2019.173
Special Issue: 《上海交通大学学报》2021年12期专题汇总专辑; 《上海交通大学学报》2021年“工业工程与管理”专题
WANG Jinfeng, CHEN Lu(), YANG Wenhui
Received:
2019-06-21
Online:
2021-01-01
Published:
2021-01-19
Contact:
CHEN Lu
E-mail:chenlu@sjtu.edu.cn
CLC Number:
WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints[J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110.
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/10.16183/j.cnki.jsjtu.2019.173
Tab.2
Performance of different GAs on medium and large scales
|N| | GA | GA-IPM | GA-PPM | |||||
---|---|---|---|---|---|---|---|---|
OTPM/h | tCPU/s | OIPM/h | tCPU/s | DIPM/% | OPPM/h | tCPU/s | DPPM/% | |
20 | 8 | 3.21 | 21 | 3.01 | 162.50 | 14 | 2.87 | 75.00 |
30 | 17 | 4.64 | 36 | 4.08 | 111.76 | 26 | 3.91 | 52.94 |
40 | 94 | 5.88 | 140 | 5.04 | 48.94 | 137 | 4.86 | 45.74 |
50 | 237 | 6.72 | 335 | 6.35 | 41.35 | 308 | 5.79 | 29.96 |
60 | 295 | 6.94 | 407 | 6.94 | 37.97 | 320 | 6.93 | 8.47 |
70 | 470 | 8.35 | 603 | 8.14 | 28.30 | 499 | 7.31 | 6.17 |
80 | 711 | 9.21 | 924 | 9.41 | 29.96 | 742 | 9.45 | 4.36 |
90 | 1 142 | 10.37 | 1 458 | 9.88 | 27.67 | 1 198 | 9.53 | 4.90 |
100 | 1 445 | 10.28 | 1 793 | 10.56 | 24.08 | 1 511 | 10.78 | 4.57 |
[1] | YU X Y, ZHANG Y L, STEINER G. Single-machine scheduling with periodic maintenance to minimize makespan revisited[J]. Journal of Scheduling, 2014, 17(3): 263-270. |
[2] | 蒋凯丽,陆志强,崔维伟. 考虑周期预防性维护的两阶段混合流水线调度[J]. 计算机集成制造系统,2017, 23(3): 616-623. |
JIANG Kaili, LU Zhiqiang, CUI Weiwei. Two-stage hybrid flow shop scheduling with periodic preventive maintenance[J]. Computer Integrated Manufacturing Systems, 2017, 23(3): 616-623. | |
[3] | SALMASNIA A, MIRABADI-DASTJERD D. Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures[J]. TOP, 2017, 25(3): 544-578. |
[4] | DIEULLE L, BÉRENGUER C, GRALL A, et al. Sequential condition-based maintenance scheduling for a deteriorating system[J]. European Journal of Operational Research, 2003, 150(2): 451-461. |
[5] | PANDEY D, KULKARNI M S, VRAT P. A methodology for joint optimization for maintenance planning, process quality and production scheduling[J]. Computers & Industrial Engineering, 2011, 61(4): 1098-1106. |
[6] | LIU Q M, DONG M, CHEN F F, et al. Single-machine-based joint optimization of predictive maintenance planning and production scheduling[J]. Robotics and Computer-Integrated Manufacturing, 2019, 55: 173-182. |
[7] | 陶辛阳,夏唐斌,奚立峰. 基于健康指数的预防性维护与多目标生产调度联合优化建模[J]. 上海交通大学学报,2014, 48(8): 1170-1174. |
TAO Xinyang, XIA Tangbin, XI Lifeng. Health-index-based joint optimization of preventive maintenance and multi-attribute production scheduling[J]. Journal of Shanghai Jiao Tong University, 2014, 48(8): 1170-1174. | |
[8] | LEE C Y. Machine scheduling with an availability constraint[J]. Journal of Global Optimization, 1996, 9(3/4): 395-416. |
[9] | KUBZIN M A, STRUSEVICH V A. Planning machine maintenance in two-machine shop scheduling[J]. Operations Research, 2006, 54(4): 789-800. |
[10] | 廖雯竹,潘尔顺,奚立峰. 基于设备可靠性的动态预防维护策略[J]. 上海交通大学学报,2009, 43(8): 1332-1336. |
LIAO Wenzhu, PAN Ershun, XI Lifeng. Research on dynamic predictive maintenance policy based on system reliability[J]. Journal of Shanghai Jiao Tong University, 2009, 43(8): 1332-1336. | |
[11] | AHMADI R, NEWBY M. Maintenance scheduling of a manufacturing system subject to deterioration[J]. Reliability Engineering & System Safety, 2011, 96(10): 1411-1420. |
[12] | YILDIRIM M B, NEZAMI F G. Integrated maintenance and production planning with energy consumption and minimal repair[J]. The International Journal of Advanced Manufacturing Technology, 2014, 74(9/10/11/12): 1419-1430. |
[13] | CHEN X H, XIAO L, ZHANG X H. A production scheduling problem considering random failure and imperfect preventive maintenance[J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2015, 229(1): 26-35. |
[14] | 丁珮雯,蒋祖华,胡家文,等. 带有交货期时间窗的生产与维护联合调度优化[J]. 上海交通大学学报,2015, 49(4): 524-530. |
DING Peiwen, JIANG Zuhua, HU Jiawen, et al. Integrating production scheduling and preventive maintenance for a single machine with due window[J]. Journal of Shanghai Jiao Tong University, 2015, 49(4): 524-530. | |
[15] | 郝虹斐,郭伟,桂林,等. 非完美维修情境下的预防性维修多目标决策模型[J]. 上海交通大学学报,2018, 52(5): 518-524. |
HAO Hongfei, GUO Wei, GUI Lin, et al. A multi-objective preventive maintenance decision-making model for imperfect repair process[J]. Journal of Shanghai Jiao Tong University, 2018, 52(5): 518-524. | |
[16] | ASCHER H, FEINGOLD H. Repairable systems reliability modeling, inference, misconceptions and their causes [J]. Microelectronics Reliability, 1986, 26(5): 993. |
[17] | SCHMIDT G. Scheduling with limited machine availability[J]. European Journal of Operational Research, 2000, 121(1): 1-15. |
[18] | EMMONS H. One-machine sequencing to minimize certain functions of job tardiness[J]. Operations Research, 1969, 17(4): 701-715. |
[19] | KANET J J. New precedence theorems for one-machine weighted tardiness[J]. Mathematics of Operations Research, 2007, 32(3): 579-588. |
[1] | YAN Qing, LU Jiansha, JIANG Weiguang, SHAO Yiping, TANG Hongtao, LI Yingde. Path Optimization of Stacker in Compact Storage System with Dual-Port Layout [J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 858-867. |
[2] | ZHOU Tianyan, FENG Xiaoen, FAN Yunfeng, DONG Shiyin, LI Yuqing, JIN Huizhong. Optimization Model of Ground Air Defense Force Deployment to Avoid Excessive Air Defense Firepower [J]. Air & Space Defense, 2022, 5(4): 19-23. |
[3] | WANG Xiaojian, HONG Jun, CHEN Jinghua, LI Hongguang. Weight Reduction Study of Box Structure Based on Parametric Modeling and Response Surface Optimization [J]. Air & Space Defense, 2022, 5(4): 60-66. |
[4] | LIU Jiea (刘 洁), ZHANG Baojib∗ (张宝吉). Multiobjective Optimization of Hull Form Based on Global Optimization Algorithm [J]. J Shanghai Jiaotong Univ Sci, 2022, 27(3): 346-355. |
[5] | WANG Zhuoxin, ZHAO Haitao, XIE Yuehan, REN Hantao, YUAN Mingqing, ZHANG Boming, CHEN Ji’an. Prediction of Modulus of Composite Materials by BP Neural Network Optimized by Genetic Algorithm [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1341-1348. |
[6] | YE Hongqing, SU Huade, ZHENG Meimei, XIA Tangbin. Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1359-1367. |
[7] | ZHOU Yutai, XU Yue, LI Yu, JIANG Guotao. Genetic Algorithm Based Method of Optimal Deployment for Three-Dimensional Radar Networks Under Jamming Situation [J]. Air & Space Defense, 2022, 5(1): 52-59. |
[8] | ZHONG Xiaobo, YU Long, LÜ Shun, MU Wentong, ZHU Yanfeng. Construction and Application of Functional Equipment Group in Qinshan Nuclear Power Plant [J]. Journal of Shanghai Jiao Tong University, 2021, 55(S2): 1-6. |
[9] | LI Cuiming, WANG Ning, ZHANG Chen. Hierarchical Mission Planning for Cleaning Photovoltaic Panels Based on Improved Genetic Algorithm [J]. Journal of Shanghai Jiao Tong University, 2021, 55(9): 1169-1174. |
[10] | JIN Yudong (靳宇栋), FENG Jiabo (冯家波), ZHANG Weijun (张伟军). UAV Task Allocation for Hierarchical Multiobjective Optimization in Complex Conditions Using Modified NSGA-III with Segmented Encoding [J]. J Shanghai Jiaotong Univ Sci, 2021, 26(4): 431-445. |
[11] | GU Yifan, ZHAO Wenlong, TANG Shanjun, YANG Qingyu, ZHENG Xin. Research on Target Spatial Collaborative Positioning Methods for Distributed Active/Passive Imaging Detection System [J]. Air & Space Defense, 2021, 4(4): 119-126. |
[12] | ZHUO Pengcheng, YAN Jin, ZHENG Meimei, XIA Tangbin, XI Lifeng. GA-OIHF Elman Neural Network Algorithm for Fault Diagnosis of Full Life Cycle of Rolling Bearing [J]. Journal of Shanghai Jiao Tong University, 2021, 55(10): 1255-1262. |
[13] | ZHAO Chaowang (赵朝望), YANG Jian (杨健), XIONG Wuyue (熊吴越), LI Jiatong (李佳潼). Two Generative Design Methods of Hospital Operating Department Layouts Based on Healthcare Systematic Layout Planning and Generative Adversarial Network [J]. J Shanghai Jiaotong Univ Sci, 2021, 26(1): 103-115. |
[14] | NIU Zhihua, YUAN Can, KONG Deyu. A Hybrid Genetic Algorithm for Computing the k-Error Linear Complexity of Periodic Sequences [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 599-606. |
[15] | KANG Juntao, ZHANG Yazhou, QIN Shiqiang. A Hybrid Evolutionary Algorithm for Identifying Multiple Alternatives in Model Updating [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 652-660. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||