Journal of Shanghai Jiao Tong University ›› 2023, Vol. 57 ›› Issue (11): 1522-1530.doi: 10.16183/j.cnki.jsjtu.2022.023

Special Issue: 《上海交通大学学报》2023年“机械与动力工程”专题

• Mechanical Engineering • Previous Articles    

Sequential Preventive Maintenance Strategy Considering Difference of Maintenance Effect

LI Xinlong1, RAN Yan1, ZHANG Genbao1,2,3(), HE Yan1,2   

  1. 1. College of Mechanical and Vehicle Engineering, Chongqing University, Chongqing 400044, China
    2. State Key Laboratory of Mechanical Transmission, Chongqing University, Chongqing 400044, China
    3. School of Intelligent Manufacturing Engineering, Chongqing University of Arts and Sciences, Chongqing 402160, China
  • Received:2022-01-24 Revised:2022-02-28 Accepted:2022-08-10 Online:2023-11-28 Published:2023-12-01

Abstract:

Proper preventive maintenance can improve equipment reliability and prolong equipment life to a certain extent. Aimed at the problems that the decision granularity of the current preventive maintenance strategy is too large and the maintenance effect of preventive maintenance on different types of failures is rarely considered, the imperfect sequential preventive maintenance strategy of the meta-action unit is studied. Taking the meta-action unit as the research carrier, the failures are divided into damage failure and essential fatigue failure according to the difference of preventive maintenance effect. Based on the generalized geometric process, a sequential preventive maintenance optimization model is established. The research shows that the overall maintenance cost rate will be underestimated without considering the differences in preventive maintenance effectiveness. At the same time, various types of maintenance costs, the proportion factor of damage-type failures and intrinsic fatigue-type failures, and the preventive maintenance effect parameter have a significant influence on the formulation of maintenance strategy. This research has a certain guiding role in formulating the sequential preventive maintenance strategy of meta-action unit and reducing its maintenance cost.

Key words: preventive maintenance, meta-action unit, generalized geometric process(GGP), sequential maintenance, imperfect maintenance

CLC Number: