[1]余佳迪, 周炳海.带缓冲的串行生产系统预防性维护策略[J].上海交通大学学报, 2014, 48(12): 1694-1699.
YU Jiadi, ZHOU Binhai. Preventive maintenance policy for series production systems with intermediate buffers [J]. Journal of Shanghai Jiao Tong University, 2014, 48(12): 1694-1699.
[2]陆志强, 赵婵媛, 崔维伟. 串联生产系统预防性维护计划建模与优化[J]. 哈尔滨工程大学学报, 2017, 38(2): 269-275.
LU Zhiqiang ZHAO Chanyuan, CUI Weiwei. Modeling and optimization of preventive maintenance sche-duling for series production systems [J]. Journal of Harbin Engineering University, 2017, 38(2): 269-275.
[3]陶红玉, 周炳海.基于随机退化的串行生产系统机会维护模型[J].上海交通大学学报, 2013, 47(12): 1911-1917.
TAO Hongyu, ZHOU Binghai. Opportunistic maintenance model for series production systems based on Stochastic degradation [J]. Journal of Shanghai Jiao Tong University, 2013, 47(12): 1911-1917.
[4]侯文瑞, 蒋祖华, 金玉兰.基于可靠度的多部件系统机会维护模型[J].系统工程与电子技术, 2008, 30(9): 1805-1808.
HOU Wenrui, JIANG Zuhua, JIN Yulan. Opportu-nistic preventive maintenance model of multi-components system based on reliability [J]. Systems Engineering and Electronics, 2008, 30(9): 1805-1808
[5]ZHOU X, XI L, LEE J. Opportunistic preventive maintenance scheduling for a multiunit series system based on dynamic programming [J]. International Journal of Production Economics, 2009, 118(2): 361-366.
[6]XIA T, XI L, ZHOU X, et al. Modeling and optimizing maintenance schedule for energy systems subject to degradation [J]. Computers & Industrial Enginee-ring, 2012, 63(3): 607-614.
[7]XIA T, XI L, ZHOU X, et al. Dynamic maintenance decision making for series-parallel manufacturing system based on MAM-MTW methodology [J]. Euro-pean Journal of Operational Research, 2012, 221(1): 231-240.
[8]XIA T, JIN X, XI L, et al. Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling [J]. European Journal of Operational Research, 2015, 240(3): 781-790.
[9]贾积身, 巴玉强, 张清叶.修理工单重定期休假可修系统更换模型研究[J]. 数学的实践与认识, 2014, 44(19): 207-215.
JIA Jishen, BA Yuqiang, ZHANG Qingye. Research on replacement model for reparable system conside-ring its repairman having single regular vacations [J]. Mathematic in Practice and Theory, 2014, 44(19): 207-215.
[10]GAO Q, YUE D, ZHAO B. The ordering and replacement policy for the system with two types of failures [J]. Journal of Systems Science & Complexity, 2018, 31(6): 1541-1553.
[11]ZONG S, CHAI G, ZHANG Z, et al. Optimal replacement policy for a deteriorating system with increasing repair times [J]. Applied Mathematical Modelling, 2013, 37(23): 9768-9775.
[12]WANG G, ZHANG Y. Geometric process model for a system with inspections and preventive repair [J]. Computers & Industrial Engineering, 2014, 75: 13-19.
[13]ZHAO P, LI L. Analysis based on the shortest path method of equipment replacement [C]//IEEE 2014 26th Chinese Control And Decision Conference, Shenyang: Control and Design, 2014: 962-965.
[14]CHANG C C. Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair [J]. Computers & Industrial Engineering, 2014, 67, 185-194. |