[1]Einstein H H. Risk and risk analysis in rock engineering[J]. Tunneling and Underground Space Technology, 1996, 11(2): 1415.[2]Einstein H H, Xu S, Grasos P, et al. Decision aids in tunneling[J]. World Tunneling, 1998(4): 157159.[3]Sturk R, Olsson L, Johansson J. Risk and decision analysis for large underground projects as applied to the Stockholm ring road tunnels [J]. Tunneling and Underground Space Technology, 1996, 11(2): 158164.[4]You K, Park Y, Lee J S. Risk analysis for determination of a tunnel support pattern [J]. Tunneling and Underground Space Technology, 2005, 20(2): 479486.[5]黄宏伟. 隧道及地下工程建设中的风险管理研究进展[J].地下空间与工程学报, 2006, 2(1): 1320.HUANG Hongwei. State of the art of the research on risk management in construction of tunnel and underground works [J]. Chinese Journal of Underground Space and Engineering, 2006, 2(1): 1320.[6]陈桂香, 黄宏伟, 尤建新. 对地铁项目全寿命周期风险管理的研究[J]. 地下空间与工程学报, 2006, 2(1): 4751.CHAN Guixiang, HUANG Hongwei, YOU Jianxin. Study on life cycle risk management of metro[J]. Chinese Journal of Underground Space and Engineering, 2006, 2(1): 4751.[7]周红波. 基于贝叶斯网络的深基坑风险模糊综合评估方法[J]. 上海交通大学学报, 2009, 43(9): 14731479.ZHOU Hongbo. Risk assessment of deep foundation pit by using fuzzy comprehensive evaluation method based on Bayesian networks[J]. Journal of Shanghai Jiaotong University, 2009, 43(9): 14731479.[8]程子聪. 大直径泥水盾构下穿机场道面施工控制技术研究[D]. 上海: 同济大学土木工程学院, 2010. |