Journal of Shanghai Jiao Tong University (Science) ›› 2020, Vol. 25 ›› Issue (1): 106-117.doi: 10.1007/s12204-019-2086-2
Previous Articles Next Articles
CUI Weiwei (崔维伟)
Online:2020-01-15
Published:2020-01-12
Contact:
CUI Weiwei (崔维伟)
E-mail: cuiww67@163.com
CLC Number:
CUI Weiwei (崔维伟). Approximate Approach to Deal with the Uncertainty in Integrated Production Scheduling and Maintenance Planning [J]. Journal of Shanghai Jiao Tong University (Science), 2020, 25(1): 106-117.
| [1] | LI L, SUN Z Y, XU X W, et al. Multi-zone proportional hazard model for a multi-stage degradation process [C]//ASME 2013 International Manu-facturing Science and Engineering Conference Collocated with the North American Manufacturing Research Conference. Madison, Wisconsin, USA: ASME,2013: V002T02A013. |
| [2] | YAO X F, SUN Z Y, WEI D, et al. Joint maintenance and energy management in manufacturing systems: Prospect discussion, challenge analysis, and a case study [C]//ASME 2016 International Manufacturing Science and Engineering Conference. Blacksburg, Virginia, USA: ASME, 2016: V002T04A041. |
| [3] | XIA T B, TAO X Y, XI L F. Operation process rebuilding (OPR)-oriented maintenance policy for changeable system structures [J]. IEEE Transactions on Automation Science and Engineering, 2017, 14(1): 139-148. |
| [4] | WANG S J, LIU M. Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method [J]. International Journal of Production Research, 2014, 52(5): 1495-1508. |
| [5] | JIA W Y, JIANG Z B, LI Y. Scheduling to minimize the makespan in large-piece one-of-a-kind production with machine availability constraints [J]. Expert Systems with Applications, 2015, 42(23): 9174-9182. |
| [6] | ZHENG X L, WANG L. A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints [J]. Expert Systems with Applications, 2016,65: 28-39. |
| [7] | SHAOWS, PI D C. A self-guided di?erential evolution with neighborhood search for permutation flow shop scheduling [J]. Expert Systems with Applications, 2016,51: 161-176. |
| [8] | CASSADY C R, KUTANOGLU E. Integrating preventive maintenance planning and production scheduling for a single machine [J]. IEEE Transactions on Reliability, 2005, 54(2): 304-309. |
| [9] | WANG S J, LIU M. A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning [J]. International Journal of Production Research, 2013, 51(3):847-868. |
| [10] | ABDELRAHIM E H, VIZV?ARI B. Simultaneous scheduling of production and preventive maintenance on a single machine [J]. Arabian Journal for Science &Engineering, 2016, 42(7): 2867-2883. |
| [11] | SORTRAKUL N, NACHTMANN H L, CASSADY C R. Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine [J]. Computers in Industry, 2005, 56(2):161-168. |
| [12] | DING P W, JIANG Z H, HU J W, et al. Integrating production scheduling and preventive maintenance for a single machine with due window [J]. Journal of Shanghai Jiao Tong University, 2015, 49(4): 524-530(in Chinese). |
| [13] | PEI H Y, JIANG Z H, HU J W, et al. Integrating rescheduling with preventive maintenance in the flow-shop problem under rush orders [J]. Industrial Engineering and Management, 2017, 22(1): 50-57 (in Chinese). |
| [14] | RUIZ R, GARC?IA-D?IAZ J C, MAROTO C. Considering scheduling and preventive maintenance in the flow-shop sequencing problem [J]. Computers & Operations Research, 2007, 34(11): 3314-3330. |
| [15] | JABBARIZADEH F, ZANDIEH M, TALEBI D. Hybrid flexible flowshops with sequence-dependent setup time and machine availability constraints [J]. Computers & Industrial Engineering, 2009, 57(3): 949-957. |
| [16] | NADERI B, ZANDIEH M, AMINNAYERI M. Incorporating periodic preventive maintenance into flexible flowshop scheduling problems [J]. Applied Soft Computing, 2011, 11(2): 2094-2101. |
| [17] | SEIDGAR H, ZANDIEH M, MAHDAVI I. Biobjective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem [J]. Journal of Industrial and Production Engineering, 2016, 33(6): 404-425. |
| [18] | TAO X Y, XIA T B, XI L F. Health-index-based joint optimization of preventive maintenance and multiattribute production scheduling [J]. Journal of Shanghai Jiao Tong University, 2014, 48(8): 1170-1174 (in Chinese). |
| [19] | ZHOU B H, LIU Z L. Integrated scheduling method of production and preventive maintenance in flow shops with degradations [J]. Computer Integrated Manufacturing Systems, 2016, 22(5): 1272-1278 (in Chinese). |
| [20] | YANG H B, SHEN L, CHENG M, et al. Integrated optimization of scheduling and maintenance in multi-state production systems with deterioration effects [J].Computer Integrated Manufacturing Systems, 2018,24(1): 80-88 (in Chinese). |
| [21] | XIAO L, SONG S L, CHEN X H, et al. Joint optimization of production scheduling and machine group preventive maintenance [J]. Reliability Engineering and System Safety, 2016, 146: 68-78. |
| [1] | Zhang Jingkai, Li Xinde, Wei Wangzichao, Wang Ziyao, Ma Ke. Synthetic Data-Driven Multi-Task Framework for UAV Detection and Classification [J]. J Shanghai Jiaotong Univ Sci, 2026, 31(1): 209-220. |
| [2] | MA Yonglin, LI Hao, XIONG Wei, LI Lingzhi, TANG Jingmian. Uncertainty Quantification Approach for Aerial Target Recognition Based on Hierarchical Bayesian Models [J]. Air & Space Defense, 2026, 9(1): 20-27. |
| [3] | LUO Zhijun, WANG Jianrui, YIN Jiawei. A Survey of Task-Driven Intelligent Target Recognition Methods in Complex Battlefield Environments [J]. Air & Space Defense, 2026, 9(1): 1-11. |
| [4] | YANG Yinguo, FENG Yinying, WEI Wei, XIE Pingping, CHEN Yue. Coordinated Day-Ahead Scheduling and Real-Time Dispatch of a Wind-Thermal-Storage Energy Base Considering Flexibility Interval [J]. Journal of Shanghai Jiao Tong University, 2025, 59(9): 1270-1280. |
| [5] | DENG Qianwen, LI Qi, QIU Yibin, LI Doumeng, HUO Shasha, CHEN Weirong. Optimal Allocation Method of Integrated Energy System Considering Joint Operation of Multiple Flexible Resources [J]. Journal of Shanghai Jiao Tong University, 2025, 59(7): 912-922. |
| [6] | LI Jinghao, LI Ran, HUA Hao, HUANG Wentao, GAO Fei, TAI Nengling. Reliability Allocation Method for Electric Aircraft Lightweight Propulsion System [J]. Journal of Shanghai Jiao Tong University, 2025, 59(6): 867-876. |
| [7] | WU Jing, LIU Xuanyu, LI Xiang, QI Xiaoyan, LI Chengjun, ZHANG Zhong. Impact Mechanism Analysis of Carbon Price Uncertainty on Power System Dispatch [J]. Journal of Shanghai Jiao Tong University, 2025, 59(3): 354-364. |
| [8] | LI Jianlin, ZHANG Zedong, LIANG Ce, ZENG Fei. Multi-Objective Robustness of Integrated Energy System Considering Source-Load Uncertainty [J]. Journal of Shanghai Jiao Tong University, 2025, 59(2): 175-185. |
| [9] | ZHANG Jiamin, CAI Ye, TANG Xiafei, TAN Yudong, CAO Yijia, LI Junxiong. Information Gap Decision Theory-Spectrum Clustering Typical Scenario Generation Considering Source Load Uncertainty [J]. Journal of Shanghai Jiao Tong University, 2025, 59(11): 1625-1636. |
| [10] | CHENG Mingyang, XING Haijun, MI Yang, ZHANG Shenxi, TIAN Shuxin, SHEN Jie. Two-Stage Market Joint Clearance Considering Participation of Wind/Photovoltaic/Energy Storage Power Station in Flexible Ramping [J]. Journal of Shanghai Jiao Tong University, 2025, 59(10): 1451-1463. |
| [11] | SUN Yi, LIU Zhuang, HUANG Ting, PENG Jie, WANG Xiaotian, LIU Chuang. Decision-Making Model of Electricity Procurement and Sale for Electricity Retailers Considering the Uncertainty of Prosumers [J]. Journal of Shanghai Jiao Tong University, 2025, 59(10): 1476-1486. |
| [12] | YANG Sen, GUO Ning, ZHANG Shouming. Robust Optimal Scheduling of Agricultural Microgrid Combined with Irrigation System Under Uncertainty Conditions [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1432-1442. |
| [13] | MI Yang, FU Qixin, ZHAO Haihui, MA Siyuan, WANG Yufei. Robust Optimal Scheduling of Micro Energy Grid Considering Multi-Interval Uncertainty Set of Source-Load and Integrated Demand Response [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1323-1333. |
| [14] | TIAN Shuxin, HAN Xue, FU Yang, SU Xiangjing, LI Zhenkun. Two-Stage Robust Expansion Planning of Transmission Network Considering Uncertainty of Offshore Wind Power [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1400-1409. |
| [15] | LIU Huahua, WANG Qing. Multi-Aircraft Target Assignment Method Based on Reinforcement Learning [J]. Air & Space Defense, 2024, 7(5): 65-72. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||