摘要: A proactive approach is constructed to cope with the integrated problem of batch production and maintenance in a deteriorating system. The condition of the system is modeled by a proportional hazards model (PHM) which considers both system deterioration state and usage. The deterioration state of system is uncertain and is only observed between batches. An integration model for optimizing production plan and conditionbased maintenance (CBM) policy is proposed, in which the maintenance threshold and production quantity are proactively decided simultaneously. To obtain a robust solution with minimal cost over the planning horizon, a simulation-based iterative algorithm is developed to solve the complicated non-linear model. Numerical results show that the performance of the developed approach is satisfactory under uncertainty.
中图分类号:
WANG Lin (王林), LU Zhiqiang *(陆志强). Proactive Approach for Production and Condition-Based Maintenance Integration Problem in a Deteriorating System[J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 500-509.
WANG Lin (王林), LU Zhiqiang *(陆志强). Proactive Approach for Production and Condition-Based Maintenance Integration Problem in a Deteriorating System[J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 500-509.
[1] AGHEZZAF E H, JAMALIM A, AIT-KADI D. An integratedproduction and preventive maintenance planningmodel [J]. European Journal of Operational Research,2007, 181(2): 679-685. [2] AGHEZZAF E H, NAJID N M. Integrated productionplanning and preventive maintenance in deterioratingproduction systems [J]. Information Sciences,2008, 178(17): 3382-3392. [3] NOURELFATH M, CH?ATELET E. Integrating production,inventory and maintenance planning for a parallelsystem with dependent components [J]. ReliabilityEngineering & System Safety, 2012, 101: 59-66. [4] LU Z, ZHANG Y, HAN X. Integrating run-based preventivemaintenance into the capacitated lot sizingproblem with reliability constraint [J]. InternationalJournal of Production Research, 2013, 51(5): 1379-1391. [5] ZHAO S,WANG L, ZHENG Y. Integrating productionplanning and maintenance: An iterative method [J].Industrial Management & Data Systems, 2014, 114(2):162-182. [6] LIU X,WANG W, PENG R. An integrated productionand delay-time based preventive maintenance planningmodel for a multi-product production system [J]. Eksploatacjai Niezawodno′s′c: Maintenance and Reliability,2015, 17(2): 215-221. [7] AGHEZZAF E H, KHATAB A, LE TAM P. Optimizingproduction and imperfect preventive maintenanceplanning’s integration in failure-prone manufacturingsystems [J]. Reliability Engineering & System Safety,2016, 145: 190-198. [8] TIAN Z, JIN T, WU B, et al. Condition based maintenanceoptimization for wind power generation systemsunder continuous monitoring [J]. Renewable Energy,2011, 36(5): 1502-1509. [9] RAUSCH M, LIAO H. Joint production and sparepart inventory control strategy driven by conditionbased maintenance [J]. IEEE Transactions on Reliability,2010, 59(3): 507-516. [10] GRALL A, B′ERENGUER C, DIEULLE L. Acondition-based maintenance policy for stochasticallydeteriorating systems [J]. Reliability Engineering &System Safety, 2002, 76(2): 167-180. [11] JARDINE A K S, LIN D, BANJEVIC D. A review onmachinery diagnostics and prognostics implementingcondition-based maintenance [J]. Mechanical Systemsand Signal Processing, 2006, 20(7): 1483-1510. [12] CHOUIKHI H, KHATAB A, REZG N. A conditionbasedmaintenance policy for a production system underexcessive environmental degradation [J]. Journalof Intelligent Manufacturing, 2014, 25(4): 727-737. [13] BOUSDEKIS A, MAGOUTAS B, APOSTOLOU D,et al. A proactive decision making framework forcondition-based maintenance [J]. Industrial Management& Data Systems, 2015, 115(7): 1225-1250. [14] DO P, VOISIN A, LEVRAT E, et al. A proactivecondition-based maintenance strategy with both perfectand imperfect maintenance actions [J]. ReliabilityEngineering & System Safety, 2015, 133: 22-32. [15] KEIZERMC A O, FLAPPER S D P, TEUNTER R H.Condition-based maintenance policies for systems withmultiple dependent components: A review [J]. EuropeanJournal of Operational Research, 2017, 261(2):405-420. [16] AHMAD R, KAMARUDDIN S. An overview of timebasedand condition-based maintenance in industrialapplication [J]. Computers & Industrial Engineering,2012, 63(1): 135-149. [17] KIM J, AHN Y, YEO H. A comparative study of timebasedmaintenance and condition-based maintenancefor optimal choice of maintenance policy [J]. Structureand Infrastructure Engineering, 2016, 12(12): 1525-1536. [18] GHASEMI A, YACOUTS, OUALIMS. Optimal conditionbased maintenance with imperfect informationand the proportional hazards model [J]. InternationalJournal of Production Research, 2007, 45(4): 989-1012. [19] TIAN Z, LIAO H. Condition based maintenance optimizationfor multi-component systems using proportionalhazards model [J]. Reliability Engineering & SystemSafety, 2011, 96(5): 581-589. [20] LU B, ZHOU X, LI Y. Joint modeling of preventivemaintenance and quality improvement for deterioratingsingle-machine manufacturing systems [J]. Computers& Industrial Engineering, 2016, 91: 188-196. [21] SLOAN T W, SHANTHIKUMAR J G. Combined productionand maintenance scheduling for a multipleproduct,single-machine production system [J]. Productionand Operations Management, 2000, 9(4): 379-399. [22] SLOAN T W. A periodic review production and maintenancemodel with random demand, deterioratingequipment, and binomial yield [J]. Journal of the OperationalResearch Society, 2004, 55(6): 647-656. [23] XIANG Y, CASSADY C R, JIN T, et al. Joint productionand maintenance planning with machine deteriorationand random yield [J]. International Journalof Production Research, 2014, 52(6): 1644-1657. [24] JAFARI L, MAKIS V. Joint optimal lot sizing andpreventive maintenance policy for a production facilitysubject to condition monitoring [J]. InternationalJournal of Production Economics, 2015, 169: 156-168. [25] LIU X, WANG W, PENG R. An integrated production,inventory and preventive maintenance model fora multi-product production system [J]. Reliability Engineering& System Safety, 2015, 137: 76-86. [26] BONFILL A, ESPUNA A, PUIGJANER L. Proactiveapproach to address the uncertainty in short-termscheduling [J]. Computers & Chemical Engineering,2008, 32(8): 1689-1706. [27] WANG D J, LIU F, WANG Y Z, et al. A knowledgebasedevolutionary proactive scheduling approach inthe presence of machine breakdown and deteriorationeffect [J]. Knowledge-Based Systems, 2015, 90: 70-80. [28] BEYER H G, SENDHOFF B. Robust optimization: Acomprehensive survey [J]. Computer Methods in AppliedMechanics and Engineering, 2007, 196(33/34):3190-3218. [29] HAN X L, LU Z Q, XI L F. A proactive approach forsimultaneous berth and quay crane scheduling problemwith stochastic arrival and handling time [J]. EuropeanJournal of Operational Research, 2010, 207(3): 1327-1340. |
[1] | QIAN Yuan, FENG Zhengping, BI Anyuan, LIU Weiqi . T-S Fuzzy Model-Based Depth Control of Underwater Vehicles[J]. Journal of Shanghai Jiao Tong University (Science), 2020, 25(3): 315-324. |
[2] | CUI Weiwei (崔维伟). Approximate Approach to Deal with the Uncertainty in Integrated Production Scheduling and Maintenance Planning [J]. Journal of Shanghai Jiao Tong University (Science), 2020, 25(1): 106-117. |
[3] | BAI Junli (柏君励), MA Ning (马宁), GU Xiechong (顾解忡). Numerical Simulation of Focused Wave and Its Uncertainty Analysis[J]. Journal of Shanghai Jiao Tong University (Science), 2018, 23(4): 475-. |
[4] | WENG Paul1,2*, QIU Zeqi3 (邱泽麒), COSTANZO John3, YIN Xiaoqi3 (阴小骐), SINOPOLI Brun. Optimal Threshold Policies for Robust Data Center Control[J]. sa, 2018, 23(1): 52-60. |
[5] | HOU Yuanhang* (候远杭), YOU Yuan (游园), LIANG Xiao (梁霄). Minimum Resistance Ship Hull Uncertainty Optimization Design Based on Simulation-Based Design Method[J]. 上海交通大学学报(英文版), 2017, 22(6): 657-663. |
[6] | LIANG Qingxue (梁晴雪), HU Hao* (胡昊). Uncertainty Analysis of Value for Money Assessment for Public-Private Partnership Projects[J]. 上海交通大学学报(英文版), 2017, 22(6): 672-681. |
[7] | ZHU Ren-chuan1 (朱仁传), YANG Chun-lei1,2* (杨春蕾), MIAO Guo-ping1 (缪国平), FAN Ju1 (范 . Computational Fluid Dynamics Uncertainty Analysis for Simulations of Roll Motions for a 3D Ship[J]. 上海交通大学学报(英文版), 2015, 20(5): 591-599. |
[8] | SHI Hong-Qin1 (石红芹), HE Jun2* (何 军). Smolyak Type Sparse Grid Collocation Method for Uncertainty Quantification of Nonlinear Stochastic Dynamic Equations[J]. 上海交通大学学报(英文版), 2015, 20(5): 612-617. |
[9] | WEN Liang1,2* (温 亮), WU Su1 (吴 甦), JIA Xi-sheng2 (贾希胜). An Interval Algorithm of Maintenance Windows Under Uncertain Parameters[J]. 上海交通大学学报(英文版), 2015, 20(4): 495-499. |
[10] | HU Sheng-yong* (胡盛勇), LUO Jun (罗军). Uncertainty Quantification for Structural Optimal Design Based on Evidence Theory[J]. 上海交通大学学报(英文版), 2015, 20(3): 338-343. |
[11] | GAO Yang* (高扬), LIU Xi-la (刘西拉). Topology-Based Quantitative Assessment of Structural Robustness[J]. 上海交通大学学报(英文版), 2014, 19(3): 257-264. |
[12] | GAO Yang* (高扬), LIU Xi-la (刘西拉). Weighted Graph Form of Structures and Its Application in Robustness Analysis[J]. 上海交通大学学报(英文版), 2013, 18(2): 216-223. |
[13] | LIU Tao (刘 涛), ZHANG Wei-jing (张维竞), MA Jie (马 捷). Robust Adaptive Horizontal Vibration Isolation of Towed Seismic Streamers[J]. 上海交通大学学报(英文版), 2012, 17(1): 31-039. |
[14] | LI Bin (李 斌), WAN Yi-ming (万一鸣), YE Hao (叶 昊) . Fault Detection of Networked Control Systems with Uncertain Time-Varying Delay and Quantization Error[J]. 上海交通大学学报(英文版), 2011, 16(5): 513-518. |
阅读次数 | ||||||||||||||||||||||||||||||||||||||||||||||||||
全文 114
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||
摘要 401
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||