Journal of Shanghai Jiao Tong University (Science) ›› 2019, Vol. 24 ›› Issue (4): 485-489.doi: 10.1007/s12204-019-2078-2
Previous Articles Next Articles
WANG Shaohua *(王少华), ZHANG Shixin (张仕新), XU Longyang (徐隆洋), XING Ruxin (邢汝鑫)
Online:
2019-08-01
Published:
2019-07-29
Contact:
WANG Shaohua *(王少华)
E-mail: aafe77330@163.com
CLC Number:
WANG Shaohua *(王少华), ZHANG Shixin (张仕新), XU Longyang (徐隆洋), XING Ruxin (邢汝鑫). Optimal Research on Equipment Maintenance Unequal Time-Interval Based on Simulation[J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 485-489.
[1] BARKER C T, NEWBY M J. Optimal non-periodicinspection for a multivariate degradation model [J].Reliability Engineering & System Safety, 2009, 94(1):33-43. [2] JIA Y X, CHEN X H. Scheduling the imperfect preventivemaintenance policy for deteriorating systems[C]//6th International Conference on Modelling in IndustrialMaintenance and Reliability. Manchester, UK.Institute of Mathematics and Its Applications, 2007:103-109. [3] KIJIMA M, NAKAGAWA T. A cumulative damageshock model with imperfect preventive maintenance[J]. Naval Research Logistics, 1991, 38(2): 145-156. [4] NICOLAI R P, FRENK J B G, DEKKER R.Modelling and optimizing imperfect maintenance ofcoatings on steel structures [J]. Structural Safety, 2009,31(3): 234-244. [5] NAKAGAWA T, MIZUTANI S. A summary of maintenancepolicies for a finite interval[J]. Reliability Engineering& System Safety, 2009, 94(1): 89-96. [6] JAYABALAN V, CHAUDHURI D. An heuristicapproach for finite time maintenance policy [J].International Journal of Production Economics, 1992,27(3): 251-256. [7] PONCHET A, FOULADIRAD M, GRALL A. Maintenancepolicy on a finite time span for a graduallydeteriorating system with imperfect improvements [J].Proceedings of the Institution of Mechanical Engineers,Part O: Journal of Risk and Reliability, 2011, 225(2):105-116. [8] MARQUEZ A C, HEGUEDAS A S. Models for maintenanceoptimization: A study for repairable systemsand finite time periods [J]. Reliability Engineering &System Safety, 2002, 75(3): 367-377. |
[1] | LI Xinlong, RAN Yan, ZHANG Genbao, HE Yan. Sequential Preventive Maintenance Strategy Considering Difference of Maintenance Effect [J]. Journal of Shanghai Jiao Tong University, 2023, 57(11): 1522-1530. |
[2] | TIAN Xueyan, WANG Mengya, PAN Ershun. Imperfect Maintenance Policy for a Two-Machine One-Buffer System Based on Markov Decision Process [J]. Journal of Shanghai Jiao Tong University, 2021, 55(4): 480-488. |
[3] | LIU Gehui (刘葛辉), LONG Xiangyu (龙翔宇), TONG Shuo (仝硕), ZHANG Rui (张瑞), CHEN Shaokuan* (陈绍宽) . Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability [J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 490-495. |
[4] | LIANG Qingxue (梁晴雪), HU Hao* (胡昊). Uncertainty Analysis of Value for Money Assessment for Public-Private Partnership Projects [J]. Journal of Shanghai Jiao Tong University (Science), 2017, 22(6): 672-681. |
[5] | ZHU Yinghua (朱莹华), XU Feng* (徐 峰), HU Hao (胡 昊). A Stochastic Concession Model for Infrastructure Projects Under Build-Operate-Transfer Schemes [J]. Journal of shanghai Jiaotong University (Science), 2016, 21(3): 320-327. |
[6] | HU Jiawen,JIANG Zuhua,HAN Lijie. Preventive Maintenance for Machine Operating in Dynamic Environmental State [J]. Journal of Shanghai Jiaotong University, 2016, 50(05): 736-741. |
[7] | ZHANG Xiaowen,SUN Xiaoming,JIANG Zuhua,HU Jiawen. Opportunistic Preventive Maintenance Strategy for Series-Parallel System Considering Line Balancing [J]. Journal of Shanghai Jiaotong University, 2015, 49(05): 702-707. |
[8] | CHENG Yan, ZHANG Lu-lu, ZHANG Lei, WANG Jian-hua. Coupled Consolidation in Unsaturated Soils Based on Random Field Theory [J]. Journal of Shanghai Jiao Tong University, 2014, 48(11): 1528-1535. |
[9] | WANG Hongjian,XU Jinlong,LIU Xiangbo,LI Juan,ZHANG Aihua. Adaptive Divided Difference Filter Algorithm Based on Support Vector Regression [J]. Journal of Shanghai Jiaotong University, 2014, 48(07): 929-935. |
[10] | FAN Jiangtao1,2,MA Guanyi1,2. A Pre-Despreading Delay-and-Multiplication Method for Global Positioning System Signal Acquisition [J]. Journal of Shanghai Jiaotong University, 2014, 48(03): 363-366. |
[11] | Ding H.; Xu B.; Ni C.; Wang J.-Y.; Jin X.-J.. Monte Carlo simulation of B2-L21 ordering transitions in Au-Cu-Al alloy systems [J]. J Shanghai Jiaotong Univ Sci, 2011, 16(2): 186-189. |
[12] | DIAO Yonghao,JIANG Zhibin. A Stochastic Programming Based Method for Hospital Site Selection [J]. Journal of Shanghai Jiaotong University, 2010, 44(03): 433-0436. |
Viewed | ||||||||||||||||||||||||||||||||||||||||||||||||||
Full text 119
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||
Abstract |
|
|||||||||||||||||||||||||||||||||||||||||||||||||