[1] |
SLEPTCHENKO A, VAN DER HEIJDEN M C, VAN HARTEN A. Effects of finite repair capacity in multiechelon,multi-indenture service part supply systems[J]. International Journal of Production Economics,2002, 79(3): 209-230.
|
[2] |
RUSTENBURG W D, VAN HOUTUM G J, ZIJM WH M. Spare parts management at complex technologybasedorganizations: An agenda for research [J]. InternationalJournal of Production Economics, 2001,71(1): 177-193.
|
[3] |
SHERBROOKE C C. Metric: A multi-echelon technique for recoverable item control [J]. Operations Research,1968, 16(1): 122-141.
|
[4] |
WEI S H, CHEN Y Q, JIN J S. Warship spare partsallotment method under space and cost constraints [J].Systems Engineering and Electronics, 2013, 35(12):2540-2544 (in Chinese).
|
[5] |
CAI Z M, JIN J S, CHEN Y Q, et al. Warshipspare parts allotment method under multi-constraints[J]. Systems Engineering and Electronics, 2015, 37(4):838-844 (in Chinese).
|
[6] |
LIU Y, GAI Q, ZHAO C, et al. Research on spare partsstorage decision for ships on sailing in multi-restrain[J]. Ship Science and Technology, 2013, 35(11): 144-147 (in Chinese).
|
[7] |
LEE L H, CHEW E P, TENG S, et al. Multi-objectivesimulation-based evolutionary algorithm for an aircraftspare parts allocation problem [J]. European Journal ofOperational Research, 2008, 89(2): 476-491.
|
[8] |
KLINE R C, BACHMAN T C. Estimating spare partsrequirements with commonality and redundancy [J].Journal of Spacecraft and Rockets, 2007, 44(4): 977-984.
|
[9] |
RUAN M Z, LI Q M, ZHANG G Y, et al. Optimizationmethod of carrying spare parts warship equipmentunder multi-constraints [J]. Acta Armamentarii, 2013,34(9): 1144-1149 (in Chinese).
|
[10] |
WANG N C, KANG R. An optimization model forinventory spares under multi-constraints and its decompositionalgorithm [J]. Acta Armamentarii, 2009,30(2): 247-251 (in Chinese).
|
[11] |
FEI G Y, ZHANG Z H, LIU J, et al. Configurationmethod of spares on warship [J]. Command Control &Simulation, 2014, 36(3): 133-136 (in Chinese).
|
[12] |
BIAN J H, GUO L H, KANG R, et al. Spares optimizationunder the influence of false alarm [J]. Journalof Beijing University of Aeronautics and Astronautics,2014, 40(3): 413-416 (in Chinese).
|
[13] |
WANG Z Y, CAO J P, ZHU Y H, et al. Optimizationmodel on removable spare parts warehouse deployment[J]. Systems Engineering and Electronics, 2013,35(11): 2352-2355 (in Chinese).
|
[14] |
XU L, LI Q M, RUAN M Z. Support project optimizationfor warship formation with finite repair capacity[J]. Systems Engineering and Electronics, 2014,36(11): 2226-2232 (in Chinese).
|
[15] |
WANG Z Y, CAO J P, ZHU Y, et al. An optimizationmodel of wartime spare parts resource allocation onconsideration of maintainability [J]. Acta Armamentarii,2014, 35(5): 719-724 (in Chinese).
|
[16] |
ROOSTAEE R. A multi-criteria intuitionistic fuzzygroup decision making method for supplier selectionwith VIKOR method [J]. International Journal ofFuzzy System Applications (IJFSA), 2012, 2(1): 1-17.
|
[17] |
HUANG H Z, LIU Y, LI Y F, et al. New evaluationmethods for conceptual design selection using computationalintelligence techniques [J]. Journal of MechanicalScience and Technology, 2013, 27(3): 733-746.
|
[18] |
LI D Y, MENG H J, SHI X M. Membership cloudsand membership cloud generators [J]. Journal of ComputerResearch and Development, 1995, 32(6): 15-20(in Chinese).
|
[19] |
FARLEY R D, PHUONG N, HAROLD D O. Numericalsimulation of cloud seeding using a threedimensionalcloud model [J]. The Journal of WeatherModification, 2014, 26(1): 113-124.
|
[20] |
REZAEI R, CHIEW T K, LEE S P, et al. Interoperabilityevaluation models: A systematic review [J].Computers in Industry, 2014, 65(1): 1-23.
|
[21] |
MOLENAERS A, BAETS H, PINTELON L, et al.Criticality classification of spare parts: A case study[J]. International Journal of Production Economics,2012, 140(2): 570-578.
|
[22] |
ROMEIJNDERS W, TEUNTER R, VAN JAARSVELD W. A two-step method for forecastingspare parts demand using information on componentrepairs [J]. European Journal of Operational Research,2012, 220(2): 386-393.
|
[23] |
COSTANTINO F, GRNVIO G D, TRONCI M. Multiechelon,multi-indenture spare parts inventory controlsubject to system availability and budget constraints[J]. Reliability Engineering & System Safety,2013, 119: 95-101.
|
[24] |
ZHANG F, YIN X Q. The standard time measurementbased on product batch production [J]. Journalof Shandong University of Technology (Natural ScienceEdition), 2014, 28(3): 56-59 (in Chinese).
|
[25] |
LI D Y, LIU C Y. Study on the universality of thenormal cloud model [J]. China Engineering Science,2004, 6(8): 28-34 (in Chinese).
|