Journal of Shanghai Jiaotong University ›› 2012, Vol. 46 ›› Issue (12): 2003-2008.
• Others • Previous Articles Next Articles
LU Han-Dong, HE Wei-Ping, ZHOU Xu, LI Ya-Jie
Received:2011-12-26
Online:2012-12-29
Published:2012-12-29
CLC Number:
LU Han-Dong, HE Wei-Ping, ZHOU Xu, LI Ya-Jie. An Integrated Tabu Search Algorithm for the Lot Streaming Problem in Flexible Job Shops[J]. Journal of Shanghai Jiaotong University, 2012, 46(12): 2003-2008.
| [1]Pezzella F, Morganti G, Ciaschetti G. A genetic algorithm for the flexible jobshop scheduling problem[J]. Computers & Operations Research, 2008,35(10): 32023212.[2]潘全科,朱剑英.多工艺路线的批量生产调度优化[J].机械工程学报,2004,40(4):3639.PAN Quanke, ZHU Jianying. Optimization method for a jobshop scheduling problem with alternative machines in the batch process [J]. Chinese Journal of Mechanical Engineering,2004,40(4):3639 .[3]Low C Y, Hsu C M, Huang K I. Benefits of lot splitting in jobshop scheduling [J]. International Journal of Advanced Manufacturing Technology, 2004, 24( 9/10): 773780.[4]Jeong H I, Park J W, Leachman R C. A batch splitting method for a job shop scheduling problem in an MRP environment[J]. International Journal of Production Research, 1999, 37(15): 35833598.[5]孙志峻,安进,黄卫清.作业车间多工艺路线批量作业计划优化[J].中国机械工程, 2008,19(2): 183187.SUN Zhijun, AN Jin , HUANG Weiqing. Lot scheduling with multiple process routes in Job Shop[J] . China Mechanical Engineering, 2008, 19(2):183187.[6]白俊杰,龚毅光,王宁生,等.多目标柔性作业车间分批优化调度[J].计算机集成制造系统,2010,16(2):396403.BAI Junjie, GONG Yiguang,WANG Ningsheng,et al. Multiobjective flexible Job Shop scheduling with lotsplitting[J]. Computer Integrated Manufacturing Systems,2010,16(2):396403.[7]王凌.智能优化算法及其应用[M].北京:清华大学出版社,2001:6375.[8]LI Junqing, PAN Quanke, LIANG Yunchia. An effective hybrid tabu search algorithm for multiobjective flexible jobshop scheduling problems[J].Computers & Industrial Engineering, 2010,59(4): 647662.[9]Parviz Fattahi M. Flexible job shop scheduling with tabu search algorithms[J]. The International Journal of Advanced Manufacturing Technology, 2007,32(5/6):563570.[10]Buscher U, SHEN Liji. An integrated tabu search algorithm for the lot streaming problem in job shops [J]. European Journal of Operational Research, 2009,199(2):385399.[11]Yazdani M, Amiri M, Zandieh M. Flexible jobshop scheduling with parallel variable neighborhood search algorithm[J]. Expert Systems with Applications, 2010,37(1):678687.[12]苏子林.车间调度问题及其进化算法分析[J].机械工程学报, 2008,44(8):242247.SU Zilin. Jobshop scheduling problem and its evolution algorithm analysis[J]. Chinese Journal of Mechanical Engineering, 2008,44(8):242247.[13]Kacem I, Hammadi S, BORNE P. Approach by localization and multiobjective evolutionary optimization for flexible jobshop scheduling problems[J]. IEEE Transactions on Systems, Man, and Cybernetics, 2002, 32(1): 113. |
| [1] | YANG Yinguo, FENG Yinying, WEI Wei, XIE Pingping, CHEN Yue. Coordinated Day-Ahead Scheduling and Real-Time Dispatch of a Wind-Thermal-Storage Energy Base Considering Flexibility Interval [J]. Journal of Shanghai Jiao Tong University, 2025, 59(9): 1270-1280. |
| [2] | ZHANG Li, WANG Bao, JIA Jianxiong, SONG Zhumeng, YE Yutong, YU Yue, LIN Jiaqing, XU Xiaoyuan. End-to-End Collaborative Optimization Method for Microgrid Power Prediction and Optimal Scheduling [J]. Journal of Shanghai Jiao Tong University, 2025, 59(6): 720-731. |
| [3] | CHEN Shi, YANG Linsen, LIU Yihong, LUO Huan, ZANG Tianlei, ZHOU Buxiang. Optimal Scheduling Strategy of Newly-Built Microgrid in Small Sample Data-Driven Mode [J]. Journal of Shanghai Jiao Tong University, 2025, 59(6): 732-745. |
| [4] | ZHONG Ming, WU Ying, WU Chunli, WANG Fang. Tugboat Scheduling Problem Considering Time Windows and Flexible Returning Way to Base [J]. J Shanghai Jiaotong Univ Sci, 2025, 30(6): 1276-1288. |
| [5] | ZHAO Yingying, QIU Yue, ZHU Tianchen, LI Fan, SU Yun, TAI Zhenying, SUN Qingyun, FAN Hang. Online Steady-State Scheduling of New Power Systems Based on Hierarchical Reinforcement Learning [J]. Journal of Shanghai Jiao Tong University, 2025, 59(3): 400-412. |
| [6] | QIU Zizhang, WANG Dawang, LU Zhifeng, WU Guohua. An Illuminator Resource Scheduling Methods Based on Tabu Search [J]. Air & Space Defense, 2025, 8(3): 132-140. |
| [7] | HU Kaiqiang, CAI Zexiang, CAI Yu, QU Jing, LIU Yuanyuan. Micro-Service Scheduling Model and Optimization for Protection and Control of Distribution Network Considering Virtualization Delay [J]. Journal of Shanghai Jiao Tong University, 2025, 59(11): 1684-1693. |
| [8] | ZHANG Jianhua, YAO Yi, ZHAO Si, WANG Yongyue. A Coordinated Control Scheme for Fast Frequency Regulation of Thermal Power Units Based on Flexibility Transformation [J]. Journal of Shanghai Jiao Tong University, 2025, 59(11): 1694-1706. |
| [9] | WANG Xuan, WANG Bao, CHEN Yanping, LIU Hong, MA Xiaohui. Joint Economic Optimization of AGV Logistics Scheduling and Orderly Charging in a Low-Carbon Automated Terminal [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1370-1380. |
| [10] | ZHOU Siyi, YANG Huanhong, HUANG Wentao, ZHOU Ze, JIAO Wei, YANG Zhenyu. Two-Stage Day-Ahead and Intra-Day Rolling Optimization Scheduling of Container Integrated Port Energy System [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1357-1369. |
| [11] | JIANG Zuhua1∗(蒋祖华), ZHOU Hongming2(周宏明), TAO Ningrong3(陶宁蓉), LI Baihe1(李柏鹤). Knowledge-Based Curved Block Construction Scheduling and Application in Shipbuilding [J]. J Shanghai Jiaotong Univ Sci, 2024, 29(5): 759-765. |
| [12] | CHEN Yini(陈旖旎), JIANG Zuhua* (蒋祖华). Multi-AGVs Scheduling with Vehicle Conflict Consideration in Ship Outfitting Items Warehouse [J]. J Shanghai Jiaotong Univ Sci, 2024, 29(3): 492-508. |
| [13] | GU Huijie, ZHOU Huafeng, PENG Chaoyi, HU Yaping, ZHAO Xinyi, XIE Jun, SHI Xionghua. A Multi-Time Scale Scheduling Model for Power Generation Systems with a High Proportion of New Energy Including Pumped Storage Power Stations [J]. Journal of Shanghai Jiao Tong University, 2024, 58(12): 1957-1967. |
| [14] | YE Zhiliang, LI Canbing, ZHANG Yongjun, LI Licheng, XIAO Yinjing, WU Yuhang, TAI Nengling. Optimization of Day-Ahead Dispatch Time Resolution in Power System with a High Proportion of Climate-Sensitive Renewable Energy Sources [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 781-790. |
| [15] | LI Junshuang, HU Yan, TAI Nengling. Collaborative Optimization Scheduling of 5G Base Station Energy Storage and Distribution Network Considering Communication Load and Power Supply Reliability [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 791-802. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||