Journal of Shanghai Jiaotong University ›› 2013, Vol. 47 ›› Issue (02): 230-235.
• Automation Technique, Computer Technology • Previous Articles Next Articles
LI Cheng, JIANG Zhi-Bin, LI You, LI Na, GENG Na, YAO Shi-Qing, JIA Wen-You
Received:
2012-01-21
Online:
2013-02-28
Published:
2013-02-28
CLC Number:
LI Cheng, JIANG Zhi-Bin, LI You, LI Na, GENG Na, YAO Shi-Qing, JIA Wen-You. Rule-Based Scheduling of Batch Processing Machine Applied to Semiconductor Wafer Fabrication System[J]. Journal of Shanghai Jiaotong University, 2013, 47(02): 230-235.
[1]Hung Y F, Wang Q Z. A new formulation technique for alternative material planning: An approach for semiconductor bin allocation planning[J]. Comput Ind Eng, 1997, 32(2): 281297.[2]张怀,江志斌,郭乘涛.面向瓶颈的半导体晶圆制造系统派工策略与参数优化[J] .上海交通大学学报,2007,41 (8):12521257.ZHANG Huai, JIANG Zhibin,GUO Chengtao. The bottleneckoriented dispatching strategy and parameter optimization in semiconductor wafer fabrication system[J]. Journal of Shanghai Jiaotong University, 2007, 41(8): 12521257.[3]Potts C N,Kovalyov M Y. Scheduling with batching:A review[J]. Eur J Oper Res〖WTBZ〗, 2000, 120:228249.[4]Zhou M C, Jeng M D. Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A petri net approach[J]. IEEE Transactions on Semiconductor Manufacturing, 1998, 11(3):333357.[5]Mathirajan M, Sivakumar A I. A literature review, classification and simple metaanalysis on scheduling of batch processors in semiconductor[J]. Int J Adv Manuf Technol, 2006,47(29):9901001.[6]Kumar P R. Reentrant lines[J]. Queuing Systems, 1993, 13(1):87110.[7]Liu L L, Ng C T, Cheng T C E. Scheduling jobs with agreeable processing times and due dates on a single processing machine[J].Theoretical Computer Science, 2007, 18(374): 159169.[8]Van Der Zee D J. Lookahead strategies for controlling batch operations in industry: An overview[C]∥Proc of the 2003 Winter Simulation Conf Piscataway. NJ, USA: [s.n.], 2003: 14801487.[9]Roger G C, Willie W W. Dynamic batching heuristic for simultaneous processing[J]. IEEE Transactions on Semiconductor Manufacturing, 1991,4(2):7782.[10]张怀,江志斌, 郭乘涛,等. 基于EOPN的晶圆制造系统实时调度仿真平台[J].上海交通大学学报, 2006 , 40 (11):18571863.ZHANG Huai, JIANG Zhibin, GUO Chengtao, et al. An EOPNbased realtime scheduling simulation platform of wafer fabrication[J]. Journal of Shanghai Jiaotong University, 2006, 40(11):18571863.[11]郭乘涛,江志斌,张怀. 基于问题分解的蚁群算法在半导体晶圆制造调度中的应用[J]. 上海交通大学学报, 2009,43(11):17981802.GUO Chengtao, JIANG Zhibin, ZHANG Huai. Decomposition based ant colony optimization algorithm applied to semiconductor wafer fabrication system[J]. Journal of Shanghai Jiaotong University, 2009, 43(11): 17981802. |
[1] | LIU Yahui, SHEN Xingwang, GU Xinghai, PENG Tao, BAO Jinsong, ZHANG Dan. A Dual-System Reinforcement Learning Method for Flexible Job Shop Dynamic Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(9): 1262-1275. |
[2] | LI Dechang, YANG Hualong, DUAN Jingru. A Joint Optimization of Vessel Scheduling and Refueling Strategy for Container Liner Shipping with Cooperative Agreements [J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 953-964. |
[3] | LI Linyan, HAN Shuang, QIAO Yanhui, LI Li, LIU Yongqian, YAN Jie, LIU Haidong. A Wind-Solar-Electric Vehicles Coordination Scheduling Method for High Proportion New Energy Grid-Connected Scenarios [J]. Journal of Shanghai Jiao Tong University, 2022, 56(5): 554-563. |
[4] | TANG Hongtao, WANG Dannan, SHAO Yiping, ZHAO Wenbin, JIANG Weiguang, CHEN Qingfeng. A Modified Migrating Birds Optimization for Multi-Objective Lot Streaming Hybrid Flowshop Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 201-213. |
[5] | WANG Zixiang, WU Zerui, LIU Ran. Weekly Physician Scheduling for Emergency Departments with Time-Varying Demands of Patients with Revisits [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 242-252. |
[6] | LU Qiuyu, YU Zhen, YANG Yinguo, LI Li. Two-Stage Optimal Schedule of Offshore Wind-Power-Integrated Multi-Microgrid Considering Uncertain Power of Sources and Loads [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1308-1316. |
[7] | WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints [J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110. |
[8] | JIANG Xiaokang, ZHANG Peng, LÜ Youlong, ZHAO Xinming, ZHANG Jie. Hybrid Ant Colony Algorithm for Batch Scheduling in Semiconductor Furnace Operation [J]. Journal of Shanghai Jiaotong University, 2020, 54(8): 792-804. |
[9] | ZHU Hongwei, LU Zhiqiang. Modeling and Optimization of Resource Constrained Project Scheduling Problem Considering Employee-Timetabling [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 624-635. |
[10] | MENG Lingtong, JIANG Zuhua, TAO Ningrong, LIU Jianfeng, ZHENG Hong. Multi-Stockyard Scheduling Considering Technological Process and Combined Assembly Block [J]. Journal of Shanghai Jiao Tong University, 2020, 54(4): 331-343. |
[11] | MA Changpu,ZHOU Binghai. Scheduling of Multi-Load Rail Guided Vehicles in AS/RS with Collision Avoidance Constrains [J]. Journal of Shanghai Jiaotong University, 2020, 54(2): 126-134. |
[12] | FANG Jia, LU Zhiqiang. Modeling and Optimization of Robust Scheduling Template Considering Equipment Failure [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1278-1290. |
[13] | ZHAO Rui, GU Xingsheng. A Discrete Sine Optimization Algorithm for No-Idle Flow-Shop Scheduling Problem [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1291-1299. |
[14] | CUI Weiwei (崔维伟). Approximate Approach to Deal with the Uncertainty in Integrated Production Scheduling and Maintenance Planning [J]. Journal of Shanghai Jiao Tong University (Science), 2020, 25(1): 106-117. |
[15] | ZHOU Binghai,LIU Wenlong. Multi-Objective Hybrid Flow-Shop Scheduling Problem Considering Energy Consumption and On-Time Delivery [J]. Journal of Shanghai Jiaotong University, 2019, 53(7): 773-779. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||