LIU Yan,LEI Chuan,GUO Meng. Relay Board Jump of Reactor Protection System in
One Nuclear Power Plant[J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 45-50.
[1]中华人民共和国国家质量监督检验检疫总局, 中国国家标准化管理委员会.核电厂安全系统定期试验与监测: GB/T 5204-2008[S].北京: 中国标准出版社, 2008.
General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China, The Standardization Administration of China. Periodic tests and monitoring of the safety system of nuclear power plant: GB/T 5204-2008[S].Beijing: Standards Press of China, 2008.
[2]国家核安全局.核电厂安全重要物项的监督(HAD103/09)[DB/OL]. (1994-01-01) [2019-12-10]. https://doc.mbalib.com/view/61f517131b38-bbf68c717460054b333a.html.
National Nuclear Safety Administration. Supervision of important safety items of nuclear power plant (HAD103/09) [DB/OL]. (1994-01-01) [2019-12-10]. https://doc.mbalib.com/view/61f517131b38-bbf68c717460054b333a.html.