WANG Xubo1,2* (王续伯), BAI Sijun1 (白思俊), LI Suike1 (李随科). Space Enterprise Strategy Guiding-Based Study on Project Portfolio Management and Flow Optimization[J]. Journal of shanghai Jiaotong University (Science), 2016, 21(2): 215-219.
CAO Y, ZHANG Y J, ZHAO R J. Project management and coordination of distributed cooperative productdesign in a virtual enterprise [J]. International Journalof Plant Engineering and Management, 2004, 9(4):183-191.
[2]
SABATIER V, MANGEMATIN V, ROUSSELLE T.From recipe to dinner: Business model portfolios in the European biopharmaceutical industry [J]. Long Range Planning, 2010, 43(2/3): 431-447.
[3]
GOLMOHAMMADI A, PAJOUTAN M. Meta heuristicsfor dependent portfolio selection problem consideringrisk [J]. Expert Systems with Applications, 2011,38(5): 5642-5649.
[4]
GERALDI J G. The balance between order and chaosin multi-project firms: A conceptual model [J]. InternationalJournal of Project Management, 2008, 26(4):348-356.
[5]
CARAZO A F, G′OMEZ T, MOLINA J, et al. Solvinga comprehensive model for multiobjective project portfolioselection [J]. Computers & Operations Research,2010, 37(4): 630-639.
[6]
ARA′UZO J A, PAJARES J, LOPEZ-PAREDES A.Simulating the dynamic scheduling of project portfolios[J]. Simulation Modelling Practice and Theory,2010, 18(10): 1428-1441.
[7]
SOLAK S, CLARKE J P B, JOHNSON E L, et al.Optimization of R&D project portfolios under endogenousuncertainty [J]. European Journal of OperationalResearch, 2010, 207: 420-433.
[8]
Bai S J, Li S, FENG R, et al. Organizational projectselection based on fuzzy multi-index evaluation andBP neural network [C]//International Conference onManagement and Service Science. [s.l.]: IEEE, 2010:1-5.
[9]
WANG C T, YU M, ZHANG N, et al. Small satelliteproject management practice [J]. Spacecraft Engineering,2012, 21(5): 119-126 (in Chinese).
[10]
YANG B H, TANG B X, DAI W X, et al. Recoverablesatellite program process reengineering practice[J]. Journal of Space, 2007, 28(6): 1733-1739 (in Chinese).