[1]刘建航. 上海地铁一号线地下工程的技术概要[J]. 建筑施工,1996 (1): 58.LIU Jianhang. Technical summary on underground engineering for Shanghai No.1 metro line [J]. Architecture Construction, 1996 (1): 58.[2]肖立,张庆贺. 盾构长距离下穿铁路股道引起的地表沉降分析[J]. 上海交通大学学报, 2011, 45(5): 672676.XIAO Li, ZHANG Qinghe. Study on ground settlement caused by shield tunneling long distance across multitracks[J]. Journal of Shanghai Jiaotong University, 2011, 45(5): 672676.[3]陈亮, 黄宏伟, 王如路.近距离上部穿越对原有隧道沉降的影响分析[J]. 土木工程学报, 2006, 39 (6): 8487.CHEN Liang, HUANG Hongwei, WANG Rulu. Analysis of the observed longitudinal settlement of a tunnel caused by an adjacent shield tunneling on top [J]. China Civil Engineering Journal, 2006, 39 (6): 8487.[4]廖少明, 杨俊龙, 奚程磊. 盾构近距离穿越施工的工作面土压力研究[J]. 岩土力学, 2005, 26 (11): 17271730.LIAO Shaoming, YANG Junlong, XI Chenglei. Approach to earth balance pressure of shield tunneling across ultranear metro tunnel in operation[J]. Rock and Soil Mechanics, 2005, 26 (11): 17271730.[5]廖少明, 余炎, 李文林. 地中弹性边界对盾构近距离掘进位移场的影响[J]. 岩石力学与工程学报, 2005, 24 (19): 35343540. LIAO Shaoming, YU Yan, LI Wenlin. Effects of elastic boundary in ground on displacement field induced by shield tunneling[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (19): 35343540. [6]LIAO Shaoming, LIU Jianhang, WANG Rulu. Shield tunneling and environment protection in Shanghai soft ground[J]. Tunneling and Underground Space Technology, 2009, 24 (4):454465. |