考虑光伏不确定性的高耗能工业园区双时间尺度优化调度

王佳颖1, 陆春光1, 矫文书2(), 吴秋伟3, 曹永吉2, 杨建立4   

  1. 1 国网浙江省电力有限公司营销服务中心, 杭州 311121
    2 山东大学 电气工程学院, 济南 250061
    3 清华大学 清华深圳国际研究生院, 广东 深圳 518055
    4 国网浙江省电力有限公司宁波供电公司, 浙江 宁波 315000
  • 收稿日期:2024-06-28 修回日期:2024-08-01 接受日期:2024-08-16 出版日期:2026-06-28 发布日期:2026-07-02
  • 通讯作者: 矫文书,博士生;E-mail:jknone@163.com.
  • 作者简介:王佳颖(1994—),工程师,从事电能计量及需求侧管理研究.
  • 基金资助:
    国网浙江省电力有限公司科技项目资助(B311YF230010)

Dual-Time-Scale Optimal Scheduling for High-Energy-Consuming Industrial Park Considering Uncertainty of Photovoltaic

WANG Jiaying1, LU Chunguang1, JIAO Wenshu2(), WU Qiuwei3, CAO Yongji2, YANG Jianli4   

  1. 1 Marketing Service Center of State Grid Zhejiang Electric Power Co., Ltd., Hangzhou 311121, China
    2 School of Electrical Engineering, Shandong University, Jinan 250061, China
    3 Tsinghua Shenzhen International Graduate School, Tsinghua University, Shenzhen 518055, Guangdong, China
    4 Ningbo Electric Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd., Ningbo 315000, Zhejiang, China
  • Received:2024-06-28 Revised:2024-08-01 Accepted:2024-08-16 Online:2026-06-28 Published:2026-07-02

摘要:

为充分发挥高耗能工业负荷调节潜力,缓解新能源大规模接入带来的电力系统供需平衡压力,提出一种考虑光伏不确定性的高耗能工业园区双时间尺度优化调度方法.首先,基于条件生成对抗网络生成典型光伏出力场景,表征工业园区调度过程中的光伏出力不确定性.其次,综合考虑园区内各类调控资源的耦合机理及调控特性差异,建立高耗能工业园区双时间尺度优化调度模型:在日前阶段,以运行经济性最优为目标,优化高耗能工业用户生产计划;在日内阶段,通过调节电弧炉分接头档位、储能充放电功率等更为灵活的调控资源,进一步平抑工业园区功率波动.最后,对含钢铁、水泥两类典型高耗能行业的工业园区进行优化调度,验证所提方法有效性.

关键词: 高耗能工业, 优化调度, 光伏不确定性, 双时间尺度

Abstract:

To fully exploit the potential regulation capacity of high-energy-consuming industrial loads and alleviate the pressure on the supply-demand balance of power systems caused by the large-scale access of renewable energy resources, this paper proposes a dual-time-scale optimal scheduling method for high-energy-consuming industrial parks considering the uncertainty of photovoltaic (PV). First, typical scenarios of PV power outputs are generated based on the conditional generation adversarial network to characterize the uncertainty of PV during the optimal scheduling process of industrial parks. Then, a dual-time-scale optimal scheduling model is established for high-energy-consuming industrial parks considering the coupling mechanism and regulation characteristics of various regulation resources in the industrial park. In this scheme, the production plan of high-energy-consuming industrial users is optimized to maximize the operation economy of the industrial park in the day-ahead stage, while power fluctuations of the industrial park are further mitigated by coordinating the tap position of electric arc furnaces and the charging/discharging power of energy storage resources in the intra-day stage. Finally, the optimal scheduling of an industrial park containing two typical high-energy-consuming industries, namely, iron and steel plants and cement plants is conducted to verify the effectiveness of the proposed method.

Key words: high-energy-consuming industry, optimal scheduling, uncertainty of photovoltaic (PV), dual time scale