Journal of Shanghai Jiao Tong University ›› 2023, Vol. 57 ›› Issue (11): 1522-1530.doi: 10.16183/j.cnki.jsjtu.2022.023
Special Issue: 《上海交通大学学报》2023年“机械与动力工程”专题
• Mechanical Engineering • Previous Articles
LI Xinlong1, RAN Yan1, ZHANG Genbao1,2,3(), HE Yan1,2
Received:
2022-01-24
Revised:
2022-02-28
Accepted:
2022-08-10
Online:
2023-11-28
Published:
2023-12-01
CLC Number:
LI Xinlong, RAN Yan, ZHANG Genbao, HE Yan. Sequential Preventive Maintenance Strategy Considering Difference of Maintenance Effect[J]. Journal of Shanghai Jiao Tong University, 2023, 57(11): 1522-1530.
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/10.16183/j.cnki.jsjtu.2022.023
Tab.1
Influence of minimal maintenance cost c m 1 of damage-type failures on optimal maintenance strategy
C*/(元·h-1) | N* | 维修间隔时间序列,x1,…,xk/h | 更新周期长度/h | |
---|---|---|---|---|
10 | 4.94 | 3 | 562.29, 354.81, 269.32 | 1 186.42 |
20 | 6.33 | 4 | 411.04, 268.80, 208.41, 170.22 | 1 058.46 |
30 | 7.54 | 5 | 332.41, 221.08, 173.26, 142.59, 118.94 | 988.28 |
40 | 8.64 | 5 | 283.04, 190.11, 149.95, 123.98, 103.79 | 850.87 |
50 | 9.67 | 5 | 248.68, 168.11, 133.17, 110.46, 92.69 | 753.10 |
60 | 10.65 | 6 | 223.14, 151.53, 120.41, 100.1, 84.145, 70.46 | 749.80 |
70 | 11.58 | 6 | 203.29, 138.52, 110.33, 91.88, 77.33, 64.82 | 686.17 |
80 | 12.45 | 6 | 187.34, 127.98, 102.12, 85.16, 71.75, 60.19 | 634.53 |
90 | 13.33 | 6 | 174.18, 119.24, 95.284, 79.54, 67.08, 56.31 | 591.64 |
100 | 14.16 | 6 | 163.12, 111.86, 89.49, 74.77, 63.10, 53.00 | 555.33 |
Tab.2
Influence of minimal maintenance cost c m 2 on optimal maintenance strategy for intrinsic fatigue-type failures
C*/(元·h-1) | N* | 维修间隔时间序列,x1,…,xk/h | 更新周期长度/h | |
---|---|---|---|---|
10 | 8.39 | 6 | 266.39, 184.66, 148.86, 125.11, 106.07, 89.40 | 920.48 |
20 | 8.65 | 6 | 262.60, 181.03, 145.36, 121.80, 103.01, 86.66 | 900.45 |
30 | 8.92 | 6 | 258.94, 177.57, 142.05, 118.69, 100.16, 84.12 | 881.54 |
40 | 9.17 | 6 | 255.40, 174.27, 138.93, 115.78, 97.51, 81.77 | 863.65 |
50 | 9.43 | 6 | 251.98, 171.12, 135.98, 113.04, 95.02, 79.56 | 846.70 |
60 | 9.67 | 5 | 248.68, 168.11, 133.17, 110.46, 92.69 | 753.10 |
70 | 9.91 | 5 | 245.48, 165.23, 130.51, 108.02, 90.49 | 739.72 |
80 | 10.14 | 5 | 242.38, 162.46, 127.97, 105.70, 88.42 | 726.94 |
90 | 10.37 | 5 | 239.38, 159.82, 125.56, 103.51, 86.46 | 714.73 |
100 | 10.60 | 5 | 236.47, 157.27, 123.25, 101.43, 84.61 | 703.04 |
Tab.3
Influence of preventive maintenance cost cp on optimal maintenance strategy
cp/元 | C*/(元·h-1) | N* | 维修间隔时间序列,x1,…,xk/h | 更新周期长度/h |
---|---|---|---|---|
100 | 8.76 | 7 | 248.68, 158.63, 120.17, 96.17, 78.38, 63.97, 51.80 | 817.83 |
200 | 9.67 | 5 | 248.68, 168.11, 133.17, 110.46, 92.69 | 753.10 |
300 | 10.33 | 4 | 248.68, 177.32, 145.57, 123.86 | 695.43 |
400 | 10.85 | 4 | 248.68, 186.30, 157.46, 136.58 | 729.02 |
500 | 11.25 | 3 | 248.68, 195.07, 168.92 | 612.66 |
600 | 11.60 | 2 | 248.68, 203.65 | 452.32 |
700 | 11.84 | 2 | 248.68, 212.05 | 460.72 |
800 | 12.06 | 1 | 248.68 | 248.68 |
900 | 12.06 | 1 | 248.68 | 248.68 |
1000 | 12.06 | 1 | 248.68 | 248.68 |
Tab.4
Influence of replacement cost cr on optimal maintenance strategy
cr/元 | C*/(元·h-1) | N* | 维修间隔时间序列,x1,…,xk/h | 更新周期长度/h |
---|---|---|---|---|
200 | 7.05 | 1 | 85.05 | 85.05 |
300 | 7.87 | 2 | 111.44, 93.781 | 205.22 |
400 | 8.29 | 3 | 135.00, 105.90, 91.70 | 332.60 |
500 | 8.61 | 4 | 156.66, 117.36, 99.19, 86.04 | 459.25 |
600 | 8.86 | 4 | 176.91, 128.29, 106.41, 91.18 | 502.78 |
700 | 9.10 | 5 | 196.05, 138.77, 113.39, 96.17, 82.07 | 626.47 |
800 | 9.30 | 5 | 214.31, 148.87, 120.17, 101.05, 85.68 | 670.07 |
900 | 9.49 | 5 | 231.81, 158.63, 126.75, 105.81, 89.22 | 712.22 |
1000 | 9.67 | 5 | 248.68, 168.11, 133.17, 110.46, 92.69 | 753.10 |
Tab.5
Influence of failure scale factor on optimal maintenance strategy
e | f | C*/(元·h-1) | N* | 维修间隔时间序列,x1,…,xk/h | 更新周期长度/h |
---|---|---|---|---|---|
0.1 | 0.9 | 13.29 | 1 | 225.66 | 225.66 |
0.2 | 0.8 | 13.14 | 1 | 228.25 | 228.25 |
0.3 | 0.7 | 12.99 | 1 | 230.91 | 230.91 |
0.4 | 0.6 | 12.69 | 2 | 233.65, 139.68 | 373.32 |
0.5 | 0.5 | 11.27 | 2 | 236.47, 144.39 | 380.86 |
0.6 | 0.4 | 11.79 | 3 | 239.38, 149.52, 112.84 | 501.73 |
0.7 | 0.3 | 11.20 | 3 | 242.38, 155.13, 118.72 | 516.22 |
0.8 | 0.2 | 10.8 | 4 | 245.48, 161.29, 125.43, 102.65 | 634.85 |
0.9 | 0.1 | 9.67 | 5 | 248.68, 168.11, 133.17, 110.46, 92.69 | 753.10 |
1.0 | 0 | 8.70 | 7 | 251.98, 175.69, 142.23, 119.93, 101.94, 86.104, 71.72 | 949.61 |
Tab.6
Influence of adjustment factor ν change on optimal maintenance strategy
ν | C*/(元·h-1) | N* | 维修间隔时间序列,x1,…,xk/h | 更新周期长度/h |
---|---|---|---|---|
0.02 | 9.93 | 4 | 248.68, 164.87, 125.12, 96.99 | 635.65 |
0.04 | 10.27 | 4 | 248.68, 158.5, 110.1, 74.06 | 591.33 |
0.06 | 10.48 | 3 | 248.68, 152.27, 96.51 | 497.46 |
0.08 | 10.66 | 3 | 248.68, 146.19, 84.29 | 479.16 |
0.1 | 10.83 | 3 | 248.68, 140.27, 73.36 | 462.31 |
0.3 | 11.60 | 2 | 248.68, 89.64 | 338.32 |
0.5 | 12.06 | 1 | 248.68 | 248.68 |
0.7 | 12.06 | 1 | 248.68 | 248.68 |
0.7 | 12.06 | 1 | 248.68 | 248.68 |
[1] | 杜煜, 李雨青, 张秀芳, 等. 考虑广义时间价值的串行退化生产系统维护更新策略[J]. 上海交通大学学报, 2020, 54(5): 465-472. |
DU Yu, LI Yuqing, ZHANG Xiufang, et al. Preventive maintenance and replacement policy for series deteriorating production system considering generalized time value[J]. Journal of Shanghai Jiao Tong University, 2020, 54(5): 465-472. | |
[2] | 郝虹斐, 郭伟, 桂林, 等. 非完美维修情境下的预防性维修多目标决策模型[J]. 上海交通大学学报, 2018, 52(5): 518-524. |
HAO Hongfei, GUO Wei, GUI Lin, et al. A multi-objective preventive maintenance decision-making model for imperfect repair process[J]. Journal of Shanghai Jiao Tong University, 2018, 52(5): 518-524. | |
[3] |
WANG H Z. A survey of maintenance policies of deteriorating systems[J]. European Journal of Operational Research, 2002, 139(3): 469-489.
doi: 10.1016/S0377-2217(01)00197-7 URL |
[4] |
NAKAGAWA T. Periodic and sequential preventive maintenance policies[J]. Journal of Applied Probability, 1986, 23(2): 536-542.
doi: 10.2307/3214197 URL |
[5] |
ZHU X Y, BEI X Q, CHATWATTANASIRI N, et al. Optimal system design and sequential preventive maintenance under uncertain aperiodic-changing stresses[J]. IEEE Transactions on Reliability, 2018, 67(3): 907-919.
doi: 10.1109/TR.2018.2798298 URL |
[6] |
ZHOU Y, KOU G, XIAO H, et al. Sequential imperfect preventive maintenance model with failure intensity reduction with an application to urban buses[J]. Reliability Engineering & System Safety, 2020, 198: 106871.
doi: 10.1016/j.ress.2020.106871 URL |
[7] |
DUAN C Q, DENG C, WANG B R. Multi-phase sequential preventive maintenance scheduling for deteriorating repairable systems[J]. Journal of Intelligent Manufacturing, 2019, 30(4): 1779-1793.
doi: 10.1007/s10845-017-1353-z |
[8] | 苏春, 胡照勇, 郑玉巧. 基于可用度约束的风力机单部件顺序维修优化[J]. 东南大学学报(自然科学版), 2019, 49(1): 110-115. |
SU Chun, HU Zhaoyong, ZHENG Yuqiao. Single part sequential maintenance optimization for wind turbines based on availability constraint[J]. Journal of Southeast University (Natural Science Edition), 2019, 49(1): 110-115. | |
[9] |
SUN Q Z, YE Z S, PENG W W. Scheduling preventive maintenance considering the saturation effect[J]. IEEE Transactions on Reliability, 2019, 68(2): 741-752.
doi: 10.1109/TR.24 URL |
[10] | 张根保, 张定飞, 冉琰, 等. 基于Gamma和混合Copula的元动作单元性能可靠性分析[J]. 湖南大学学报(自然科学版), 2021, 48(4): 113-125. |
ZHANG Genbao, ZHANG Dingfei, RAN Yan, et al. Performance reliability analysis of meta-action unit based on gamma process and hybrid copula function[J]. Journal of Hunan University (Natural Sciences), 2021, 48(4): 113-125. | |
[11] |
LI Y L, ZHANG X G, RAN Y, et al. Reliability and modal analysis of key meta-action unit for CNC machine tool[J]. IEEE Access, 2019, 7: 23640-23655.
doi: 10.1109/ACCESS.2019.2899623 URL |
[12] |
YU H, ZHANG G B, RAN Y, et al. A reliability allocation method for mechanical product based on meta-action[J]. IEEE Transactions on Reliability, 2020, 69(1): 373-381.
doi: 10.1109/TR.24 URL |
[13] |
张根保, 冉琰, 庾辉, 等. 机械产品可靠性研究的新进展: 元动作可靠性理论[J]. 制造技术与机床, 2022(1): 53-59.
doi: 10.19287/j.cnki.1005-2402.2022.01.010 |
ZHANG Genbao, RAN Yan, YU Hui, et al. New progress in reliability research of mechanical products-reliability theory of meta-action[J]. Manufacturing Technology & Machine Tool, 2022(1): 53-59. | |
[14] | ZHANG W, ZHANG G B, RAN Y, et al. The full-state reliability model and evaluation technology of mechatronic product based on meta-action unit[J]. Advances in Mechanical Engineering, 2018, 10(5): 1-11. |
[15] |
YU H, ZHANG G B, RAN Y. A more reasonable definition of failure mode for mechanical systems using meta-action[J]. IEEE Access, 2018, 7: 4898-4904.
doi: 10.1109/ACCESS.2018.2888542 URL |
[16] | ZHANG X G, ZHANG G B, LI Y L, et al. A novel fault diagnosis approach of a mechanical system based on meta-action unit[J]. Advances in Mechanical Engineering, 2019, 11(2): 1-12. |
[17] |
WANG G J, ZHANG Y L, YAM R C M. Preventive maintenance models based on the generalized geometric process[J]. IEEE Transactions on Reliability, 2017, 66(4): 1380-1388.
doi: 10.1109/TR.2017.2738020 URL |
[18] |
WANG G J, YAM R C M. Generalized geometric process and its application in maintenance problems[J]. Applied Mathematical Modelling, 2017, 49: 554-567.
doi: 10.1016/j.apm.2017.05.024 URL |
[1] | LIU Jiahe, HU Pengwei, CHENG Hailong. Research on Condition-Based Maintenance of Complex System Based on Performance Degradation [J]. Air & Space Defense, 2023, 6(1): 56-62. |
[2] | YE Hongqing, SU Huade, ZHENG Meimei, XIA Tangbin. Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1359-1367. |
[3] | ZHONG Xiaobo, YU Long, LÜ Shun, MU Wentong, ZHU Yanfeng. Construction and Application of Functional Equipment Group in Qinshan Nuclear Power Plant [J]. Journal of Shanghai Jiao Tong University, 2021, 55(S2): 1-6. |
[4] | TIAN Xueyan, WANG Mengya, PAN Ershun. Imperfect Maintenance Policy for a Two-Machine One-Buffer System Based on Markov Decision Process [J]. Journal of Shanghai Jiao Tong University, 2021, 55(4): 480-488. |
[5] | WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints [J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110. |
[6] | DU Yu,LI Yuqing,ZHANG Xiufang,PAN Ershun. Preventive Maintenance and Replacement Policy for Series Deteriorating Production System Considering Generalized Time Value [J]. Journal of Shanghai Jiaotong University, 2020, 54(5): 465-472. |
[7] | ZHU Mixin, GE Yaxiong, ZHOU Xiaojun. Preventive Maintenance Strategy for Multi-Stage Flexible Manufacturing System with Dynamic Production Planning [J]. Journal of Shanghai Jiaotong University, 2020, 54(11): 1124-1133. |
[8] | SU Chun,ZHAO Jiabin. Optimal Design for Flexible Basic Warranty Policies Based on Usage Rate of Products [J]. Journal of Shanghai Jiaotong University, 2020, 54(11): 1182-1188. |
[9] | YU Mengqi,SHI Kailong,ZHOU Xiaojun. Opportunistic Maintenance Strategy for Multi-Unit Serial Systems Based on Dual Time Window [J]. Journal of Shanghai Jiaotong University, 2020, 54(1): 69-75. |
[10] | GUO Wenyu,ZHANG Xiufang,XIU Yujiao,XIA Tangbin,PAN Ershun. Integrating Strategy of Preventive Maintenance and Buffer Allocation Considering Dynamic Degradations for Manufacturing Systems [J]. Journal of Shanghai Jiaotong University, 2019, 53(9): 1107-1114. |
[11] | LIU Gehui (刘葛辉), LONG Xiangyu (龙翔宇), TONG Shuo (仝硕), ZHANG Rui (张瑞), CHEN Shaokuan* (陈绍宽) . Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability [J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 490-495. |
[12] | WANG Shaohua *(王少华), ZHANG Shixin (张仕新), XU Longyang (徐隆洋), XING Ruxin (邢汝鑫). Optimal Research on Equipment Maintenance Unequal Time-Interval Based on Simulation [J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 485-489. |
[13] | Lü Yi (吕燚), ZHANG Yun (章云). Reliability Modeling and Maintenance Policy Optimization for Deteriorating System Under Random Shock [J]. Journal of Shanghai Jiao Tong University (Science), 2018, 23(6): 791-797. |
[14] | ZHAO Fei (赵斐), LIU Xuejuan (刘学娟), PENG Rui (彭锐). Inspection-Based Policy Considering Human Errors for Three-Stage Delay Time Degradation Systems [J]. Journal of Shanghai Jiao Tong University (Science), 2018, 23(5): 702-706. |
[15] | HAO Hongfei1,GUO Wei1,GUI Lin2,WANG Lei1. A Multi-Objective Preventive Maintenance Decision-Making Model for Imperfect Repair Process [J]. Journal of Shanghai Jiaotong University, 2018, 52(5): 518-524. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||