上海交通大学学报 ›› 2026, Vol. 60 ›› Issue (6): 915-924.doi: 10.16183/j.cnki.jsjtu.2024.252

• 新型电力系统与综合能源 • 上一篇    下一篇

考虑多能互补和直流外送的发输电分布鲁棒规划方法

贺杨烊1, 张程铭2(), 王浩宇3, 李勇4, 范程4, 邰能灵1   

  1. 1 上海交通大学 智慧能源创新学院, 上海 200240
    2 国网浙江省电力有限公司电力科学研究院, 杭州 310000
    3 国家电网有限公司华东分部, 上海 200120
    4 新疆丝路坤元能源有限责任公司, 乌鲁木齐 830000
  • 收稿日期:2024-06-28 修回日期:2024-09-08 接受日期:2024-12-11 出版日期:2026-06-28 发布日期:2025-06-25
  • 通讯作者: 张程铭,博士,工程师;E-mail:2258077032@qq.com.
  • 作者简介:贺杨烊(1993—),助理研究员,从事直流输电系统研究.
  • 基金资助:
    国家自然科学基金黄河水科学研究联合基金(U2243243);上海市优秀学术带头人计划(22XD1401400);国家自然科学基金(52337006)

Distributionally Robust Planning Method for Power Generation and Transmission Considering Multi-Energy Complementarity and Direct Current Transmission

HE Yangyang1, ZHANG Chengming2(), WANG Haoyu3, LI Yong4, FAN Cheng4, TAI Nengling1   

  1. 1 College of Smart Energy, Shanghai Jiao Tong University, Shanghai 200240, China
    2 Electric Power Research Institute of State Grid Zhejiang Electric Power Co., Ltd., Hangzhou 310000, China
    3 East China Branch of State Grid Corporation of China, Shanghai 200120, China
    4 Xinjiang Silu Kunyuan Energy Co., Ltd., Urumqi 830000, China
  • Received:2024-06-28 Revised:2024-09-08 Accepted:2024-12-11 Online:2026-06-28 Published:2025-06-25

摘要:

具有强不确定性的新能源大规模并网给电力系统的规划与运行带来极大挑战.针对新能源电力系统的发输电联合规划问题,提出一种考虑多能互补和直流外送的发输电分布鲁棒规划方法.首先,以年规划综合费用最小化为目标,建立考虑风蓄互补和直流外送功率可调的发输电联合规划模型.然后,考虑风电出力的强不确定性,采用改进的生成对抗网络构建典型规划场景,在此基础上建立基于概率场景模糊集的发输电两阶段分布鲁棒规划模型,并采用一种无需对偶且可并行计算的列与约束生成算法求解.最后,基于修改的Garver-6节点系统进行算例分析,证实采用所提分布鲁棒规划方法能够生成兼顾经济性提升和保守性可控的发输电联合规划方案.

关键词: 多能互补, 直流外送, 发输电规划, 分布鲁棒优化, 生成对抗网络

Abstract:

The large-scale integration of highly uncertain renewable energy poses significant challenges to the planning and operation of power systems. To address the joint generation and transmission planning problem in renewable-dominated power systems, this paper proposes a distributionally robust planning method considering multi-energy complementarity and direct current (DC) transmission. First, with the objective of minimizing total annual planning costs, a joint generation-transmission planning model incorporating wind-storage complementarity and adjustable DC transmission is established. Then, considering the high uncertainty of wind power output, an improved generative adversarial network is adopted to construct typical planning scenarios. On this basis, a two-stage distributionally robust generation-transmission planning model based on probabilistic scenario fuzzy sets is constructed and solved using a parallelizable column-and-constraint generation algorithm that requires no dual formulation. Finally, case studies on a modified Graver-6 node system verify that the proposed method yields a planning scheme that balances improved economic performance with controllable conservativeness.

Key words: multi-energy complementarity, direct current (DC) transmission, generation and transmission planning, distributionally robust optimization (DRO), generative adversarial network

中图分类号: