[1]Ikura Y, Gimple M. Scheduling algorithms for a single batch processing machine [J]. Operations Research Letters, 1986, 5(1): 6165.[2]赵玉芳,唐立新. 极小化总完工时间的单机连续型批调度问题[J]. 电子学报, 2008, 36(2): 367370.ZHAO Yufang, TANG Lixin. Scheduling a single continuous batch processing machine to minimize total completion time[J]. Acta Electronica Sinica, 2008, 36(2): 367370.[3]Ng C T,Cheng T C E,Yuan J J, et al. On the single machine serial batching scheduling problem to minimize total completion time with precedence constraints, release dates and identical processing times[J]. Operations Research Letters, 2003, 31(2): 323326.[4]Coffman E G Jr, Yannakakis M, Magazine M J, et al. Batch sizing and job sequencing on a single machine [J]. Annals of Operations Research, 1990, 26(2): 135147.[5]Brucker P, Gladky A, Hoogeveen H, et al. Scheduling a batching machine[J]. Journal of Scheduling,1998, 1(1): 3154.[6]薛耀锋, 袁景淇. 基于预排序的并行批处理过程调度模型[J]. 上海交通大学学报, 2007, 41(8): 13301333.XUE Yaofeng, YUAN Jingqi. A scheduling model of parallel batch process based on preordering[J]. Journal of Shanghai Jiaotong university, 2007, 41(8): 13301333.[7]谢志强. 工件间有约束的复杂产品工序调度研究[D]. 哈尔滨:哈尔滨理工大学机械动力工程学院, 2009.[8]谢志强, 王悦, 杨静. 存在批量为2的批处理设备的综合调度算法[J]. 北京工业大学学报, 2011, 37(10): 14711478.XIE Zhiqiang, WANG Yue, YANG Jing. Integrated scheduling algorithm with batch processing machines with the lotsize being two[J]. Journal of Beijing University of Technology, 2011, 37(10): 14711478.[9]谢志强, 张磊, 杨静. 基于调度长路径的复杂产品综合调度算法[J]. 计算机科学, 2010, 37(2): 150153.XIE Zhiqiang, ZHANG Lei, YANG Jing. Integrated scheduling algorithm of complex product based on scheduling longpath[J]. Computer Science, 2010, 37(2): 150153.[10]谢志强, 杨静, 杨光, 等. 可动态生成具有优先级工序集的动态JobShop调度算法[J]. 计算机学报, 2008, 31(3): 502508.XIE Zhiqiang, YANG Jing, YANG Guang, et al. Dynamic jobshop scheduling algorithm with dynamic set of operation having priority[J]. Chinese Journal of Computers, 2008, 31(3): 502508.[11]熊禾根, 李建军, 孔建益, 等. 考虑工序相关性的动态Job Shop调度问题启发式算法[J]. 机械工程学报, 2006, 42(8): 5055.XIONG Hegen, LI Jianjun, KONG Jianyi, et al. Heuristic method for dynamic job shop scheduling problem with operation relativity[J]. Chinese Journal of Mechanical Engineering, 2006,42(8):5055.[12]曾立平, 黄文奇. 求解JobShop调度问题的一种新的邻域搜索算法[J]. 计算机研究与发展, 2005, 42(4): 582587.ZENG Liping, HUANG Wenqi. A new local search algorithm for the job shop scheduling problem[J]. Journal of Computer Research and Development, 2005,42(4):582587. |