[1]周金宏, 汪定伟. 分布式多工厂单件制造企业提前/拖期生产计划研究[J]. 计算机集成制造系统, 2000, 6(5): 5257.ZHOU Jinhong, WANG Dinwei. Earliness and tardiness production planning with duedate for multilocation OKP manufacturing systems[J]. Computer Integrated Manufacturing Systems, 2000, 6(5):5257.[2]周金宏, 汪定伟. 基于模糊交货期分布式多工厂单件制造业的生产计划[J]. 系统工程理论方法应用, 2000, 9(3): 229234.ZHOU Jinhong, WANG Dinwei. Production planning with fuzzy due date for multilocation OKP manufacturing systems[J]. Systems EngineeringTheory Methodology Applications, 2000, 9(3):229234.[3]周金宏, 汪定伟. 软计算求解分布式多工厂单件制造业的提前/拖期生产计划问题[J]. 控制理论与应用, 2002, 19(2): 235238.ZHOU Jinhong, WANG Dinwei. Soft computing for earliness and tardiness production planning of multilocation OKP manufacturing systems[J]. Control Theory and Applications, 2002, 19(2):235238.[4]Vercellis C. Multiplant production planning in capacitated selfconfiguring twostage serial systems[J]. European Journal of Operational Research, 1999, 119(2): 451460.[5]Chen C Y, Zhao Z Y, Ball M O. A model for batch advanced availabletopromise[J]. Production & Operation Manage, 2002, 11(4):424440.[6]Pibernik R. Advanced availabletopromise: Classification, selected methods and requirements for operations and inventory management[J]. International Journal of Production Economics, 2005, 93:239252. |