Journal of Shanghai Jiao Tong University ›› 2022, Vol. 56 ›› Issue (7): 897-907.doi: 10.16183/j.cnki.jsjtu.2021.241
• Transportation Engineering • Previous Articles Next Articles
ZHU Yeting(), MIN Rui, QIN Yuan, WU Wenfei, YUAN Peng, ZHAI Yixin, ZHU Yanfei
Received:
2021-07-06
Online:
2022-07-28
Published:
2022-08-16
CLC Number:
ZHU Yeting, MIN Rui, QIN Yuan, WU Wenfei, YUAN Peng, ZHAI Yixin, ZHU Yanfei. Development and Application of a Model Test Platform of Synchronous Technology Combining Shield Tunneling with Segment Assembling[J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 897-907.
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/10.16183/j.cnki.jsjtu.2021.241
[1] | 张康, 黄亦翔, 赵帅, 等. 基于t-SNE数据驱动模型的盾构装备刀盘健康评估[J]. 机械工程学报, 2019, 55(7): 19-26. |
ZHANG Kang, HUANG Yixiang, ZHAO Shuai, et al. Health assessment of shield equipment cutterhead based on t-SNE data-driven model[J]. Journal of Mechanical Engineering, 2019, 55(7): 19-26.
doi: 10.3901/JME.2019.07.019 |
|
[2] |
LIU Q S, LIU J P, PAN Y C, et al. A wear rule and cutter life prediction model of a 20-in. TBM cutter for granite: A case study of a water conveyance tunnel in China[J]. Rock Mechanics and Rock Engineering, 2017, 50(5): 1303-1320.
doi: 10.1007/s00603-017-1176-4 URL |
[3] | 王吉云. 近十年来中国超大直径盾构施工经验[J]. 隧道建设, 2017, 37(3): 330-335. |
WANG Jiyun. Super-large diameter shield tunneling technologies in China in recent decade[J]. Tunnel Construction, 2017, 37(3): 330-335. | |
[4] | 洪开荣. 我国隧道及地下工程近两年的发展与展望[J]. 隧道建设, 2017, 37(2): 123-134. |
HONG Kairong. Development and prospects of tunnels and underground works in China in recent two years[J]. Tunnel Construction, 2017, 37(2): 123-134. | |
[5] | LIU T J, HUANG H H, YAN Z R, et al. A case study on key techniques for long-distance sea-crossing shield tunneling[J]. Marine Georesources & Geotechnology, 2020, 38(7): 786-803. |
[6] | XU C J, LIU Y K, CAO Z G. Numerical analysis and comparison of soil freezing schemes for replacement of shield tail brush in long-distance tunnel engineering[J]. European Journal of Environmental and Civil Engineering, 2018, 22(Sup. 1): 316-332. |
[7] | 张昭. 郑州地铁砂性地层盾构长距离掘进技术研究[J]. 隧道建设, 2017, 37(7): 851-856. |
ZHANG Zhao. Technology for long-distance boring of shield in sandy strata: A case study of Zhengzhou metro[J]. Tunnel Construction, 2017, 37(7): 851-856. | |
[8] | 王卫东, 丁文其, 杨秀仁, 等. 基坑工程与地下工程: 高效节能、环境低影响及可持续发展新技术[J]. 土木工程学报, 2020, 53(7): 78-98. |
WANG Weidong, DING Wenqi, YANG Xiuren, et al. Deep excavation engineering and underground engineering—New techniques of high-efficiency and energy-saving, low environmental impact, and sustainable development[J]. China Civil Engineering Journal, 2020, 53(7): 78-98. | |
[9] | 周双禧, 李志华, 陈非龙, 等. 城市轨道交通盾构法隧道施工新技术及应用[J]. 施工技术, 2020, 49(19): 87-92. |
ZHOU Shuangxi, LI Zhihua, CHEN Feilong, et al. New technology and application of shield tunnelling method in urban rail transit tunnels excavation[J]. Construction Technology, 2020, 49(19): 87-92. | |
[10] |
ZHANG Y Q, ZHANG J M, GUO H L, et al. A risk assessment method for metro shield tunnel construction based on interval number[J]. Geotechnical and Geological Engineering, 2020, 38(5): 4793-4809.
doi: 10.1007/s10706-020-01328-z URL |
[11] | 林裕悟, 鹿島竜之介, 島厚夫. F-NAVIシールド工法による高速施工の事例紹介--掘削·セグメント組立同時施工での施工実績 (特集 シールド機械と施工)[J]. Construction Machinery and Equipment, 2008, 44(8): 20-26. |
HAYASHI Yugo, RYUNOSUKE Kajima, TOSHIO Shima. Case introduction of F-NAVI high-speed shield construction method: Construction examples of synchronous operation combining the shield tunnelling and segment assembling[J]. Construction Machinery and Equipment, 2008, 44(8): 20-26. | |
[12] | 齋藤進, 室木紀彦, 山本邦男. ラチス式同時施工シールド工法による長距離施工--大阪府寝屋川流域恩智川東幹線下水道工事[J]. Tunnels and Underground, 1999, 30: 717-724. |
SUZUMI Saito, NORIHIKO Muroki, KUNIO Yamamoto. Long distance shield tunnel construction by lattice tunneling method: Project of Eizugawa River main line in Neyagawa River, Osaka Prefecture[J]. Tunnels and Underground, 1999, 30: 717-724. | |
[13] | 須田悦弘. ダブルジャッキ式同時掘進工法の開発 (その3)-東西連係ガス導管新設工事 (富津工区) への適用-[J]. 土木学会第60回年次講演会, 2005, 9: 193-194. |
HIROSHI Suda. Development of double hydro-cylinder type shield method—Part 3: Application to gas conduit project connecting East and West (Futsu works)[J]. The 60th Annual Lecture of Civil Engineering Society, 2005, 9: 193-194. | |
[14] | 奥村組. 新技術活用シリーズ 「国土技術開発賞」最優秀賞受賞 ハニカムセグメントを用いた同時施工法[J]. 建設オピニオン, 2006, 13: 1-4. |
OKUMURA Kumi. “New technology flexible use system” won the best award, using the synchronous construction method of honeycomb segments[J]. Construction Insights, 2006, 13: 1-4. | |
[15] | 西明良. ロスゼロ工法-シールド部分同時施工法[J]. 土地改良, 2007, 45: 1-3. |
FUKUAKYOSI. LoseZero method:Partial synchronization shield construction method[J]. Land Improvement, 2007, 45: 1-3. |
[1] | YANG Junlong,MEN Yanqing,LIAO Shaoming,GAO Dongqi,SU Fengbin. The Effect and Construction Control of Large Diameter Shield Tunneling Under Railway Culvert [J]. Journal of Shanghai Jiaotong University, 2019, 53(3): 297-304. |
[2] | YU Hongjie,DONG Yixuan. Synchronization of the Composite Network Constructed by the R?ssler Chaotic System [J]. Journal of Shanghai Jiaotong University, 2018, 52(12): 1559-1564. |
[3] | JING Lianyou1,HE Chengbing1,HUANG Jianguo1,MENG Qinwei2,ZHANG Qunfei1. Differential Cyclic Shift Keying Spread-Spectrum Underwater Acoustic Communication Based on Passive Time-Reversal [J]. Journal of Shanghai Jiaotong University, 2014, 48(10): 1378-1383. |
[4] | SHI Chao1,QIU Hongbing1,2,WANG Junyi2,LI Xiaoyan1. Time Synchronization for Wireless Sensor Networks Based on Gossip Algorithm [J]. Journal of Shanghai Jiaotong University, 2014, 48(03): 351-356. |
[5] | ZHANG Zi-xin1* (张子新), SHEN Mang-jie1 (沈铓杰), TENG Li2 (滕 丽). Back-Analysis of the Response of Shield Tunneling by 3D Finite Element Method [J]. Journal of shanghai Jiaotong University (Science), 2013, 18(3): 298-305. |
[6] | ZHANG Wen-Long, YU Hong-Jie. Chaotic Synchronization of a Type of Star-Shaped Neural Network [J]. Journal of Shanghai Jiaotong University, 2013, 47(02): 220-225. |
[7] | WANG Xin-1, JIN Xian-Long-1, YANG Pei-Zhong-1, WU Hui-Ming-2. Numerical Simulation on Blocking Smoke Effect of Shield Machine Water Curtain [J]. Journal of Shanghai Jiaotong University, 2012, 46(01): 126-129. |
[8] | XIAO Li, ZHANG Qing-He. Study on Ground Settlement Caused by Shield Tunneling Long Distance Across Multitracks [J]. Journal of Shanghai Jiaotong University, 2011, 45(05): 672-676. |
[9] |
LIU Yuliang1,2,3,ZHU Jie1,ZHANG Hua2 . Synchronization Control Strategy between Heterogeneous Structures Hyperchaotic Systems [J]. Journal of Shanghai Jiaotong University, 2010, 44(11): 1513-1518. |
[10] | QIAN Huijiaa,YANG Minga,LI Haoa,WANG Chun xiangb. A Pedestrian Detection Method Based on Laser Scanner and Camera [J]. Journal of Shanghai Jiaotong University, 2010, 44(07): 946-0950. |
[11] | ZENG Zhibinga,ZHUANG Yiqia,XIANG Xinb. An Improved Algorithm of Mary SpreadSpectrum Communication [J]. Journal of Shanghai Jiaotong University, 2010, 44(07): 1010-1013. |
[12] | YANG Zhongzhi,LI Li. Empirical Study on Spectrum Analysis of Business Cycle Synchronization in Chinese Regions [J]. Journal of Shanghai Jiaotong University, 2010, 44(03): 326-0331. |
[13] |
GUO Yi, LIU Gang, GE Jian-hua, ZHANG Wu-jun.
A Novel Time and Frequency Synchronization Scheme for Orthogonal Frequency Division Multiplexing Systems [J]. Journal of Shanghai Jiaotong University, 2008, 42(10): 1754-1757. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||