Journal of Shanghai Jiaotong University ›› 2015, Vol. 49 ›› Issue (04): 564-571.
• Others • Previous Articles Next Articles
ZHANG Bowen1,LU Zhiqiang1,ZHANG Yuejun2
Received:
2013-12-02
ZHANG Bowen1,LU Zhiqiang1,ZHANG Yuejun2. An Integrated Model of Production Planning and Preventive Maintenance for Parallel Systems[J]. Journal of Shanghai Jiaotong University, 2015, 49(04): 564-571.
[1]Karimi B, Fatemi Ghomi S M T, Wilson J M. The capacitated lot sizing problem: a review of models and algorithms [J]. Omega, 2003, 31(5):365378.[2]潘常春,杨根科,孙凯,等. 带最小批量约束的计划问题及其拉格朗日松弛算法[J]. 控制理论与应用,2009,26(2):133138.PAN Changchun, YANG Genke,Sun Kai, et al. A Lagrange algorithm for capacitated lotsize problem with minimum lotsize constraint [J]. Control Theory and Applications, 2009,26(2): 133138.[3]Aghezzaf E H, Jamali M A, AitKadi D. An integrated production and preventive maintenance planning model [J]. European Journal of Operational Research, 2007, 181 (2): 676685. [4]Toledo F M B T, Armentano V A. A Lagrangianbased heuristic for the capacitated lotsizing problem in parallel machines [J]. European Journal of Operational Research, 2007, 175 (2): 10701083.[5]Wang Hongzhou. A survey of maintenance policies of deteriorating systems [J]. European Journal of Operational Research, 2002, 139 (3): 469489.[6]Aghezzaf E H, Najid M N. Integrated production planning and preventive maintenance in deteriorating production systems [J]. Information Sciences, 2008, 178 (17): 33823392.[7]陈一梅,李少斌,金彬彬.基于预防性成组维修的人字门船闸大修周期[J]. 东南大学学报(自然科学版), 2014,44(2):436440.CHEN Yimei, LI Shaobin, JIN Binbin. Determination of cycle of mitering lock overhaul based on preventive group maintenance strategy [J]. Journal of Southeast University(Natural Science Edition), 2014,44(2): 436440.[8]Park K S,Yoo Y K. Comparison of group replacement policies under minimal repair [J]. International Journal of Systems Science, 2004, 35(3): 179184.[9]赵洪山,张路朋. 基于可靠度的风电机组预防性机会维修策略[J]. 中国电机工程学报, 2014,34(22):37773783.ZHAO Hongshan, ZHANG Lupeng. Preventive opportunistic maintenance strategy for wind turbines based on reliability [J]. Proceeding of the CSEE, 2014, 34(22): 37773783.[10]Nourelfath M,Chatelet E. Integrating production, inventory and maintenance planning for a parallel system with dependent components [J]. Reliability Engineering and System Safety, 2012, 101: 5966.[11]Lu Zhiqiang, Zhang Yuejun,Han Xiaode. Integrating runbased preventive maintenance into the capacitated lot sizing problem with reliability constraint [J]. International Journal of Production Research, 2013,51(5): 13751391.[12]夏唐斌,周晓军,奚立峰. 基于失效率调整因子的多目标动态预防性维护决策建模[J]. 上海交通大学学报, 2009,43(5):821824.XIA Tangbin, ZHOU Xiaojun, XI Lifeng. Multiattribute model for dynamic preventive maintenance decision with hybrid evolution factors [J]. Journal of Shanghai Jiaotong University, 2009,43 (5): 821824.[13]Galante G, Passannanti G. An exact algorithm for preventive maintenance planning of seriesparallel systems [J]. Reliability Engineering and System Safety, 2009, 94(10): 15171525.[14]Laggoune R, Chateauneuf A, Aissani D. Opportunistic policy for optimal preventive maintenance of a multicomponent system in continuous operating units [J]. Computers & Chemical Engineering, 2009, 33 (9): 14991510. |
[1] | XIAO Changsheng, ZHOU Xiaojun, ZHU Mixin. Maintenance Modeling of Remanufacturing Systems in Variable Working Condition with Coupling of Production Scheduling and Reliability [J]. Journal of Shanghai Jiao Tong University, 2024, 58(8): 1211-1220. |
[2] | MAO Wenxin, ZHOU Xiaojun. Opportunistic Maintenance Modeling of Large-Scale Hot Rolling Production Line Based on Maintenance Priority and Dual Variable Time Window [J]. Journal of Shanghai Jiao Tong University, 2024, 58(8): 1221-1230. |
[3] | YANG Bo, ZENG Chunyuan, CHEN Yijun, SHU Hongchun, CAO Pulin. Extreme Learning Machine and Its Application in Parameter Identification of Proton Exchange Membrane Fuel Cell [J]. Journal of Shanghai Jiao Tong University, 2023, 57(4): 482-494. |
[4] | LI Xinlong, RAN Yan, ZHANG Genbao, HE Yan. Sequential Preventive Maintenance Strategy Considering Difference of Maintenance Effect [J]. Journal of Shanghai Jiao Tong University, 2023, 57(11): 1522-1530. |
[5] | FAN Houming, MA Xiaobin, PENG Wenhao, YUE Lijun, MA Mengzhi. Container Allocation in Multi-Blocks and Optimization of Yard Crane Dispatching in Non-Engagement of Container Delivery Truck [J]. Journal of Shanghai Jiao Tong University, 2023, 57(10): 1261-1272. |
[6] | LIU Jiahe, HU Pengwei, CHENG Hailong. Research on Condition-Based Maintenance of Complex System Based on Performance Degradation [J]. Air & Space Defense, 2023, 6(1): 56-62. |
[7] | YE Hongqing, SU Huade, ZHENG Meimei, XIA Tangbin. Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1359-1367. |
[8] | ZHONG Xiaobo, YU Long, LÜ Shun, MU Wentong, ZHU Yanfeng. Construction and Application of Functional Equipment Group in Qinshan Nuclear Power Plant [J]. Journal of Shanghai Jiao Tong University, 2021, 55(S2): 1-6. |
[9] | WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints [J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110. |
[10] | DU Yu,LI Yuqing,ZHANG Xiufang,PAN Ershun. Preventive Maintenance and Replacement Policy for Series Deteriorating Production System Considering Generalized Time Value [J]. Journal of Shanghai Jiaotong University, 2020, 54(5): 465-472. |
[11] | SU Chun,ZHAO Jiabin. Optimal Design for Flexible Basic Warranty Policies Based on Usage Rate of Products [J]. Journal of Shanghai Jiaotong University, 2020, 54(11): 1182-1188. |
[12] | ZHU Mixin, GE Yaxiong, ZHOU Xiaojun. Preventive Maintenance Strategy for Multi-Stage Flexible Manufacturing System with Dynamic Production Planning [J]. Journal of Shanghai Jiaotong University, 2020, 54(11): 1124-1133. |
[13] | YU Mengqi,SHI Kailong,ZHOU Xiaojun. Opportunistic Maintenance Strategy for Multi-Unit Serial Systems Based on Dual Time Window [J]. Journal of Shanghai Jiaotong University, 2020, 54(1): 69-75. |
[14] | GUO Wenyu,ZHANG Xiufang,XIU Yujiao,XIA Tangbin,PAN Ershun. Integrating Strategy of Preventive Maintenance and Buffer Allocation Considering Dynamic Degradations for Manufacturing Systems [J]. Journal of Shanghai Jiaotong University, 2019, 53(9): 1107-1114. |
[15] | MENG Lingtong,JIANG Zuhua,TAO Ningrong,LIU Jianfeng,LI Baihe. Combined Assembly Block Scheduling in Storage Yard of Shipbuilding [J]. Journal of Shanghai Jiaotong University, 2019, 53(7): 780-788. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||