For the current situation that the application of risk matrix method may result in too many risk ties
which will block risk management and decision making, and based on the brief introduction of risk matrix method,
this paper subdivides the risk levels, gives an improved risk matrix method, conducts risk assessment of contractor
support using the improved risk matrix method, and determines the risk rates and the acceptable level.
ZHANG Fu-yuan* (张福元), LI Dong-yang (李东阳), GENG Bin (耿 斌), LIU Zhan-ling (刘占岭)
. Risk Assessment of Contractor Support Based on Improved Risk Matrix Method[J]. Journal of Shanghai Jiaotong University(Science), 2015
, 20(4)
: 464
-467
.
DOI: 10.1007/s12204-015-1650-7
[1] Xu Xian-hao, Tang Ze-lin. Risk assessment of logistics outsourcing based on risk matrix [J]. Logistics Technology,2006 (5): 67-69 (in Chinese).
[2] Zhang Fu-yuan. Study on the risk management of high-tech equipment contractor support [R]. Shijiazhuang:Shijiazhuang New Technology Application Institute, 2011 (in Chinese).
[3] Zhu Qi-chao, Kuang Xing-hua, Shen Yong-ping. Risk matrix method and its application [J]. Engineering Sciences,2003, 5(1): 89-94 (in Chinese).
[4] Xu Shu, Hu Ming-ming, Li Zi-ru. The application of risk matrix method in risk assessment of business outsourcing[J]. Modernization of Management, 2004 (2):13-16 (in Chinese).