JIA Jian-a, b , XIE Xiao-Lin-a, ZHANG Yu-a, YANG Ke-b. Techniques of the Integration Construction of Underground Space in Comprehensive Urban Transportation Hub[J]. Journal of Shanghai Jiaotong University, 2012, 46(01): 7-11.
[1]贾坚,谢小林.上海软土地区深大基坑卸荷变形机理[J].上海交通大学学报,2009,43(6): 10051010.JIA Jian, XIE Xiaolin. Unloading deformation mechanism of deeplarge excavation in shanghai clay area [J]. Journal of Shanghai Jiaotong University, 2009, 43(6):10051010.[2]龚晓南.关于基坑工程的几点思考[J].土木工程学报,2005,38(9): 99102.GONG Xiaonan. Considerations on foundation pit engineering [J]. China Civil Engineering Journal, 2005, 38 (9): 99102.[3]周志强,钟显奇,宋金良, 等.广州海心沙地铁站坑中坑支护技术[J].施工技术,2011,40 (1): 8689.ZHOU Zhiqiang, ZHONG Xianqi, SONG Jinliang, et al. Support technology of pit in foundation pit of haixinsha metro in Guangzhou [J]. Construction Technology, 2011, 40 (1): 8689.[4]张睿华.深大基坑内相邻基坑施工时的相互影响分析[J].建筑施工,2008,30(10): 869871.ZHANG Ruihua. Analysis of mutual impact of nearby foundation pits construction in deep and large foundat ion pit [J]. Building Construction, 2008, 30(10):869871.[5]铁建设函[2005]285号, 新建时速200公里客货共线铁路设计暂行规定[S].[6]铁运函[2004]120号, 铁路桥梁检定规范[S].[7]贾坚,谢小林.上海地下综合体的建造模式及沉降耦合控制[J]. 建筑结构, 2009, 38(9): 7173.JIA Jian, XIE Xiaolin. The construction mode and settlement coordination of underground urban complex in Shanghai [J]. Building Structure, 2008, 38(9): 7173.