Journal of Shanghai Jiao Tong University ›› 2021, Vol. 55 ›› Issue (4): 480-488.doi: 10.16183/j.cnki.jsjtu.2019.270
Special Issue: 《上海交通大学学报》2021年12期专题汇总专辑; 《上海交通大学学报》2021年“机械工程”专题
TIAN Xueyan, WANG Mengya, PAN Ershun()
Received:
2019-09-23
Online:
2021-04-28
Published:
2021-04-30
Contact:
PAN Ershun
E-mail:pes@sjtu.edu.cn
CLC Number:
TIAN Xueyan, WANG Mengya, PAN Ershun. Imperfect Maintenance Policy for a Two-Machine One-Buffer System Based on Markov Decision Process[J]. Journal of Shanghai Jiao Tong University, 2021, 55(4): 480-488.
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/10.16183/j.cnki.jsjtu.2019.270
Tab.1
Optimal maintenance policy of M1
M2状态 | κ=0 | κ=1 | κ=2 | κ=3 | κ=4 | κ=5 | |
---|---|---|---|---|---|---|---|
运行 | 1 | (-,-,-) | (-,-,-) | (6,5,5) | (6,5,5) | (4,3,3) | (3,3,3) |
2 | (-,-,-) | (-,-,-) | (6,5,5) | (6,5,5) | (4,3,3) | (3,3,3) | |
3 | (-,-,-) | (-,-,-) | (6,5,4) | (6,5,4) | (3,2,2) | (3,3,3) | |
4 | (-,-,6) | (-,-,6) | (5,5,4) | (5,4,3) | (3,2,2) | (3,3,3) | |
5 | (-,5) | (-,5) | (5,3) | (5,3) | (3,4) | (3,4) | |
故障小修 | 7 | (6,6,6) | (6,5,6) | (4,3,3) | (3,3,3) | (3,4,3) | (3,4,4) |
8 | (6,5,5) | (6,5,5) | (4,3,3) | (3,3,3) | (3,4,3) | (3,4,4) | |
9 | (6,5,5) | (6,5,5) | (4,3,3) | (3,3,3) | (3,4,4) | (3,4,4) | |
10 | (6,5,4) | (6,5,3) | (3,2,2) | (3,3,3) | (3,4,4) | (4,4,4) | |
11 | (5,3) | (5,2) | (3,2) | (3,3) | (3,3) | (4,4) | |
预防性维护 | 13 | (6,6,6) | (6,6,6) | (5,3,3) | (3,3,3) | (3,4,3) | (3,4,4) |
14 | (6,6,6) | (6,6,6) | (4,3,3) | (3,3,3) | (3,4,3) | (3,4,4) | |
15 | (6,6,6) | (6,6,6) | (4,3,3) | (3,3,3) | (3,4,3) | (3,4,4) | |
16 | (6,6,5) | (6,5,5) | (4,3,3) | (3,3,3) | (3,4,4) | (3,4,4) | |
17 | (6,5,5) | (6,5,5) | (4,3,3) | (3,3,3) | (3,4,4) | (3,4,4) | |
18 | (6,5,5) | (6,5,5) | (4,3,3) | (3,3,3) | (3,4,3) | (3,4,4) |
Tab.2
Optimal maintenance policy of M2
M1状态 | κ=0 | κ=1 | κ=2 | κ=3 | κ=4 | κ=5 | |
---|---|---|---|---|---|---|---|
运行 | 1 | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) |
2 | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
3 | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
4 | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
5 | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
6 | (6,4,6) | (6,4,6) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
故障小修 | 7 | (1,1,1) | (5,2,5) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) |
8 | (1,1,1) | (5,3,5) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
9 | (1,1,1) | (5,3,5) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
10 | (1,1,1) | (5,3,5) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
11 | (1,1,1) | (5,3,5) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
12 | (1,1,1) | (5,3,5) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
预防性维护 | 13 | (1,1,1) | (4,2,4) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) |
14 | (1,1,1) | (4,2,4) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
15 | (1,1,1) | (4,2,4) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
16 | (1,1,1) | (4,2,4) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
17 | (1,1,1) | (4,2,4) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) | |
18 | (1,1,1) | (4,2,4) | (6,5,6) | (6,5,6) | (6,5,6) | (6,5,6) |
[1] |
DING S H, KAMARUDDIN S. Maintenance policy optimization: Literature review and directions[J]. The International Journal of Advanced Manufacturing Technology, 2015, 76(5/6/7/8):1263-1283.
doi: 10.1007/s00170-014-6341-2 URL |
[2] |
BASRI E I, ABDUL RAZAK I H, AB-SAMAT H, et al. Preventive maintenance (PM) planning: A review[J]. Journal of Quality in Maintenance Engineering, 2017, 23(2):114-143.
doi: 10.1108/JQME-04-2016-0014 URL |
[3] | 张博文, 陆志强, 张岳君. 并行机系统生产计划与预防性维护联合建模[J]. 上海交通大学学报, 2015, 49(4):564-571. |
ZHANG Bowen, LU Zhiqiang, ZHANG Yuejun. An integrated model of production planning and preventive maintenance for parallel systems[J]. Journal of Shanghai Jiao Tong University, 2015, 49(4):564-571. | |
[4] | 张晓文, 孙小明, 蒋祖华, 等. 考虑生产线平衡的串-并联生产系统机会维护策略[J]. 上海交通大学学报, 2015, 49(5):702-707. |
ZHANG Xiaowen, SUN Xiaoming, JIANG Zuhua, et al. Opportunistic preventive maintenance strategy for series-parallel system considering line balancing[J]. Journal of Shanghai Jiao Tong University, 2015, 49(5):702-707. | |
[5] | 郝虹斐, 郭伟, 桂林, 等. 非完美维修情境下的预防性维修多目标决策模型[J]. 上海交通大学学报, 2018, 52(5):518-524. |
HAO Hongfei, GUO Wei, GUI Lin, et al. A multi-objective preventive maintenance decision-making model for imperfect repair process[J]. Journal of Shanghai Jiao Tong University, 2018, 52(5):518-524. | |
[6] |
REZG N, XIE X, MATI Y. Joint optimization of preventive maintenance and inventory control in a production line using simulation[J]. International Journal of Production Research, 2004, 42(10):2029-2046.
doi: 10.1080/00207540310001638235 URL |
[7] | CHENG G Q, ZHOU B H, LI L. Joint optimisation of buffer size and preventive maintenance for a deteriorating upstream machine[J]. International Journal of Systems Science: Operations & Logistics, 2015, 2(4):199-210. |
[8] | 成国庆, 周炳海, 李玲, 等. 考虑缓冲区库存的退化系统最优维修更换策略[J]. 计算机集成制造系统, 2015, 21(6):1593-1600. |
CHENG Guoqing, ZHOU Binghai, LI Ling, et al. Optimal maintenance strategy for deteriorating systems with intermediate buffers[J]. Computer Integrated Manufacturing Systems, 2015, 21(6):1593-1600. | |
[9] |
GAN S Y, ZHANG Z S, ZHOU Y F, et al. Joint optimization of maintenance, buffer, and spare parts for a production system[J]. Applied Mathematical Modelling, 2015, 39(19):6032-6042.
doi: 10.1016/j.apm.2015.01.035 URL |
[10] |
NIYAMOSOTH T, PATHUMNAKUL S. Joint determination of preventive maintenance and buffer stock for a production unit under lease[J]. Journal of Industrial Engineering and Management, 2018, 11(3):497.
doi: 10.3926/jiem.2578 URL |
[11] | NAHAS N, NOURELFATH M. Buffer allocation, machine selection and preventive maintenance optimization in unreliable production lines[C]//2015 International Conference on Industrial Engineering and Systems Management (IESM). Seville: IEEE, 2015: 1028-1033. |
[12] |
NAHAS N. Buffer allocation and preventive maintenance optimization in unreliable production lines[J]. Journal of Intelligent Manufacturing, 2017, 28(1):85-93.
doi: 10.1007/s10845-014-0963-y URL |
[13] |
NAHAS N, NOURELFATH M. Joint optimization of maintenance, buffers and machines in manufacturing lines[J]. Engineering Optimization, 2018, 50(1):37-54.
doi: 10.1080/0305215X.2017.1299716 URL |
[14] |
RENNA P. Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines[J]. Journal of Industrial Engineering International, 2019, 15(3):411-421.
doi: 10.1007/s40092-018-0301-7 URL |
[15] |
ZANDIEH M, JOREIR-AHMADI M N, FADAEI-RAFSANJANI A. Buffer allocation problem and preventive maintenance planning in non-homogenous unreliable production lines[J]. The International Journal of Advanced Manufacturing Technology, 2017, 91(5/6/7/8):2581-2593.
doi: 10.1007/s00170-016-9744-4 URL |
[16] |
VAN DER DUYN SCHOUTEN F A, VANNESTE S G. Maintenance optimization of a production system with buffer capacity[J]. European Journal of Operational Research, 1995, 82(2):323-338.
doi: 10.1016/0377-2217(94)00267-G URL |
[17] |
DIMITRAKOS T D, KYRIAKIDIS E G. A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times[J]. International Journal of Production Economics, 2008, 111(2):752-762.
doi: 10.1016/j.ijpe.2007.03.010 URL |
[18] |
KARAMATSOUKIS C C, KYRIAKIDIS E G. Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer[J]. European Journal of Operational Research, 2010, 207(1):297-308.
doi: 10.1016/j.ejor.2010.04.022 URL |
[19] |
FITOUHI M C, NOURELFATH M, GERSHWIN S B. Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance[J]. Reliability Engineering & System Safety, 2017, 166:61-72.
doi: 10.1016/j.ress.2017.03.034 URL |
[20] |
ZHOU Y F, ZHANG Z S. Optimal maintenance of a series production system with two multi-component subsystems and an intermediate buffer[J]. Eksploatacja i Niezawodnosc-Maintenance and Reliability, 2015, 17(2):314-325.
doi: 10.17531/ein.2015.2.20 URL |
[21] | GAN S Y, SHI J F. Maintenance optimization for a production system with intermediate buffer and replacement part order considered[J]. Eksploatacja i Niezawodnosc-Maintenance and Reliability, 2014, 16(1):140-149. |
[22] | 夏唐斌. 面向制造系统健康管理的动态预测与预知维护决策研究[D]. 上海: 上海交通大学, 2014. |
XIA Tangbin. Research on dynamic prognosis and predictive maintenance scheduling for health management of manufacturing systems[D]. Shanghai: Shanghai Jiao Tong University, 2014. |
[1] | XU Jie, WANG Zixiang, LIU Yuxin, LIU Ran, YANG Zhitao. Admission Control of Multi-Level Emergency Patients with Time-Varying Demands [J]. Journal of Shanghai Jiao Tong University, 2022, 56(8): 1067-1077. |
[2] | LI Zhaoying, OU Yiming, SHI Ruoling. Improved RRT Path Planning Algorithm Based on Deep Q-network [J]. Air & Space Defense, 2021, 4(3): 17-23. |
[3] | LIU Miaomiao (刘苗苗), LI Xiaoyue (李晓月), XU Yongfu (徐永福). Numerical Study of Sodium Bentonite Extrusion into a Planar Fracture [J]. J Shanghai Jiaotong Univ Sci, 2021, 26(2): 146-154. |
[4] | ZHOU Jian, GAN Qiyun, QIAN Wei, CAO Yun. Tests on the Influence on Electro-Osmotic Effect of Drainage by Adding Humic Acid Buffer Solution to the Cathode Region [J]. Journal of Shanghai Jiaotong University, 2020, 54(3): 239-246. |
[5] | GUO Wenyu,ZHANG Xiufang,XIU Yujiao,XIA Tangbin,PAN Ershun. Integrating Strategy of Preventive Maintenance and Buffer Allocation Considering Dynamic Degradations for Manufacturing Systems [J]. Journal of Shanghai Jiaotong University, 2019, 53(9): 1107-1114. |
[6] | ZHENG Yuqiao *(郑玉巧), ZHANG Chengcheng (张铖铖), SU Chun (苏春). Simulation on Remanufacturing Cost by Considering Quality Grade of Returns and Buffer Capacity [J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 471-476. |
[7] | WANG Shaohua *(王少华), ZHANG Shixin (张仕新), XU Longyang (徐隆洋), XING Ruxin (邢汝鑫). Optimal Research on Equipment Maintenance Unequal Time-Interval Based on Simulation [J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 485-489. |
[8] | LIU Gehui (刘葛辉), LONG Xiangyu (龙翔宇), TONG Shuo (仝硕), ZHANG Rui (张瑞), CHEN Shaokuan* (陈绍宽) . Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability [J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 490-495. |
[9] | ZHANG Yafei,LIU Yijian,LI Zhongli,ZHANG Yaozhong,SU Yanjie,LIU Gang. Fabrication Technologies Research on Solidly Mounted Bulk Acoustic Resonator [J]. Journal of Shanghai Jiaotong University, 2018, 52(10): 1242-1248. |
[10] | WENG Paul1,2*, QIU Zeqi3 (邱泽麒), COSTANZO John3, YIN Xiaoqi3 (阴小骐), SINOPOLI Bruno3. Optimal Threshold Policies for Robust Data Center Control [J]. Journal of Shanghai Jiao Tong University (Science), 2018, 23(1): 52-60. |
[11] | HU Jiawen,JIANG Zuhua,HAN Lijie. Preventive Maintenance for Machine Operating in Dynamic Environmental State [J]. Journal of Shanghai Jiaotong University, 2016, 50(05): 736-741. |
[12] | YU Jiadi,ZHOU Binghai. Preventive Maintenance Policy for Series Production Systems with Intermediate Buffers [J]. Journal of Shanghai Jiaotong University, 2014, 48(12): 1694-1699. |
[13] | GAO Zhongshun,ZHOU Binghai. Disjunctive Graph-based Modeling and Scheduling for Cluster Tools [J]. Journal of Shanghai Jiaotong University, 2013, 47(08): 1227-1233. |
[14] | QIN Jiu-Feng, ZENG Fan-Ming, CHEN Yu-Tao. Method of Multi-agent Autonomous State Reconfiguration of Shipboard Chilled Water System [J]. Journal of Shanghai Jiaotong University, 2013, 47(02): 284-289. |
[15] | SHEN Jian-Liang, QI Shu-Bo, LI Jin-Wen, LIU Lei, LI Si-Kun. A Flit-Switch Bufferless Router Based on Encoding Allocation [J]. Journal of Shanghai Jiaotong University, 2013, 47(01): 144-148. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||