上海交通大学学报 ›› 2026, Vol. 60 ›› Issue (6): 892-903.doi: 10.16183/j.cnki.jsjtu.2024.275

• 新型电力系统与综合能源 • 上一篇    下一篇

计及船舶弹性航程规划与发电调度的两阶段优化策略

周荔丹1, 郑航1, 于天佑2(), 王杰2   

  1. 1 上海电力大学 电气工程学院, 上海 200090
    2 上海交通大学 电气工程学院, 上海 200240
  • 收稿日期:2024-07-08 修回日期:2024-11-13 接受日期:2024-11-28 出版日期:2026-06-28 发布日期:2026-07-02
  • 通讯作者: 于天佑,博士生;E-mail: 1034036456@qq.com.
  • 作者简介:周荔丹(1973—),副研究员,从事电力电子在电力系统中的应用和电能质量研究.
  • 基金资助:
    国家重点研发计划资助项目(2021YFC2802604);国家重点研发计划资助项目(2021YFC2802600);中核集团领创科研项目(22GFC-JJ12-476)

Two-Stage Optimization Strategy Considering Ship Resilient Voyage Programming and Power Generation Scheduling

ZHOU Lidan1, ZHENG Hang1, YU Tianyou2(), WANG Jie2   

  1. 1 College of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, China
    2 School of Electrical Engineering, Shanghai Jiao Tong University, Shanghai 200240, China
  • Received:2024-07-08 Revised:2024-11-13 Accepted:2024-11-28 Online:2026-06-28 Published:2026-07-02

摘要:

针对具有特殊地理条件的海洋岛屿集群,提出联合岛屿交通运输与能源供给的救援船调度策略,解决海洋岛屿集群资源差异性与救援船安全性保障的问题,提高优化调度下救援船的容灾能力.基于能量调度和交通两方面,采用两阶段优化方法.第1阶段根据岛屿位置关系进行日前调度,预先制定航线.第2阶段计及安全模式与紧急模式:在安全模式下,根据第1阶段优化后的航线信息,进一步对系统进行发电优化调度,在环境约束条件下提高系统运行效率与经济性;在紧急模式下,计入发电机故障,采用负荷侧管理与发电协同优化调度方法,支撑系统的刚性负荷需求,保障救援船正常作业.最后,仿真结果验证了本文所提策略的有效性,为海洋岛屿群可持续发展与建设提供理论参考.

关键词: 救援船, 优化调度, 容灾能力, 两阶段优化, 负荷侧管理

Abstract:

For oceanic island clusters with special geographical conditions, this paper proposes a rescue vessel scheduling strategy that integrates island transportation and energy supply to address resource heterogeneity among oceanic island clusters and ensure vessel safety, thereby improving the disaster resilience of rescue vessels under optimized scheduling. Based on both energy dispatch and transportation, a two-stage optimization method is adopted. In the first stage, day-ahead scheduling is performed according to the geographical relationship of the islands to determine preliminary sailing routes. In the second stage, both safe and emergency modes are considered. In the safe mode, based on the optimized routing information from the first stage, further optimal scheduling of power generation is performed to improve operational efficiency and economic performance under environmental constraints. In the emergency mode, considering generator fault, a coordinated optimization strategy between load-side management and power generation is implemented to support critical rigid loads and guarantee the normal operation of rescue vessels. Finally, simulation results verify the effectiveness of the proposed strategy, providing a theoretical reference for the sustainable development and construction of oceanic island clusters.

Key words: rescue vessel, optimized scheduling, disaster resilience, two-stage optimization, load-side ma~nagement

中图分类号: