Journal of Shanghai Jiaotong University ›› 2020, Vol. 54 ›› Issue (6): 624-635.doi: 10.16183/j.cnki.jsjtu.2018.134
Previous Articles Next Articles
ZHU Hongwei,LU Zhiqiang
Online:
2020-06-28
Published:
2020-07-03
CLC Number:
ZHU Hongwei, LU Zhiqiang. Modeling and Optimization of Resource Constrained Project Scheduling Problem Considering Employee-Timetabling[J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 624-635.
[1]BLAZEWICZ J, LENSTRA J, KAN A. Scheduling subject to resource constraints: Classification and complexity[J]. Discrete Applied Mathematics, 1983, 5(1): 11-24. [2]BRUCKER P, KNUST S, SCHOO A, et al. A branch and bound algorithm for the resource-constrained project scheduling problem[J]. Mathematical Methods of Operations Research, 2000, 52(3): 413-439. [3]REYCK B, HERROELEN W. A branch-and-bound procedure for the resource-constrained project sche-duling problem with generalized precedence relations[J]. European Journal of Operational Research, 1998, 111(1): 152-174. [4]ZAMANI R. A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2013, 229(2): 552-559. [5]CHEN R. Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem[J]. Expert Systems with Applications, 2011, 38(6): 7102-7111. [6]何杰光, 陈新度, 陈新, 等. 求解资源受限项目调度的双种群准粒子群算法[J]. 计算机集成制造系统, 2015, 21(9): 2446-2457. HE Jieguang, CHEN Xindu, CHEN Xin, et al. Double-population quasi particle swarm optimization for solving resource-constrained scheduling problem[J]. Computer Integrated Manufacturing Systems, 2015, 21(9): 2446-2457. [7]WANG L, FANG C. A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem[J]. Expert Systems with Applications, 2012, 39(3): 2451-2460. [8]HE J, CHEN X D, CHEN X. A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling[J]. Compu-ters and Operations Research, 2016, 71(1): 71-81. [9]BERGH J, BELIN J, BRUECKER P, et al. Personnel scheduling: A literature review[J]. European Journal of Operational Research, 2013, 226(3): 367-385. [10]HANAFI R, KOZAN E. A hybrid constructive heuristic and simulated annealing for railway crew sche-duling[J]. Computers and Industrial Engineering, 2014, 70(1): 11-19. [11]AL-YAKOOB S, SHERALI H. Mixed-integer programming models for an employee scheduling problem with multiple shifts and work locations[J]. Annals of Operations Research, 2007, 155(1): 119-142. [12]BILGIN B, CAUSMAECKER P, ROSSIE B, et al. Local search neighbourhoods for dealing with a novel nurse rostering model[J]. Annals of Operations Research, 2012, 194(1): 33-57. [13]MATTAA R, PETERS E. Developing work sche-dules for an inter-city transit system with multiple driver types and fleet types[J]. European Journal of Operational Research, 2009, 192(3): 852-865. [14]DREZET L, BILLAUT J. A project scheduling problem with labour constraints and time-dependent activities requirements[J]. International Journal of Production Economics, 2008, 112(1): 217-225. [15]ARTIGUES C, GENDREAU M, ROUSSEAU L, et al. Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound[J]. Computers and Operations Research, 2009, 36(8): 2330-2340. [16]GUYON O, LEMAIRE P, PINSON E, et al. Cut generation for an integrated employee timetabling and production scheduling problem[J]. European Journal of Operational Research, 2010, 201(2): 557-567. [17]AHMADI-JAVID A, HOOSHANGI-TABRIZI P. Integrating employee timetabling with scheduling of machines and transporters in a job shop environment: A mathematical formulation and an anarchic society optimization algorithm[J]. Computers and Operations Research, 2017, 84(1): 73-91. [18]潘全科, 高亮, 李新宇. 流水车间调度及其优化算法[M]. 武汉: 华中科技大学出版社, 2013. PAN Quanke, GAO Liang, LI Xinyu. Flow shop scheduling and optimization algorithm[M]. Wuhan: Huazhong University of Science and Technology Press, 2013. |
[1] | LU Zhiqiang,SHI Ting. Modeling and Optimization of Resource Investment Problem with Resource Vacations [J]. Journal of Shanghai Jiaotong University, 2019, 53(5): 600-609. |
[2] | ZONG Baoshi,LU Zhiqiang. Integrated Optimization of Project Splitting and Resource Investment Project Scheduling [J]. Journal of Shanghai Jiaotong University, 2018, 52(7): 793-800. |
[3] |
ZHOU Binghai,LI Ming.
Scheduling Method of Manufacturing Cells with Robot Restricted Processing [J]. Journal of Shanghai Jiaotong University, 2017, 51(10): 1214-1219. |
[4] |
LUO Huayi,WANG Jingcheng,YANG Liwen,LI Xiaocheng.
Research and Application of Urban Water Demand Forecasting Based on Time Difference Coefficient [J]. Journal of Shanghai Jiaotong University, 2017, 51(10): 1260-1267. |
[5] | LU Zhiqiang,YANG Chao. Modeling of Resource Constrained MultiProject Scheduling Problem Based on Project Splitting [J]. Journal of Shanghai Jiaotong University, 2017, 51(2): 193-. |
[6] | LIU Xinyi,LU Zhiqiang. Modeling of and Algorithm for Resource Constrained Project Scheduling Problem with Resource Allocation Dependent Processing Time [J]. Journal of Shanghai Jiaotong University, 2017, 51(1): 82-. |
[7] | QI Faqun,ZHOU Binghai. Preventive Maintenance Policy of Cluster Tools Based on Markov Process [J]. Journal of Shanghai Jiaotong University, 2014, 48(10): 1461-1467. |
[8] | CAO Weihua1,2,CAI Yiqing2,YUAN Yan1,2,WU Min1,2. Exergy Efficiency Calculation and Parameter Optimization of the Sintering Waste Heat Recovery System [J]. Journal of Shanghai Jiaotong University, 2014, 48(07): 1046-1052. |
[9] | REN Shu-1, JI Xiao-Jun-1, DONG Hao-Ran-1, CAI Ping-1, HAN Tao-1, CHEN Le-Sheng-2, ZHOU Xian-Mei-2. Optimal Matching Algorithm for Heat Measuring Instrument with Platinum Resistance [J]. Journal of Shanghai Jiaotong University, 2013, 47(04): 663-666. |
[10] | ZHOU Su-1a, 1b , JI Guang-Ji-1a, LIU Ji-Chen-1a, HU Zhe-2. Research on the Oxygen Excess Ratio Fluctuation with Current Regulation for a PEM Fuel Cell Engine [J]. Journal of Shanghai Jiaotong University, 2012, 46(11): 1712-1717. |
[11] |
HAN Yi-1a, 1b , 2 , CAI Jian-Hu-1a, 1b , LI Yan-Lai-3, YE Xu-Hong-1a, LIN Hua-Zhen-1a, WANG Wei-1a.
Shuffled Frog Leaping Algorithm for Multisupplier Selection Problem with Multiple Products and Discounts [J]. Journal of Shanghai Jiaotong University, 2012, 46(04): 567-572. |
[12] | HUANG Weijie,ZHANG Mi,CUI Cong,LI Liang. Applicability of Updated International I&C Standards and Norms for Nuclear Power Plant [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 104-108. |
Viewed | ||||||||||||||||||||||||||||||||||||||||||||||||||
Full text 528
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||
Abstract 1299
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||