Please wait a minute...
IMAGE/TABLE DETAILS
Two-Stage Robust Expansion Planning of Transmission Network Considering Uncertainty of Offshore Wind Power
TIAN Shuxin, HAN Xue, FU Yang, SU Xiangjing, LI Zhenkun
Journal of Shanghai Jiao Tong University    2024, 58 (9): 1400-1409.   DOI: 10.16183/j.cnki.jsjtu.2023.028
Abstract   (1269 HTML6 PDF(pc) (1718KB)(47)  

The complex and multiple uncertainties of offshore wind power pose great challenges to the safety and robustness of transmission grid structures. In order to improve the adaptability of grid structure to offshore wind power, a robust expansion planning method based on Vague soft set is proposed. First, Monte Carlo simulation is employed to construct the offshore wind Vague scenarios, which transform multiple comprehensive uncertainties of offshore wind power into uncertain parameter sets from true membership function, pseudo-membership function, and unknown information measure based on the Vague soft set theory. Then, a two-stage robust expansion planning model based on Vague scenario set is established for transmission network with offshore wind power penetration. The minimum total investment cost of offshore and onshore line and network loss is taken as the objective function in the first stage, while the minimum objectives of wind abandonment and cutting load for offshore wind power are proposed with the alternating current power flow constraint based on second-order cone relaxation in the second stage. Based on the expected values of wind abandonment and cutting load returned by the second stage model, the operation variables of the first stage model are modified to ultimately obtain the iterative transmission network robust planning scheme. Finally, the Gurobi mathematical optimization engine is used to analyze the Garver 6-node system and IEEE 39-node system to verify the effectiveness and feasibility of the proposed robust expansion planning method.


Fig.3 Changes of load
Extracts from the Article
为了达到海上风电消纳与综合效益之间的动态平衡,不仅要考虑一定程度上的弃风率,还要考虑一定程度上的弃负荷率.根据采集的历史数据,选取不同时间段的负荷情况,如图3所示.
Other Images/Table from this Article