Journal of Shanghai Jiaotong University ›› 2013, Vol. 47 ›› Issue (05): 723-727.
• Mechanical instrumentation engineering • Previous Articles Next Articles
WANG Guina,YU Binghao,PAN Ershun,DU Shichang
Received:
2012-04-02
Online:
2013-05-28
Published:
2013-05-28
CLC Number:
WANG Guina,YU Binghao,PAN Ershun,DU Shichang. Single-Machine Group Scheduling Policy with Preventive Maintenance Planning Considering Learning and Forgetting Effects[J]. Journal of Shanghai Jiaotong University, 2013, 47(05): 723-727.
[1]Webster S T, Baker K R. Scheduling groups of jobs on a single machine [J]. Operationa Research, 1995, 43(4): 692703. [2]Liaee M M, Emmons H. Scheduling families of jobs with setup times [J]. International Journal of Production Economics, 1997, 51(3): 165176. [3]Wu C C, Lee W C. Singlemachine group scheduling problems with deteriorating setup times and job processing times [J]. International Journal of Production Economics, 2008, 115(1): 128133. [4]Biskup D.Single machine scheduling with learning consideration [J].European Journal of Operational Research, 1999, 115(1):173178. [5]程明宝.工件具有指数学习效应的流水作业调度问题[J]. 暨南大学学报, 2008, 29 (2): 4853. CHENG Mingbao. Flow shop scheduling problem with an exponential learning effect [J]. Journal of Jinan University, 2008, 29 (2): 4853. [6]Kuo W H, Yang D L. Singlemachine group scheduling with a timedependent learning effect [J]. Computers and Operations Research, 2006, 33 (8): 20992112. [7]杨明明.具有学习效应和遗忘效应的间歇批生产的单机排序问题[J]. 枣庄学院学报,2010, 27 (10): 3944. YANG Mingming. Single machine scheduling problems with learning and forgetting effects in intermittent batch production [J]. Journal of Zaozhuang University, 2010, 27 (10): 3944. [8]Pan E S, Liao W Z, Xi L F. Singlemachinebased production scheduling model integrated preventive maintenance planning [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 (14): 365375. [9]马松.设备集成维护管理模式及优化策略研究[D].西安电子科技大学管理科学与工程, 2010. |
[1] | LIU Yahui, SHEN Xingwang, GU Xinghai, PENG Tao, BAO Jinsong, ZHANG Dan. A Dual-System Reinforcement Learning Method for Flexible Job Shop Dynamic Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(9): 1262-1275. |
[2] | LI Dechang, YANG Hualong, DUAN Jingru. A Joint Optimization of Vessel Scheduling and Refueling Strategy for Container Liner Shipping with Cooperative Agreements [J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 953-964. |
[3] | LI Linyan, HAN Shuang, QIAO Yanhui, LI Li, LIU Yongqian, YAN Jie, LIU Haidong. A Wind-Solar-Electric Vehicles Coordination Scheduling Method for High Proportion New Energy Grid-Connected Scenarios [J]. Journal of Shanghai Jiao Tong University, 2022, 56(5): 554-563. |
[4] | WANG Zixiang, WU Zerui, LIU Ran. Weekly Physician Scheduling for Emergency Departments with Time-Varying Demands of Patients with Revisits [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 242-252. |
[5] | TANG Hongtao, WANG Dannan, SHAO Yiping, ZHAO Wenbin, JIANG Weiguang, CHEN Qingfeng. A Modified Migrating Birds Optimization for Multi-Objective Lot Streaming Hybrid Flowshop Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 201-213. |
[6] | YE Hongqing, SU Huade, ZHENG Meimei, XIA Tangbin. Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1359-1367. |
[7] | LU Qiuyu, YU Zhen, YANG Yinguo, LI Li. Two-Stage Optimal Schedule of Offshore Wind-Power-Integrated Multi-Microgrid Considering Uncertain Power of Sources and Loads [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1308-1316. |
[8] | ZHONG Xiaobo, YU Long, LÜ Shun, MU Wentong, ZHU Yanfeng. Construction and Application of Functional Equipment Group in Qinshan Nuclear Power Plant [J]. Journal of Shanghai Jiao Tong University, 2021, 55(S2): 1-6. |
[9] | WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints [J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110. |
[10] | JIANG Xiaokang, ZHANG Peng, LÜ Youlong, ZHAO Xinming, ZHANG Jie. Hybrid Ant Colony Algorithm for Batch Scheduling in Semiconductor Furnace Operation [J]. Journal of Shanghai Jiaotong University, 2020, 54(8): 792-804. |
[11] | ZHU Hongwei, LU Zhiqiang. Modeling and Optimization of Resource Constrained Project Scheduling Problem Considering Employee-Timetabling [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 624-635. |
[12] | DU Yu,LI Yuqing,ZHANG Xiufang,PAN Ershun. Preventive Maintenance and Replacement Policy for Series Deteriorating Production System Considering Generalized Time Value [J]. Journal of Shanghai Jiaotong University, 2020, 54(5): 465-472. |
[13] | MENG Lingtong, JIANG Zuhua, TAO Ningrong, LIU Jianfeng, ZHENG Hong. Multi-Stockyard Scheduling Considering Technological Process and Combined Assembly Block [J]. Journal of Shanghai Jiao Tong University, 2020, 54(4): 331-343. |
[14] | MA Changpu,ZHOU Binghai. Scheduling of Multi-Load Rail Guided Vehicles in AS/RS with Collision Avoidance Constrains [J]. Journal of Shanghai Jiaotong University, 2020, 54(2): 126-134. |
[15] | FANG Jia, LU Zhiqiang. Modeling and Optimization of Robust Scheduling Template Considering Equipment Failure [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1278-1290. |
Viewed | ||||||||||||||||||||||||||||||||||||||||||||||||||
Full text 384
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||
Abstract 878
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||