Journal of Shanghai Jiaotong University ›› 2015, Vol. 49 ›› Issue (08): 1191-1198.
• Automation Technique, Computer Technology • Previous Articles Next Articles
GAO Li1a,2,ZHOU Binghai2,YANG Xueliang1b,Wang Jixia1a
Received:
2014-09-19
Online:
2015-08-31
Published:
2015-08-31
CLC Number:
GAO Li1a,2,ZHOU Binghai2,YANG Xueliang1b,Wang Jixia1a. A MultiObjective Integrated Optimization Method for FJSP Based on Multi-Rule Resource Allocation[J]. Journal of Shanghai Jiaotong University, 2015, 49(08): 1191-1198.
[1]Browning T R, Yassine A A. Resourceconstrained multiproject scheduling: Priority rule performance revisited[J]. International Journal Production Economics,2010,126(2):212228. [2]Chen James C, Wu ChengChun, Chen ChiaWen, et al. Flexible job shop scheduling with parallel machines using Genetic Algorithm and Grouping Genetic Algorithm [J]. Expert Systems with Applications,2012,39(11):1001610021.[3]Yuan Yuan, Xu Hua. Flexible job shop scheduling using hybrid differential evolution algorithms [J]. Computers & Industrial Engineering,2013,65(2):246260.[4]Chen Binchao, Timothy I Matis. A flexible dispatching rule for minimizing tardiness in job shop scheduling [J]. International Journal Production Economics,2013,141(1):361365.[5]Seren Ozmehmet Tasana, Mitsuo Gen. An integrated selection and scheduling for disjunctive network problems [J]. Computers & Industrial Engineering,2013,65(1):6576.[6]Liao Shuhsien, Hsieh Chialin, Lai Pengjen. An evolutionary approach for multiobjective optimization of the integrated location–inventory distribution network problem in vendormanaged inventory [J]. Expert Systems with Applications,2011,38(6):67686776.[7]Moradi E, Fatemi Ghomi S M T,Zandieh M. Biobjective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible jobshop problem [J]. Expert Systems with Applications, 2011,38(6):71697178.[8]Yang Jianbo, Xu Dongling, Yang Shanlin. Integrated efficiency and tradeoff analyses using a DEAoriented interactive minimax reference point approach [J]. Computers & Operations Research, 2012,39(5):10621073.[9]Tyson R Browning, Ali A Yassine. Resourceconstrained multiproject scheduling: Priority rule performance revisited [J]. International Journal Production Economics, 2010,126(2):212228. [10]Jolai F, Asefi H, Rabiee M,et al. Biobjective simulated annealing approaches for nowait twostage flexible flow shop scheduling problem [J].Scientia Iranica, Transactions E: Industrial Engineering, 2013,20(3):8611 872.[11]He Yaohua, Hui Chiwai. A rulebased genetic algorithm for the scheduling of singlestage multiproduct batch plants with parallel units [J]. Computers and Chemical Engineering, 2008,32(12):30673083.[12]Hamid Reza Qodmanan,Mahdi Nasiri,Behrouz MinaeiBidgoli. Multi objective association rule mining with genetic algorithm without specifying minimum support and minimum confidence [J]. Expert Systems with Applications, 2011,38(1):288298.[13]Philippe FournierViger, Usef Faghihi, Roger Nkambou, et al. CMRules: Mining sequential rules common to several sequences [J]. KnowledgeBased Systems,2012,25(1):6376. [14]Wang Shijin, Liu Ming. A heuristic method for twostage hybrid flow shop with dedicated machines [J]. Computers & Operations Research,2013,40(1):438450.[15]Yang Xibei, Xie Jun, Song Xiaoning, et al. Credible rules in incomplete decision system based on descriptors [J]. KnowledgeBased Systems,2009,22(1):817.[16]吴秀丽,孙树栋,余建军,等. 多目标柔性作业车间调度优化研究[J]. 计算机集成制造系统,2006, 12 (5):731736.WU Xiuli,SUN Shudong,YU Jianjun,et al. Research on multiobjective optimization for flexible job shop scheduling[J]. Computer Integrated Manufacturing Systems,2006,12 (5):731736.[17]Lu Hui, Niu Ruiyao, Liu Jing, et al. A chaotic nondominated sorting genetic algorithm for the multiobjective automatic test task scheduling problem[J]. Applied Soft Computing, 2013,22(5):27902812. [18]Hsie Machine, Chang Chingjung, Yang ITung, et al. Resourceconstrained scheduling for continuous repetitive projects with timebased production units [J]. Automation in Construction,2009,18(7):942946.[19]Ghasem Moslehi,Mehdi Mahnam. A Pareto approach to multiobjective flexible jobshop scheduling problem using particle swarm optimization and local search [J]. International Journal Production Economics,2011,129(1):1422. |
[1] | BAI Xiongfei, GONG Shuicheng, LI Xuesong, XU Bo, YANG Xiaoli, WANG Mingyan. Defect Classification of Weld Metallographic Structure Based on Data Augmentation of Poisson Fusion [J]. Journal of Shanghai Jiao Tong University, 2023, 57(10): 1316-1328. |
[2] | GAO Tao, WEN Yuanbo, CHEN Ting, ZHANG Jing. A Single Image Deraining Algorithm Based on Swin Transformer [J]. Journal of Shanghai Jiao Tong University, 2023, 57(5): 613-623. |
[3] | QIAN Peng, WANG Guoliang, ZHU Wenfeng. Modeling and Optimization of 3D Assembly Tolerance for Window Lifting Under Flexible Deformation [J]. Journal of Shanghai Jiaotong University, 2020, 54(11): 1134-1141. |
[4] | BAO Qinglin, CHAI Huaqi, ZHAO Songzheng, WANG Jilin. Model of Technology Opportunity Mining Using Machine Learning Algorithm and Its Application [J]. Journal of Shanghai Jiaotong University, 2020, 54(7): 705-717. |
[5] | LI Baihe, JIANG Zuhua, TAO Ningrong, MENG Lingtong, ZHENG Hong. Ship Block Transportation Scheduling Considering Cooperative Transportation of Flatcars [J]. Journal of Shanghai Jiaotong University, 2020, 54(7): 718-727. |
[6] | MA Zhonghang, ZHANG Zhinan. Design and Realization of a Versatile Simulation Platform for Telecontrol Multi-Rotor Unmanned Aerial Vehicle with a Robotic Arm [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 636-642. |
[7] | MENG Lingtong, JIANG Zuhua, TAO Ningrong, LIU Jianfeng, ZHENG Hong. Multi-Stockyard Scheduling Considering Technological Process and Combined Assembly Block [J]. Journal of Shanghai Jiao Tong University, 2020, 54(4): 331-343. |
[8] | ZHANG Jie,ZHAO Xinming,ZHANG Peng,SHENG Xia,CHAO Xiaona,TIAN Fengxiang. Early Warning Method for Tardiness Precaution Oriented to Rocket Final Assembly Process [J]. Journal of Shanghai Jiaotong University, 2020, 54(3): 322-330. |
[9] | SUN Mingyang,YAN Guozheng,LIU Dasheng,WANG Zhiwu,HAN Ding,ZHAO Kai,YANG Lei. High Accuracy Ultra Wideband Real Time Location System for Drug Rehabilitation Center [J]. Journal of Shanghai Jiaotong University, 2020, 54(1): 76-84. |
[10] | LUO Xiyi,HUO Xiaoyang,FU Luoyi. Query Optimization of Data Based on Window Function and Distributed Cluster in Visual Academic Search System [J]. Journal of Shanghai Jiaotong University, 2019, 53(8): 978-982. |
[11] | ZHANG Yungang,YANG Jianfeng,YI Benshun. Improved Residual Encoder-Decoder Network for Low-Dose CT Image Denoising [J]. Journal of Shanghai Jiaotong University, 2019, 53(8): 983-989. |
[12] | WANG Hongyu,YIN Wurong,WANG Liang,HU Jianghao,QIAO Wenchao. Fast Edge Extraction Algorithm Based on HSV Color Space [J]. Journal of Shanghai Jiaotong University, 2019, 53(7): 765-772. |
[13] | ZHOU Binghai,LIU Wenlong. Multi-Objective Hybrid Flow-Shop Scheduling Problem Considering Energy Consumption and On-Time Delivery [J]. Journal of Shanghai Jiaotong University, 2019, 53(7): 773-779. |
[14] | MENG Lingtong,JIANG Zuhua,TAO Ningrong,LIU Jianfeng,LI Baihe. Combined Assembly Block Scheduling in Storage Yard of Shipbuilding [J]. Journal of Shanghai Jiaotong University, 2019, 53(7): 780-788. |
[15] | JIANG Xudong,LI Pengfei,LIU Zheng,TENG Xiaoyan. Arterial Injury Assessment by Computational Interaction Model of Shear Thinning Blood with Expanded Stenotic Vascular [J]. Journal of Shanghai Jiaotong University, 2019, 53(6): 757-764. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||