[1]MASTOR A A. An experimental investigation and comparative evaluation of production line balancing techniques [J]. Management Science, 1970, 16(11): 728-746.
[2]KURTULUS I S, DAVIS E W. Multiproject scheduling: Categorization of heuristic rules performance [J]. Management Science, 1982, 28(2): 161-172.
[3]KURTULUS I S, NARULA S C. Multiproject scheduling: Analysis of project performance [J]. IIE Transactions, 1985, 17 (1): 58-66.
[4]BLAZEWICZ J, LENSTRA J K, RINNOOY K A H G. Scheduling subject to resource constraints: Classification and complexity [J]. Discrete Applied Mathematics, 1983, 5(1):11-24.
[5]BROWNING T R, YASSINE A A. Resourceconstrained multiproject scheduling: Priority rule performance revisited [J]. International Journal of Production Economics, 2010, 126(2): 212-228.
[6]LOVA A, TORMOS P. Analysis of scheduling schemes and heuristic rules performance in resourceconstrained multiproject scheduling[J]. Annals of Operation Research, 2001, 102(1): 263-286.
[7]GONCALVES J F, MENDES J J M, RESENDE M G C. A genetic algorithm for the resource constrained multiproject scheduling problem [J]. European Journal of Operational Research, 2008, 189 (3): 1171-1190.
[8]DALFARD V M, RANJBAR V. Multiprojects scheduling with resource constraints & priority rules by the use of simulated annealing algorithm [J]. Technical Gazette, 2012, 19(3): 493-499.
[9]SINGH A. Resource constrained multiproject scheduling with priority rules & analytic hierarchy process [J]. Procedia Engineering, 2014, 69: 725-734.
[10]应瑛,寿涌毅. 基于组合拍卖方法的资源受限多项目调度[J]. 计算机集成制造系统, 2009, 15(11): 2160-2165.
YING Ying, SHOU Yongyi. Resourceconstrained multiproject scheduling based on combinatorial auction method [J]. Computer Integrated Manufacturing Systems, 2009, 15(11): 2160-2165.
[11]王军强, 张松飞, 陈剑, 等. 一种求解资源受限多项目调度的分解算法[J]. 计算机集成制造系统, 2013, 19(1): 83-96.
WANG Junqiang, ZHANG Songfei, CHEN Jian, et al. Decomposition algorithm for resourceconstrained multiproject scheduling problem [J]. Computer Integrated Manufacturing Systems, 2013, 19(1): 83-96.
[12]SCHIRMER A. Casebased reasoning and improved adaptive search for project scheduling [J]. Naval Research Logistics, 2000, 47(3): 201-221. |