Journal of Shanghai Jiaotong University ›› 2012, Vol. 46 ›› Issue (01): 47-52.
• Architechural Science • Previous Articles Next Articles
LIAO Shao-Ming-1, XU Yi-Zhi-1, CHEN Li-Sheng-2, SHEN Cheng-Ming-2
Received:2011-06-16
Online:2012-01-30
Published:2012-01-30
CLC Number:
LIAO Shao-Ming-1, XU Yi-Zhi-1, CHEN Li-Sheng-2, SHEN Cheng-Ming-2. Shield Type Selection and Its Control on Tunneling Across Various Structures[J]. Journal of Shanghai Jiaotong University, 2012, 46(01): 47-52.
| [1]刘建航. 上海地铁一号线地下工程的技术概要[J]. 建筑施工,1996 (1): 58.LIU Jianhang. Technical summary on underground engineering for Shanghai No.1 metro line [J]. Architecture Construction, 1996 (1): 58.[2]肖立,张庆贺. 盾构长距离下穿铁路股道引起的地表沉降分析[J]. 上海交通大学学报, 2011, 45(5): 672676.XIAO Li, ZHANG Qinghe. Study on ground settlement caused by shield tunneling long distance across multitracks[J]. Journal of Shanghai Jiaotong University, 2011, 45(5): 672676.[3]陈亮, 黄宏伟, 王如路.近距离上部穿越对原有隧道沉降的影响分析[J]. 土木工程学报, 2006, 39 (6): 8487.CHEN Liang, HUANG Hongwei, WANG Rulu. Analysis of the observed longitudinal settlement of a tunnel caused by an adjacent shield tunneling on top [J]. China Civil Engineering Journal, 2006, 39 (6): 8487.[4]廖少明, 杨俊龙, 奚程磊. 盾构近距离穿越施工的工作面土压力研究[J]. 岩土力学, 2005, 26 (11): 17271730.LIAO Shaoming, YANG Junlong, XI Chenglei. Approach to earth balance pressure of shield tunneling across ultranear metro tunnel in operation[J]. Rock and Soil Mechanics, 2005, 26 (11): 17271730.[5]廖少明, 余炎, 李文林. 地中弹性边界对盾构近距离掘进位移场的影响[J]. 岩石力学与工程学报, 2005, 24 (19): 35343540. LIAO Shaoming, YU Yan, LI Wenlin. Effects of elastic boundary in ground on displacement field induced by shield tunneling[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (19): 35343540. [6]LIAO Shaoming, LIU Jianhang, WANG Rulu. Shield tunneling and environment protection in Shanghai soft ground[J]. Tunneling and Underground Space Technology, 2009, 24 (4):454465. |
| [1] | YU Yi. Anti-Scouring Design Scheme and the Construction for Single Pile Foundation of Offshore Wind Power Projects [J]. Ocean Engineering Equipment and Technology, 2025, 12(1): 94-99. |
| [2] | SONG Junlin, LIU Bo, TANG Liheng, LIAO Chencong. Centrifuge Tests on Vertical Bearing Capacity of Jacket Pile Foundation in Clay Seabed Under Different Grouting Effects [J]. Journal of Shanghai Jiao Tong University, 2025, 59(1): 38-47. |
| [3] | ZHANG Jianxiang, SONG Yunfeng, LU peng. Research on Key Technology of Monpile Foundation Installation in Offshore Wind Farms [J]. Ocean Engineering Equipment and Technology, 2024, 11(4): 117-124. |
| [4] | HU Guofeng, DOU Qiwei. 3D Enhanced Imaging Technology for Offshore Wind Power Pile Foundation [J]. Ocean Engineering Equipment and Technology, 2024, 11(3): 42-48. |
| [5] | WANG Baokun, WANG Rulu, CHEN Jinjian, PAN Yue, WANG Lujie. Automatic Detection Method for Surface Diseases of Shield Tunnel Based on Deep Learning [J]. Journal of Shanghai Jiao Tong University, 2024, 58(11): 1716-1723. |
| [6] | FAN Changhui. A Brief Summary of Key Points for The Installation of Offshore Wind Turbine Monopile Foundation [J]. Ocean Engineering Equipment and Technology, 2023, 10(2): 1-7. |
| [7] | YING Hongwei, YAO Yan, WANG Kuihua, ZHANG Changju. Observed Environment Response Caused by Construction of Double-Line Parallel Pipe Jacking Crossing over Metro Shield Tunnels [J]. Journal of Shanghai Jiao Tong University, 2023, 57(12): 1639-1647. |
| [8] | LI Ruyu, WU Xiaoni, CHEN Jinjian, JIANG Haili, WANG Huili. Numerical Analysis of Force of Fluidized Solidified Slurry in Pumping for Scour Repair on Offshore Pile Foundation [J]. Journal of Shanghai Jiao Tong University, 2023, 57(12): 1609-1618. |
| [9] | ZHU Yeting, MIN Rui, QIN Yuan, WU Wenfei, YUAN Peng, ZHAI Yixin, ZHU Yanfei. Development and Application of a Model Test Platform of Synchronous Technology Combining Shield Tunneling with Segment Assembling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 897-907. |
| [10] | CHEN Renpeng, WANG Zhiteng, WU Huaina, LIU Yuan, MENG Fanyan. Risk Assessment for Shield Tunneling Beneath Buildings Based on Interval Improved TOPSIS Method and FAHP Method [J]. Journal of Shanghai Jiao Tong University, 2022, 56(12): 1710-1719. |
| [11] | WANG Rongyong, LIU Linqi, WANG Yingyi, HUANG Xingchun. Calculation Method of Pile Foundation Settlement Displacement Based on Virtual Column Equivalent Model [J]. Journal of Shanghai Jiao Tong University, 2021, 55(9): 1126-1133. |
| [12] | ZHANG Zixin,XIAO Shihui,LIU Tongwei,HUANG Xin,HE Ren. Field Test and Numerical Analysis of a New Water-Proof System for a Shield Tunnel [J]. Journal of Shanghai Jiaotong University, 2019, 53(6): 688-695. |
| [13] | YANG Junlong,MEN Yanqing,LIAO Shaoming,GAO Dongqi,SU Fengbin. The Effect and Construction Control of Large Diameter Shield Tunneling Under Railway Culvert [J]. Journal of Shanghai Jiaotong University, 2019, 53(3): 297-304. |
| [14] | ZHANG Yizhou, LIAO Chencong, CHEN Jinjian. Interaction Between Mono-Pile and Porous Seabed Under Cnoidal Wave and Pile Rocking [J]. Journal of Shanghai Jiao Tong University, 2019, 53(1): 85-92. |
| [15] | YING Hongwei,SHEN Huawei,ZHANG Jinhong,ZHU Chengwei. Semi-Analytical Solution of Limit Support Pressure on Shield Tunnel Face Subjected to Water Level Fluctuation [J]. Journal of Shanghai Jiao Tong University, 2018, 52(8): 982-990. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||