Journal of Shanghai Jiao Tong University ›› 2018, Vol. 52 ›› Issue (7): 793-800.doi: 10.16183/j.cnki.jsjtu.2018.07.006
Previous Articles Next Articles
ZONG Baoshi,LU Zhiqiang
Published:
2018-07-28
CLC Number:
ZONG Baoshi,LU Zhiqiang. Integrated Optimization of Project Splitting and Resource Investment Project Scheduling[J]. Journal of Shanghai Jiao Tong University, 2018, 52(7): 793-800.
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/10.16183/j.cnki.jsjtu.2018.07.006
[1]MASTOR A A. An experimental investigation and comparative evaluation of production line balancing techniques[J]. Management Science, 1970, 16(11): 728-746. [2]MOHRING R H. Minimizing costs of resource requirements in project networks subject to a fixed completion time[J]. Operations Research, 1984, 32(1): 89-120. [3]DEMEULEMEESTER E. Minimizing resource avai-lability costs in time-limited project networks[J]. Management Science, 1995, 41(10): 1590-1598. [4]RANGASWAMY B. Multiple resource planning and allocation in resource-constrained project networks[D]. Colorado: University of Colorado, 1999. [5]DREXL A, KIMMS A. Optimization guided lower and upper bounds for the resource investment problem[J]. Journal of the Operational Research Society, 2001, 52(3): 340-351. [6]RODRIGUES S B, YAMASHITA D S. An exact algorithm for minimizing resource availability costs in project scheduling[J]. European Journal of Ope-rational Research, 2010, 206(3): 562-568. [7]KELLEY J E. The critical-path method: Resources planning and scheduling[C]∥Industrial Scheduling. New Jersey: Prentice-Hall, 1963: 347-365. [8]YAMASHITA D S, ARMENTANO V A, LAGUNA M. Scatter search for project scheduling with resource availability cost[J]. European Journal of Operational Research, 2006, 169(2): 623-637. [9]SHADROKH S, KIANFAR F. A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty[J]. European Journal of Operational Research, 2007, 181(1): 86-101. [10]RANJBAR M, KIANFAR F, SHADROKH S. Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm[J]. Applied Mathematics and Computation, 2008, 196(2): 879-888. [11]PETEGHEM V V, VANHOUCKE M. An artificial immune system algorithm for the resource availability cost problem[J]. Flexible Services & Manufacturing Journal, 2013, 25(1/2): 122-144. [12]陆志强, 杨超. 基于项目网络拆分决策的多项目协同调度问题建模[J]. 上海交通大学学报, 2017, 51(2): 193-201. LU Zhiqiang, YANG Chao. Modeling of resource constrained multi-project scheduling problem based on project splitting[J]. Journal of Shanghai Jiao Tong University, 2017, 51(2): 193-201. |
[1] | ZHU Hongwei, LU Zhiqiang. Modeling and Optimization of Resource Constrained Project Scheduling Problem Considering Employee-Timetabling [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 624-635. |
[2] | LU Zhiqiang,SHI Ting. Modeling and Optimization of Resource Investment Problem with Resource Vacations [J]. Journal of Shanghai Jiaotong University, 2019, 53(5): 600-609. |
[3] | QI Faqun,ZHOU Binghai. Preventive Maintenance Policy of Cluster Tools Based on Markov Process [J]. Journal of Shanghai Jiaotong University, 2014, 48(10): 1461-1467. |
[4] | CAO Weihua1,2,CAI Yiqing2,YUAN Yan1,2,WU Min1,2. Exergy Efficiency Calculation and Parameter Optimization of the Sintering Waste Heat Recovery System [J]. Journal of Shanghai Jiaotong University, 2014, 48(07): 1046-1052. |
[5] | REN Shu-1, JI Xiao-Jun-1, DONG Hao-Ran-1, CAI Ping-1, HAN Tao-1, CHEN Le-Sheng-2, ZHOU Xian-Mei-2. Optimal Matching Algorithm for Heat Measuring Instrument with Platinum Resistance [J]. Journal of Shanghai Jiaotong University, 2013, 47(04): 663-666. |
[6] | ZHOU Su-1a, 1b , JI Guang-Ji-1a, LIU Ji-Chen-1a, HU Zhe-2. Research on the Oxygen Excess Ratio Fluctuation with Current Regulation for a PEM Fuel Cell Engine [J]. Journal of Shanghai Jiaotong University, 2012, 46(11): 1712-1717. |
[7] | HAN Yi-1a, 1b , 2 , CAI Jian-Hu-1a, 1b , LI Yan-Lai-3, YE Xu-Hong-1a, LIN Hua-Zhen-1a, WANG Wei-1a. Shuffled Frog Leaping Algorithm for Multisupplier Selection Problem with Multiple Products and Discounts [J]. Journal of Shanghai Jiaotong University, 2012, 46(04): 567-572. |
[8] | LIU Xinyi,LU Zhiqiang. Modeling of and Algorithm for Resource Constrained Project Scheduling Problem with Resource Allocation Dependent Processing Time [J]. Journal of Shanghai Jiao Tong University, 2017, 51(1): 82-. |
[9] | LU Zhiqiang,YANG Chao. Modeling of Resource Constrained MultiProject Scheduling Problem Based on Project Splitting [J]. Journal of Shanghai Jiao Tong University, 2017, 51(2): 193-. |
[10] |
ZHOU Binghai,LI Ming.
Scheduling Method of Manufacturing Cells with Robot Restricted Processing [J]. Journal of Shanghai Jiao Tong University, 2017, 51(10): 1214-1219. |
[11] |
LUO Huayi,WANG Jingcheng,YANG Liwen,LI Xiaocheng.
Research and Application of Urban Water Demand Forecasting Based on Time Difference Coefficient [J]. Journal of Shanghai Jiao Tong University, 2017, 51(10): 1260-1267. |
[12] | HUANG Weijie,ZHANG Mi,CUI Cong,LI Liang. Applicability of Updated International I&C Standards and Norms for Nuclear Power Plant [J]. Journal of Shanghai Jiaotong University, 2019, 53(Sup.1): 104-108. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||