Integrating Optimization Method for Continuous Berth and Quay Crane Scheduling in Container Terminals
GUI Xiao-Ya-1, LU Zhi-Qiang-2, HAN Xiao-Le-1
(1. School of Mechanical Engineering, Shanghai Jiaotong University, Shanghai 200240, China;2. School of Mechanical Engineering, Tongji University, Shanghai 201804, China)
GUI Xiao-Ya-1, LU Zhi-Qiang-2, HAN Xiao-Le-1. Integrating Optimization Method for Continuous Berth and Quay Crane Scheduling in Container Terminals[J]. Journal of Shanghai Jiaotong University, 2013, 47(02): 226-229.
[1]Meisel F, Bierwirth C. Heuristics for the integration of crane productivity in the berth allocation problem [J]. Transportation Research Part E: Transportation Review, 2009, 45 (1): 196209.[2]Imai A, Chen H C, Nishimura E, et al. The simultaneous berth and quay crane allocation problem [J]. Transportation Research Part E, 2008, 44 (5): 900920.[3]Liang C, Huang Y, Yang Y. A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning [J]. Computers and Industrial Engineering, 2008, 56 (3): 10211028.[4]蔡芸,孙国正.同时求解泊位分配及岸桥调度问题的仿真优化方法[C]//北京交通大学.全国博士生学术论坛论文集.北京:人民交通出版社, 2005:542546.[5]王万良,吴启迪.生产调度智能算法及其应用[M].北京: 科学出版社, 2007.[6]Nishimura E, Imai A, Papadimitriou S. Berth allocation planning in the public berth system by genetic algorithms [J]. European Journal of Operation Research, 2001, 131(2): 282292.