Time-Varying Reliability of Rust Cracking Model Based on Initial Defect

Expand
  • 1. College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China; 2. School of Civil Engineering, Central South University, Changsha 410075, China

Online published: 2020-04-30

Abstract

In this paper, the prediction model of rust expansion time of concrete structures with the consideration of initial defects is established based on the theory of fracture mechanics. The limit state function of structure life prediction is established and an analysis method of time-dependent reliability based on three-order moment method is developed. The results show that compared with Monte-Carlo method, this method reduces the calculation time and improves the analysis efficiency when the calculated results are more consistent with each other. Among the parameters of concrete materials, the failure probability of concrete structure is the most sensitive to the randomness and uncertainty of cover thickness and less sensitive to the probability distribution type of random variables.

Cite this article

ZHANG Qiang, LU Zhaohui, ZHAO Ran, LUN Peiyuan . Time-Varying Reliability of Rust Cracking Model Based on Initial Defect[J]. Journal of Shanghai Jiaotong University, 2020 , 54(4) : 413 -420 . DOI: 10.16183/j.cnki.jsjtu.2020.04.010

References

[1]ANGST U M. Challenges and opportunities in corrosion of steel in concrete[J]. Materials and Structures, 2018, 51(1): 1-20. [2]JIN W L, ZHAO Y X. Steel corrosion-induced concrete cracking[J]. Construction and Building Materials, 2016, 116: 273-280. [3]WONG H S, ZHAO Y X, KARIMI A R, et al. On the penetration of corrosion products from reinforcing steel into concrete due to chloride-induced corrosion[J]. Corrosion Science, 2010, 52: 2469-2480. [4]邵伟, 李镜培, 岳著文.氯离子侵蚀混凝土管桩寿命预测理论模型[J].硅酸盐学报, 2013, 41(5): 575-581. SHAO Wei, LI Jingpei, YUE Zhuwen. Service life prediction of concrete pipe pile due to chloride ion corrosion by modeling[J]. Journal of the Chinese Ceramic Society, 2013, 41(5): 575-581. [5]汪奔. 混凝土保护层锈胀开裂时间预测模型及细观裂纹扩展分析[D]. 成都: 西南交通大学, 2017. WANG Ben. A model for prediction of time to corrosion-induced concrete cover cracking and analysis of meso-crack propagation[D]. Chengdu: Southwest Jiaotong University, 2017. [6]DU X L, JIN L, ZHANG R B. Modeling the cracking of cover concrete due to non-uniform corrosion of reinforcement[J]. Corrosion Science, 2014, 89: 189-202. [7]ANDRADE C, ALONSO C, MOLINA F J. Cover cracking as a function of bar corrosion: Part I—Experimental test[J]. Materials and Structures, 1993, 26(8): 453-464. [8]MOLINA F J, ALONSO C, ANDRADE C. Cover cracking as a function of bar corrosion: Part 2—Numerical model[J]. Materials and Structures, 1993, 26(9): 532-548. [9]徐沛, 李敏辉, 张小刚. 钢筋混凝土结构保护层非均匀锈胀压力模型[J].深圳大学学报理工版, 2016, 33(6): 639-645. XU Pei, LI Minhui, ZHANG Xiaogang. Non-uniform steel corrosion expansive force model for the cover of reinforced concrete structure[J]. Journal of Shenzhen University Science and Engineering, 2016, 33(6): 639-645. [10]ZHANG X G, ZHAO Y G, LU Z H. Corrosion induced stress field and cracking time of reinforced concrete with initial defects: Analytical modeling and experimental investigation[J]. Corrosion Science, 2017, 120: 158-170. [11]樊玲, 卫军, 李江腾, 等. 基于氯离子时变扩散钢筋混凝土锈胀裂缝时变可靠度研究[J].湖南大学学报(自然科学版), 2014, 41(11): 67-73. FAN Ling, WEI Jun, LI Jiangteng, et al. Time-dependent corrosion reliability analysis considering on time-dependent chloride diffusion[J]. Journal of Hunan University (Natural Sciences), 2014, 41(11): 67-73. [12]周敏. 钢筋腐蚀对桥梁结构耐久性影响的研究[J]. 兰州: 兰州交通大学, 2017. ZHOU Min. Research on the effects of the durability of reinforcement corrosion on bridge structures[D]. Lanzhou: Lanzhou Jiaotong University, 2017. [13]LIU Y P, WEYERS R E. Modeling the time-to-corrosion cracking in chloride conta-minated reinforced concrete structures[J]. ACI Materials Journal, 1998, 95(6): 675-681. [14]ESRA M G, KASIM M, ERHAN G, et al. Numerical modeling of time to corrosion induced cover cracking in reinforced concrete using soft-computing based methods [J]. Materials and Structures, 2015, 48(6): 1739-1756. [15]赵然.考虑初始缺陷形状的混凝土构件锈胀开裂可靠度研究[D].长沙: 中南大学, 2018. ZHAO Ran. Reliability analysis of cover cracking of concrete structure considering the shape of initial defect[D]. Changsha: Central South University, 2018. [16]XU S, MUHAMMAD A M, LI Q H. Determination of double-K fracture parameters using semi-circular bend test specimens[J]. Engineering Fracture Mechanics, 2016, 152: 58-71. [17]李靖, 丁晓唐, 丁力栋. 基于双K断裂模型的海水对混凝土断裂性能的影响研究[J].河北工程大学学报(自然科学版), 2018, 35(3): 6-10. LI Jing, DING Xiaotang, DING Lidong. Research on the effect of seawater on the fracture performance of concrete based on double-K model [J]. Journal of Hebei University of Engineering (Natural Science Edition), 2018, 35(3): 6-10. [18]ZHANG X G, WANG X Z, LU Z H, et al. Analysis model of non-uniform corrosion induced cracking of reinforced concrete structure[J]. Journal of Central South University, 2011, 18: 940-945. [19]吴相豪.海洋环境中钢筋混凝土构件锈胀开裂时间的解析解[J].上海海事大学学报, 2006, 27(3): 22-26. WU Xianghao. Analytical solution for cracking time of reinforced concrete structure due to corrosion expansion in marine environment[J]. Journal of Shanghai Maritime University, 2006, 27(3): 22-26. [20]HUGO G, JOSE C M, ANTONIO A H. An innovative adaptive sparse response surface method for structural reliability analysis [J]. Structural Safety, 2018, 73: 12-28. [21]LIU Y P, WEYERS R E. Comparison of guarded and unguarded linear polarization CCD devices with weight loss measurements[J]. Cement and Concrete Research, 2003, 33: 1093-1101. [22]ZHANG X G, WANG J, ZHAO Y G, et al. Time-dependent probability assessment for chloride induced corrosion of RC structures using the third-moment method [J]. Construction and Building Materials, 2015, 76: 232-244. [23]ZHAO Y G, ZHANG X Y, LU Z H. Complete mo-notonic expression of the fourth-moment normal transformation for structural reliability[J]. Computers & Structures, 2018, 196: 186-199. [24]ZHAO Y G, ZHANG X Y, LU Z H. A flexible distribution and its application in reliability engineering[J]. Reliability Engineering and System Safety, 2018, 176: 1-12. [25]ZHAO Y X, ZHANG X W, JIN W L. Influence of environment on the development of corrosion product-filled paste and a corrosion layer at the steel/concrete interface[J]. Corrosion Science, 2017, 124: 1-9.
Outlines

/