Risk and Preventive Measures of Pile Placement in Chengdao Oilfield

AN Tao1(), LIN Zengyong1, ZHANG Da2   

  1. 1. Shengli Petroleum Engineering Co., Ltd., Sinopec, Dongying 257000, Shandong, China
    2. Qingdao Huanhai Marine Engineer Prospecting Institute Co., Ltd., Qingdao 266000, Shandong, China
  • Received:2022-07-07 Revised:2022-07-25 Accepted:2022-08-22 Online:2023-10-27 Published:2023-11-10

Abstract:

Chengdao Oilfield is located in the modern Yellow River underwater delta, where the seabed strata are complex, and the sediment silt and silty clay have great interbedding changes. In recent years, an increasing number of jack-ups are installed and removed in the same wellhead or similar wellhead. There are risks of sliding pile, punch-through, and liquefaction and subsidence in the area where piles are repeatedly inserted and pulled out on offshore moving platform. Aimed at the risks, preventive measures are analyzed to reduce the risk of pile driving on jack-up platforms.

Key words: Chengdao Oilfield, piles repeatedly inserted and pulled, sliding pile, punch-through, liquefaction and subsidence