Journal of Shanghai Jiao Tong University (Science) ›› 2019, Vol. 24 ›› Issue (4): 500-509.doi: 10.1007/s12204-019-2080-8
Previous Articles Next Articles
WANG Lin (王林), LU Zhiqiang *(陆志强)
Online:
2019-08-01
Published:
2019-07-29
Contact:
LU Zhiqiang *(陆志强)
E-mail:zhiqianglu@tongji.edu.cn
CLC Number:
WANG Lin (王林), LU Zhiqiang *(陆志强). Proactive Approach for Production and Condition-Based Maintenance Integration Problem in a Deteriorating System[J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 500-509.
[1] AGHEZZAF E H, JAMALIM A, AIT-KADI D. An integratedproduction and preventive maintenance planningmodel [J]. European Journal of Operational Research,2007, 181(2): 679-685. [2] AGHEZZAF E H, NAJID N M. Integrated productionplanning and preventive maintenance in deterioratingproduction systems [J]. Information Sciences,2008, 178(17): 3382-3392. [3] NOURELFATH M, CH?ATELET E. Integrating production,inventory and maintenance planning for a parallelsystem with dependent components [J]. ReliabilityEngineering & System Safety, 2012, 101: 59-66. [4] LU Z, ZHANG Y, HAN X. Integrating run-based preventivemaintenance into the capacitated lot sizingproblem with reliability constraint [J]. InternationalJournal of Production Research, 2013, 51(5): 1379-1391. [5] ZHAO S,WANG L, ZHENG Y. Integrating productionplanning and maintenance: An iterative method [J].Industrial Management & Data Systems, 2014, 114(2):162-182. [6] LIU X,WANG W, PENG R. An integrated productionand delay-time based preventive maintenance planningmodel for a multi-product production system [J]. Eksploatacjai Niezawodno′s′c: Maintenance and Reliability,2015, 17(2): 215-221. [7] AGHEZZAF E H, KHATAB A, LE TAM P. Optimizingproduction and imperfect preventive maintenanceplanning’s integration in failure-prone manufacturingsystems [J]. Reliability Engineering & System Safety,2016, 145: 190-198. [8] TIAN Z, JIN T, WU B, et al. Condition based maintenanceoptimization for wind power generation systemsunder continuous monitoring [J]. Renewable Energy,2011, 36(5): 1502-1509. [9] RAUSCH M, LIAO H. Joint production and sparepart inventory control strategy driven by conditionbased maintenance [J]. IEEE Transactions on Reliability,2010, 59(3): 507-516. [10] GRALL A, B′ERENGUER C, DIEULLE L. Acondition-based maintenance policy for stochasticallydeteriorating systems [J]. Reliability Engineering &System Safety, 2002, 76(2): 167-180. [11] JARDINE A K S, LIN D, BANJEVIC D. A review onmachinery diagnostics and prognostics implementingcondition-based maintenance [J]. Mechanical Systemsand Signal Processing, 2006, 20(7): 1483-1510. [12] CHOUIKHI H, KHATAB A, REZG N. A conditionbasedmaintenance policy for a production system underexcessive environmental degradation [J]. Journalof Intelligent Manufacturing, 2014, 25(4): 727-737. [13] BOUSDEKIS A, MAGOUTAS B, APOSTOLOU D,et al. A proactive decision making framework forcondition-based maintenance [J]. Industrial Management& Data Systems, 2015, 115(7): 1225-1250. [14] DO P, VOISIN A, LEVRAT E, et al. A proactivecondition-based maintenance strategy with both perfectand imperfect maintenance actions [J]. ReliabilityEngineering & System Safety, 2015, 133: 22-32. [15] KEIZERMC A O, FLAPPER S D P, TEUNTER R H.Condition-based maintenance policies for systems withmultiple dependent components: A review [J]. EuropeanJournal of Operational Research, 2017, 261(2):405-420. [16] AHMAD R, KAMARUDDIN S. An overview of timebasedand condition-based maintenance in industrialapplication [J]. Computers & Industrial Engineering,2012, 63(1): 135-149. [17] KIM J, AHN Y, YEO H. A comparative study of timebasedmaintenance and condition-based maintenancefor optimal choice of maintenance policy [J]. Structureand Infrastructure Engineering, 2016, 12(12): 1525-1536. [18] GHASEMI A, YACOUTS, OUALIMS. Optimal conditionbased maintenance with imperfect informationand the proportional hazards model [J]. InternationalJournal of Production Research, 2007, 45(4): 989-1012. [19] TIAN Z, LIAO H. Condition based maintenance optimizationfor multi-component systems using proportionalhazards model [J]. Reliability Engineering & SystemSafety, 2011, 96(5): 581-589. [20] LU B, ZHOU X, LI Y. Joint modeling of preventivemaintenance and quality improvement for deterioratingsingle-machine manufacturing systems [J]. Computers& Industrial Engineering, 2016, 91: 188-196. [21] SLOAN T W, SHANTHIKUMAR J G. Combined productionand maintenance scheduling for a multipleproduct,single-machine production system [J]. Productionand Operations Management, 2000, 9(4): 379-399. [22] SLOAN T W. A periodic review production and maintenancemodel with random demand, deterioratingequipment, and binomial yield [J]. Journal of the OperationalResearch Society, 2004, 55(6): 647-656. [23] XIANG Y, CASSADY C R, JIN T, et al. Joint productionand maintenance planning with machine deteriorationand random yield [J]. International Journalof Production Research, 2014, 52(6): 1644-1657. [24] JAFARI L, MAKIS V. Joint optimal lot sizing andpreventive maintenance policy for a production facilitysubject to condition monitoring [J]. InternationalJournal of Production Economics, 2015, 169: 156-168. [25] LIU X, WANG W, PENG R. An integrated production,inventory and preventive maintenance model fora multi-product production system [J]. Reliability Engineering& System Safety, 2015, 137: 76-86. [26] BONFILL A, ESPUNA A, PUIGJANER L. Proactiveapproach to address the uncertainty in short-termscheduling [J]. Computers & Chemical Engineering,2008, 32(8): 1689-1706. [27] WANG D J, LIU F, WANG Y Z, et al. A knowledgebasedevolutionary proactive scheduling approach inthe presence of machine breakdown and deteriorationeffect [J]. Knowledge-Based Systems, 2015, 90: 70-80. [28] BEYER H G, SENDHOFF B. Robust optimization: Acomprehensive survey [J]. Computer Methods in AppliedMechanics and Engineering, 2007, 196(33/34):3190-3218. [29] HAN X L, LU Z Q, XI L F. A proactive approach forsimultaneous berth and quay crane scheduling problemwith stochastic arrival and handling time [J]. EuropeanJournal of Operational Research, 2010, 207(3): 1327-1340. |
[1] | WU Jing, LIU Xuanyu, LI Xiang, QI Xiaoyan, LI Chengjun, ZHANG Zhong. Impact Mechanism Analysis of Carbon Price Uncertainty on Power System Dispatch [J]. Journal of Shanghai Jiao Tong University, 2025, 59(3): 354-364. |
[2] | LI Jianlin, ZHANG Zedong, LIANG Ce, ZENG Fei. Multi-Objective Robustness of Integrated Energy System Considering Source-Load Uncertainty [J]. Journal of Shanghai Jiao Tong University, 2025, 59(2): 175-185. |
[3] | TIAN Shuxin, HAN Xue, FU Yang, SU Xiangjing, LI Zhenkun. Two-Stage Robust Expansion Planning of Transmission Network Considering Uncertainty of Offshore Wind Power [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1400-1409. |
[4] | MI Yang, FU Qixin, ZHAO Haihui, MA Siyuan, WANG Yufei. Robust Optimal Scheduling of Micro Energy Grid Considering Multi-Interval Uncertainty Set of Source-Load and Integrated Demand Response [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1323-1333. |
[5] | YANG Sen, GUO Ning, ZHANG Shouming. Robust Optimal Scheduling of Agricultural Microgrid Combined with Irrigation System Under Uncertainty Conditions [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1432-1442. |
[6] | LIU Huahua, WANG Qing. Multi-Aircraft Target Assignment Method Based on Reinforcement Learning [J]. Air & Space Defense, 2024, 7(5): 65-72. |
[7] | ZHANG Weihua, WANG Donghui, ZHOU Zhitan, LI Yiqing. Research on Digital Prototype Technology of Solid Rocket Divert and Attitude Control Motor [J]. Air & Space Defense, 2024, 7(5): 18-27. |
[8] | HAN Mengying, MA Shugang, YANG Jianhua, LI Wei, MA Zhichao. Joint Policy Optimization of Quality Control, Condition-Based Maintenance and Spare Ordering for a Degradation System [J]. Journal of Shanghai Jiao Tong University, 2024, 58(3): 361-370. |
[9] | ZHANG Xianwen, YIN Gaowen, SHEN Feifan, HUANG Sheng, WEI Juan. Bidding Strategies for Energy Storage Participation in Electricity Market Considering Uncertainty of Wind Power and Carbon Trading [J]. Journal of Shanghai Jiao Tong University, 2024, 58(12): 1868-1880. |
[10] | WANG Xianglei, LIU Xiuquan, LIU Zhaowei, CHANG Yuanjiang, CHEN Guoming. Intelligent Control for Deepwater Drilling Riser Disconnection and Recoil Considering System Uncertainty [J]. Journal of Shanghai Jiao Tong University, 2024, 58(11): 1698-1706. |
[11] | FAN Hong, HE Jie, TIAN Shuxin. Robust Evaluation Method of Integrated Energy System Based on Variable Step Simulation and Improved Entropy Weight Method [J]. Journal of Shanghai Jiao Tong University, 2024, 58(1): 59-68. |
[12] | WEI Hui, CHEN Peng, ZHANG Ruihan, CHENG Zhengshun. Ultra-Short-Term Platform Motion Prediction Method of Large Floating Wind Turbines Based on LSTM Network [J]. Journal of Shanghai Jiao Tong University, 2023, 57(S1): 37-45. |
[13] | CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai. A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market [J]. Journal of Shanghai Jiao Tong University, 2023, 57(9): 1114-1125. |
[14] | WANG Jing, XING Haijun, WANG Huaxin, PENG Sijia. Optimal Scheduling of Integrated Energy System Considering Integration of Electric Vehicles and Load Aggregators [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 814-823. |
[15] | HU Bo, CHENG Xin, SHAO Changzheng, HUANG Wei, SUN Yue, XIE Kaigui. Optimal Dispatch of Integrated Energy System Based on Flexibility of Thermal Load [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 803-813. |
Viewed | ||||||||||||||||||||||||||||||||||||||||||||||||||
Full text 114
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||
Abstract 448
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||