Journal of Shanghai Jiaotong University ›› 2012, Vol. 46 ›› Issue (12): 2003-2008.
• Others • Previous Articles Next Articles
LU Han-Dong, HE Wei-Ping, ZHOU Xu, LI Ya-Jie
Received:
2011-12-26
Online:
2012-12-29
Published:
2012-12-29
CLC Number:
LU Han-Dong, HE Wei-Ping, ZHOU Xu, LI Ya-Jie. An Integrated Tabu Search Algorithm for the Lot Streaming Problem in Flexible Job Shops[J]. Journal of Shanghai Jiaotong University, 2012, 46(12): 2003-2008.
[1]Pezzella F, Morganti G, Ciaschetti G. A genetic algorithm for the flexible jobshop scheduling problem[J]. Computers & Operations Research, 2008,35(10): 32023212. [2]潘全科,朱剑英.多工艺路线的批量生产调度优化[J].机械工程学报,2004,40(4):3639. PAN Quanke, ZHU Jianying. Optimization method for a jobshop scheduling problem with alternative machines in the batch process [J]. Chinese Journal of Mechanical Engineering,2004,40(4):3639 . [3]Low C Y, Hsu C M, Huang K I. Benefits of lot splitting in jobshop scheduling [J]. International Journal of Advanced Manufacturing Technology, 2004, 24( 9/10): 773780. [4]Jeong H I, Park J W, Leachman R C. A batch splitting method for a job shop scheduling problem in an MRP environment[J]. International Journal of Production Research, 1999, 37(15): 35833598. [5]孙志峻,安进,黄卫清.作业车间多工艺路线批量作业计划优化[J].中国机械工程, 2008,19(2): 183187. SUN Zhijun, AN Jin , HUANG Weiqing. Lot scheduling with multiple process routes in Job Shop[J] . China Mechanical Engineering, 2008, 19(2):183187. [6]白俊杰,龚毅光,王宁生,等.多目标柔性作业车间分批优化调度[J].计算机集成制造系统,2010,16(2):396403. BAI Junjie, GONG Yiguang,WANG Ningsheng,et al. Multiobjective flexible Job Shop scheduling with lotsplitting[J]. Computer Integrated Manufacturing Systems,2010,16(2):396403. [7]王凌.智能优化算法及其应用[M].北京:清华大学出版社,2001:6375. [8]LI Junqing, PAN Quanke, LIANG Yunchia. An effective hybrid tabu search algorithm for multiobjective flexible jobshop scheduling problems[J].Computers & Industrial Engineering, 2010,59(4): 647662. [9]Parviz Fattahi M. Flexible job shop scheduling with tabu search algorithms[J]. The International Journal of Advanced Manufacturing Technology, 2007,32(5/6):563570. [10]Buscher U, SHEN Liji. An integrated tabu search algorithm for the lot streaming problem in job shops [J]. European Journal of Operational Research, 2009,199(2):385399. [11]Yazdani M, Amiri M, Zandieh M. Flexible jobshop scheduling with parallel variable neighborhood search algorithm[J]. Expert Systems with Applications, 2010,37(1):678687. [12]苏子林.车间调度问题及其进化算法分析[J].机械工程学报, 2008,44(8):242247. SU Zilin. Jobshop scheduling problem and its evolution algorithm analysis[J]. Chinese Journal of Mechanical Engineering, 2008,44(8):242247. [13]Kacem I, Hammadi S, BORNE P. Approach by localization and multiobjective evolutionary optimization for flexible jobshop scheduling problems[J]. IEEE Transactions on Systems, Man, and Cybernetics, 2002, 32(1): 113. |
[1] | LIU Yahui, SHEN Xingwang, GU Xinghai, PENG Tao, BAO Jinsong, ZHANG Dan. A Dual-System Reinforcement Learning Method for Flexible Job Shop Dynamic Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(9): 1262-1275. |
[2] | LI Dechang, YANG Hualong, DUAN Jingru. A Joint Optimization of Vessel Scheduling and Refueling Strategy for Container Liner Shipping with Cooperative Agreements [J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 953-964. |
[3] | LI Linyan, HAN Shuang, QIAO Yanhui, LI Li, LIU Yongqian, YAN Jie, LIU Haidong. A Wind-Solar-Electric Vehicles Coordination Scheduling Method for High Proportion New Energy Grid-Connected Scenarios [J]. Journal of Shanghai Jiao Tong University, 2022, 56(5): 554-563. |
[4] | WANG Zixiang, WU Zerui, LIU Ran. Weekly Physician Scheduling for Emergency Departments with Time-Varying Demands of Patients with Revisits [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 242-252. |
[5] | TANG Hongtao, WANG Dannan, SHAO Yiping, ZHAO Wenbin, JIANG Weiguang, CHEN Qingfeng. A Modified Migrating Birds Optimization for Multi-Objective Lot Streaming Hybrid Flowshop Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 201-213. |
[6] | LU Qiuyu, YU Zhen, YANG Yinguo, LI Li. Two-Stage Optimal Schedule of Offshore Wind-Power-Integrated Multi-Microgrid Considering Uncertain Power of Sources and Loads [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1308-1316. |
[7] | WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints [J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110. |
[8] | JIANG Xiaokang, ZHANG Peng, LÜ Youlong, ZHAO Xinming, ZHANG Jie. Hybrid Ant Colony Algorithm for Batch Scheduling in Semiconductor Furnace Operation [J]. Journal of Shanghai Jiaotong University, 2020, 54(8): 792-804. |
[9] | LI Baihe, JIANG Zuhua, TAO Ningrong, MENG Lingtong, ZHENG Hong. Ship Block Transportation Scheduling Considering Cooperative Transportation of Flatcars [J]. Journal of Shanghai Jiaotong University, 2020, 54(7): 718-727. |
[10] | ZHU Hongwei, LU Zhiqiang. Modeling and Optimization of Resource Constrained Project Scheduling Problem Considering Employee-Timetabling [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 624-635. |
[11] | MENG Lingtong, JIANG Zuhua, TAO Ningrong, LIU Jianfeng, ZHENG Hong. Multi-Stockyard Scheduling Considering Technological Process and Combined Assembly Block [J]. Journal of Shanghai Jiao Tong University, 2020, 54(4): 331-343. |
[12] | MA Changpu,ZHOU Binghai. Scheduling of Multi-Load Rail Guided Vehicles in AS/RS with Collision Avoidance Constrains [J]. Journal of Shanghai Jiaotong University, 2020, 54(2): 126-134. |
[13] | FANG Jia, LU Zhiqiang. Modeling and Optimization of Robust Scheduling Template Considering Equipment Failure [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1278-1290. |
[14] | ZHAO Rui, GU Xingsheng. A Discrete Sine Optimization Algorithm for No-Idle Flow-Shop Scheduling Problem [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1291-1299. |
[15] | CUI Weiwei (崔维伟). Approximate Approach to Deal with the Uncertainty in Integrated Production Scheduling and Maintenance Planning [J]. Journal of Shanghai Jiao Tong University (Science), 2020, 25(1): 106-117. |
Viewed | ||||||||||||||||||||||||||||||||||||||||||||||||||
Full text 439
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||
Abstract 3109
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||