[1] AGHEZZAF E H, JAMALIM A, AIT-KADI D. An integratedproduction and preventive maintenance planningmodel [J]. European Journal of Operational Research,2007, 181(2): 679-685.
[2] AGHEZZAF E H, NAJID N M. Integrated productionplanning and preventive maintenance in deterioratingproduction systems [J]. Information Sciences,2008, 178(17): 3382-3392.
[3] NOURELFATH M, CH?ATELET E. Integrating production,inventory and maintenance planning for a parallelsystem with dependent components [J]. ReliabilityEngineering & System Safety, 2012, 101: 59-66.
[4] LU Z, ZHANG Y, HAN X. Integrating run-based preventivemaintenance into the capacitated lot sizingproblem with reliability constraint [J]. InternationalJournal of Production Research, 2013, 51(5): 1379-1391.
[5] ZHAO S,WANG L, ZHENG Y. Integrating productionplanning and maintenance: An iterative method [J].Industrial Management & Data Systems, 2014, 114(2):162-182.
[6] LIU X,WANG W, PENG R. An integrated productionand delay-time based preventive maintenance planningmodel for a multi-product production system [J]. Eksploatacjai Niezawodno′s′c: Maintenance and Reliability,2015, 17(2): 215-221.
[7] AGHEZZAF E H, KHATAB A, LE TAM P. Optimizingproduction and imperfect preventive maintenanceplanning’s integration in failure-prone manufacturingsystems [J]. Reliability Engineering & System Safety,2016, 145: 190-198.
[8] TIAN Z, JIN T, WU B, et al. Condition based maintenanceoptimization for wind power generation systemsunder continuous monitoring [J]. Renewable Energy,2011, 36(5): 1502-1509.
[9] RAUSCH M, LIAO H. Joint production and sparepart inventory control strategy driven by conditionbased maintenance [J]. IEEE Transactions on Reliability,2010, 59(3): 507-516.
[10] GRALL A, B′ERENGUER C, DIEULLE L. Acondition-based maintenance policy for stochasticallydeteriorating systems [J]. Reliability Engineering &System Safety, 2002, 76(2): 167-180.
[11] JARDINE A K S, LIN D, BANJEVIC D. A review onmachinery diagnostics and prognostics implementingcondition-based maintenance [J]. Mechanical Systemsand Signal Processing, 2006, 20(7): 1483-1510.
[12] CHOUIKHI H, KHATAB A, REZG N. A conditionbasedmaintenance policy for a production system underexcessive environmental degradation [J]. Journalof Intelligent Manufacturing, 2014, 25(4): 727-737.
[13] BOUSDEKIS A, MAGOUTAS B, APOSTOLOU D,et al. A proactive decision making framework forcondition-based maintenance [J]. Industrial Management& Data Systems, 2015, 115(7): 1225-1250.
[14] DO P, VOISIN A, LEVRAT E, et al. A proactivecondition-based maintenance strategy with both perfectand imperfect maintenance actions [J]. ReliabilityEngineering & System Safety, 2015, 133: 22-32.
[15] KEIZERMC A O, FLAPPER S D P, TEUNTER R H.Condition-based maintenance policies for systems withmultiple dependent components: A review [J]. EuropeanJournal of Operational Research, 2017, 261(2):405-420.
[16] AHMAD R, KAMARUDDIN S. An overview of timebasedand condition-based maintenance in industrialapplication [J]. Computers & Industrial Engineering,2012, 63(1): 135-149.
[17] KIM J, AHN Y, YEO H. A comparative study of timebasedmaintenance and condition-based maintenancefor optimal choice of maintenance policy [J]. Structureand Infrastructure Engineering, 2016, 12(12): 1525-1536.
[18] GHASEMI A, YACOUTS, OUALIMS. Optimal conditionbased maintenance with imperfect informationand the proportional hazards model [J]. InternationalJournal of Production Research, 2007, 45(4): 989-1012.
[19] TIAN Z, LIAO H. Condition based maintenance optimizationfor multi-component systems using proportionalhazards model [J]. Reliability Engineering & SystemSafety, 2011, 96(5): 581-589.
[20] LU B, ZHOU X, LI Y. Joint modeling of preventivemaintenance and quality improvement for deterioratingsingle-machine manufacturing systems [J]. Computers& Industrial Engineering, 2016, 91: 188-196.
[21] SLOAN T W, SHANTHIKUMAR J G. Combined productionand maintenance scheduling for a multipleproduct,single-machine production system [J]. Productionand Operations Management, 2000, 9(4): 379-399.
[22] SLOAN T W. A periodic review production and maintenancemodel with random demand, deterioratingequipment, and binomial yield [J]. Journal of the OperationalResearch Society, 2004, 55(6): 647-656.
[23] XIANG Y, CASSADY C R, JIN T, et al. Joint productionand maintenance planning with machine deteriorationand random yield [J]. International Journalof Production Research, 2014, 52(6): 1644-1657.
[24] JAFARI L, MAKIS V. Joint optimal lot sizing andpreventive maintenance policy for a production facilitysubject to condition monitoring [J]. InternationalJournal of Production Economics, 2015, 169: 156-168.
[25] LIU X, WANG W, PENG R. An integrated production,inventory and preventive maintenance model fora multi-product production system [J]. Reliability Engineering& System Safety, 2015, 137: 76-86.
[26] BONFILL A, ESPUNA A, PUIGJANER L. Proactiveapproach to address the uncertainty in short-termscheduling [J]. Computers & Chemical Engineering,2008, 32(8): 1689-1706.
[27] WANG D J, LIU F, WANG Y Z, et al. A knowledgebasedevolutionary proactive scheduling approach inthe presence of machine breakdown and deteriorationeffect [J]. Knowledge-Based Systems, 2015, 90: 70-80.
[28] BEYER H G, SENDHOFF B. Robust optimization: Acomprehensive survey [J]. Computer Methods in AppliedMechanics and Engineering, 2007, 196(33/34):3190-3218.
[29] HAN X L, LU Z Q, XI L F. A proactive approach forsimultaneous berth and quay crane scheduling problemwith stochastic arrival and handling time [J]. EuropeanJournal of Operational Research, 2010, 207(3): 1327-1340.
|