Journal of Shanghai Jiaotong University ›› 2016, Vol. 50 ›› Issue (05): 647-653.
ZHANG Jie1,PAN Cong1,SUN Yinbin1,WU Lihui2,QIN Wei1
Received:
2015-07-22
Online:
2016-05-28
Published:
2016-05-28
CLC Number:
ZHANG Jie1,PAN Cong1,SUN Yinbin1,WU Lihui2,QIN Wei1. Modified Hungarian Algorithm and Fuzzy Logic ControlBased Scheduling Method for Interbay Material Handling System [J]. Journal of Shanghai Jiaotong University, 2016, 50(05): 647-653.
[1]GOVIND N, ROEDER T M, SCHRUBEN L W. A simulationbased closed queueing network approximation of semiconductor automated material handling systems[J]. IEEE Transactions on Semiconductor Manufacturing, 2011, 24(1):513. [2]AGRAWAL G K, HERAGU S S. A survey of automated material handling systems in 300mm semiconductor Fabs[J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19(1): 112120. [3]KIM B I, OH S, SHIN J, et al. Effectiveness of vehicle reassignment in a largescale overhead hoist transport system[J]. International Journal of Production Research, 2007, 45(4): 789802. [4]KIM B I, SHIN J, JEONG S, et al. Effective overhead hoist transport dispatching based on the Hungarian algorithm for a large semiconductor Fab[J]. International Journal of Production Research, 2009, 47(10): 28232834. [5]LIN J T, WANG F K, YEN P Y. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer Fab[J]. International Journal of Production Research, 2001, 39(6): 12211238. [6]LIAO D Y, WANG C N. Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry[J]. The International Journal of Advanced Manufacturing Technology, 2006, 29(9): 890896. [7]LIN J T, WANG F K, CHANG Y M. A hybrid push/pulldispatching rule for a photobay in a 300 mm wafer Fab[J]. Robotics and ComputerIntegrated Manufacturing, 2006, 22(1): 4755. [8]YANG J W, CHENG H C, CHIANG T C, et al. Multiobjective lot scheduling and dynamic OHT routing in a 300mm wafer fab[C]∥ The 2008 IEEE International Conference on Systems, Man, and Cybernetics. Singapore: IEEE, 2008: 16081613. [9]KUO C H, HUANG C S. Dispatching of overhead hoist vehicles in a fab intrabay using a multimissionoriented controller[J]. The Internatinal Journal of Advandced Manufacturing Technology, 2006,27(7): 824832. [10]董义军, 张功, 张洁. 单无人搬运车/单缓冲区约束的柔性生产系统调度研究[J]. 上海交通大学学报, 2010,44(4): 528534. DONG Yijun, ZHANG Gong, ZHANG Jie. Scheduling with single AGV and single buffer area for flexible production system[J]. Journal of Shanghai Jiao Tong University, 2010,44(4): 528534. [11]郑雯, 周炳海. 基于事件驱动的高架提升传输小车派工与路径调度算法[J]. 计算机集成制造系统, 2013, 19(1): 7582. ZHENG Wen, ZHOU Binghai. OHT dispatching and routing scheduling algorithm based on eventsdriven[J]. Computer Integrated Manufacturing Systems, 2013, 19(1): 7582. [12]周炳海, 周琪, 郑雯. 半导体制造AMHS中悬挂式小车多因素调度方法[J]. 北京理工大学学报, 2014, 34(6): 603606. ZHOU Binghai, ZHOU Qi, ZHENG Wen. Multifactor OHT scheduling method of AMHS for semiconductor fabrication[J]. Transactions of Beijing Institute of Technology, 2014, 34(6): 603606. [13]MUNKRES J. Algorithms for the assignment and transportation problems[J]. Journal of the Society for Industrial and Applied Mathematics, 1957, 5(1): 3238. [14]EGBELU P J, TANCHOCO M A. Characterization of automatic guided vehicle dispatching rules[J]. International Journal of Production Research, 1984, 22(3):359374. [15]WANG K J, LIN J T, WEIGERT G. Agentbased interbay system control for a singleloop semi conductor manufacturing fab[J]. Production Planning & Control, 2007, 18(2): 7490. [16]BOZER Y A, HSIEH Y J. Throughput performance analysis and machine layout for discretespace closedloop conveyors[J]. IIE Transactions, 2007, 37(1): 7789. [17]MONTGOMERY D C. Design and analysis of experiments[M]. New York: John Wiley & Sons, Inc, 2013. |
[1] | LIU Yahui, SHEN Xingwang, GU Xinghai, PENG Tao, BAO Jinsong, ZHANG Dan. A Dual-System Reinforcement Learning Method for Flexible Job Shop Dynamic Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(9): 1262-1275. |
[2] | LI Dechang, YANG Hualong, DUAN Jingru. A Joint Optimization of Vessel Scheduling and Refueling Strategy for Container Liner Shipping with Cooperative Agreements [J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 953-964. |
[3] | LI Linyan, HAN Shuang, QIAO Yanhui, LI Li, LIU Yongqian, YAN Jie, LIU Haidong. A Wind-Solar-Electric Vehicles Coordination Scheduling Method for High Proportion New Energy Grid-Connected Scenarios [J]. Journal of Shanghai Jiao Tong University, 2022, 56(5): 554-563. |
[4] | TANG Hongtao, WANG Dannan, SHAO Yiping, ZHAO Wenbin, JIANG Weiguang, CHEN Qingfeng. A Modified Migrating Birds Optimization for Multi-Objective Lot Streaming Hybrid Flowshop Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 201-213. |
[5] | WANG Zixiang, WU Zerui, LIU Ran. Weekly Physician Scheduling for Emergency Departments with Time-Varying Demands of Patients with Revisits [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 242-252. |
[6] | LU Qiuyu, YU Zhen, YANG Yinguo, LI Li. Two-Stage Optimal Schedule of Offshore Wind-Power-Integrated Multi-Microgrid Considering Uncertain Power of Sources and Loads [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1308-1316. |
[7] | WANG Ruichang, CHEN Zhihua, MING Xinguo. Energy Management of Parallel Ship Power System Based on Improved Fuzzy Logic Control [J]. Journal of Shanghai Jiao Tong University, 2021, 55(10): 1188-1196. |
[8] | WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints [J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110. |
[9] | JIANG Xiaokang, ZHANG Peng, LÜ Youlong, ZHAO Xinming, ZHANG Jie. Hybrid Ant Colony Algorithm for Batch Scheduling in Semiconductor Furnace Operation [J]. Journal of Shanghai Jiaotong University, 2020, 54(8): 792-804. |
[10] | ZHU Hongwei, LU Zhiqiang. Modeling and Optimization of Resource Constrained Project Scheduling Problem Considering Employee-Timetabling [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 624-635. |
[11] | MENG Lingtong, JIANG Zuhua, TAO Ningrong, LIU Jianfeng, ZHENG Hong. Multi-Stockyard Scheduling Considering Technological Process and Combined Assembly Block [J]. Journal of Shanghai Jiao Tong University, 2020, 54(4): 331-343. |
[12] | MA Changpu,ZHOU Binghai. Scheduling of Multi-Load Rail Guided Vehicles in AS/RS with Collision Avoidance Constrains [J]. Journal of Shanghai Jiaotong University, 2020, 54(2): 126-134. |
[13] | FANG Jia, LU Zhiqiang. Modeling and Optimization of Robust Scheduling Template Considering Equipment Failure [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1278-1290. |
[14] | ZHAO Rui, GU Xingsheng. A Discrete Sine Optimization Algorithm for No-Idle Flow-Shop Scheduling Problem [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1291-1299. |
[15] | CUI Weiwei (崔维伟). Approximate Approach to Deal with the Uncertainty in Integrated Production Scheduling and Maintenance Planning [J]. Journal of Shanghai Jiao Tong University (Science), 2020, 25(1): 106-117. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||