Journal of Shanghai Jiaotong University ›› 2016, Vol. 50 ›› Issue (05): 647-653.
ZHANG Jie1,PAN Cong1,SUN Yinbin1,WU Lihui2,QIN Wei1
Received:2015-07-22
Online:2016-05-28
Published:2016-05-28
CLC Number:
ZHANG Jie1,PAN Cong1,SUN Yinbin1,WU Lihui2,QIN Wei1. Modified Hungarian Algorithm and Fuzzy Logic ControlBased Scheduling Method for Interbay Material Handling System [J]. Journal of Shanghai Jiaotong University, 2016, 50(05): 647-653.
| [1]GOVIND N, ROEDER T M, SCHRUBEN L W. A simulationbased closed queueing network approximation of semiconductor automated material handling systems[J]. IEEE Transactions on Semiconductor Manufacturing, 2011, 24(1):513. [2]AGRAWAL G K, HERAGU S S. A survey of automated material handling systems in 300mm semiconductor Fabs[J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19(1): 112120. [3]KIM B I, OH S, SHIN J, et al. Effectiveness of vehicle reassignment in a largescale overhead hoist transport system[J]. International Journal of Production Research, 2007, 45(4): 789802. [4]KIM B I, SHIN J, JEONG S, et al. Effective overhead hoist transport dispatching based on the Hungarian algorithm for a large semiconductor Fab[J]. International Journal of Production Research, 2009, 47(10): 28232834. [5]LIN J T, WANG F K, YEN P Y. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer Fab[J]. International Journal of Production Research, 2001, 39(6): 12211238. [6]LIAO D Y, WANG C N. Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry[J]. The International Journal of Advanced Manufacturing Technology, 2006, 29(9): 890896. [7]LIN J T, WANG F K, CHANG Y M. A hybrid push/pulldispatching rule for a photobay in a 300 mm wafer Fab[J]. Robotics and ComputerIntegrated Manufacturing, 2006, 22(1): 4755. [8]YANG J W, CHENG H C, CHIANG T C, et al. Multiobjective lot scheduling and dynamic OHT routing in a 300mm wafer fab[C]∥ The 2008 IEEE International Conference on Systems, Man, and Cybernetics. Singapore: IEEE, 2008: 16081613. [9]KUO C H, HUANG C S. Dispatching of overhead hoist vehicles in a fab intrabay using a multimissionoriented controller[J]. The Internatinal Journal of Advandced Manufacturing Technology, 2006,27(7): 824832. [10]董义军, 张功, 张洁. 单无人搬运车/单缓冲区约束的柔性生产系统调度研究[J]. 上海交通大学学报, 2010,44(4): 528534. DONG Yijun, ZHANG Gong, ZHANG Jie. Scheduling with single AGV and single buffer area for flexible production system[J]. Journal of Shanghai Jiao Tong University, 2010,44(4): 528534. [11]郑雯, 周炳海. 基于事件驱动的高架提升传输小车派工与路径调度算法[J]. 计算机集成制造系统, 2013, 19(1): 7582. ZHENG Wen, ZHOU Binghai. OHT dispatching and routing scheduling algorithm based on eventsdriven[J]. Computer Integrated Manufacturing Systems, 2013, 19(1): 7582. [12]周炳海, 周琪, 郑雯. 半导体制造AMHS中悬挂式小车多因素调度方法[J]. 北京理工大学学报, 2014, 34(6): 603606. ZHOU Binghai, ZHOU Qi, ZHENG Wen. Multifactor OHT scheduling method of AMHS for semiconductor fabrication[J]. Transactions of Beijing Institute of Technology, 2014, 34(6): 603606. [13]MUNKRES J. Algorithms for the assignment and transportation problems[J]. Journal of the Society for Industrial and Applied Mathematics, 1957, 5(1): 3238. [14]EGBELU P J, TANCHOCO M A. Characterization of automatic guided vehicle dispatching rules[J]. International Journal of Production Research, 1984, 22(3):359374. [15]WANG K J, LIN J T, WEIGERT G. Agentbased interbay system control for a singleloop semi conductor manufacturing fab[J]. Production Planning & Control, 2007, 18(2): 7490. [16]BOZER Y A, HSIEH Y J. Throughput performance analysis and machine layout for discretespace closedloop conveyors[J]. IIE Transactions, 2007, 37(1): 7789. [17]MONTGOMERY D C. Design and analysis of experiments[M]. New York: John Wiley & Sons, Inc, 2013. |
| [1] | YANG Yinguo, FENG Yinying, WEI Wei, XIE Pingping, CHEN Yue. Coordinated Day-Ahead Scheduling and Real-Time Dispatch of a Wind-Thermal-Storage Energy Base Considering Flexibility Interval [J]. Journal of Shanghai Jiao Tong University, 2025, 59(9): 1270-1280. |
| [2] | CHEN Shi, YANG Linsen, LIU Yihong, LUO Huan, ZANG Tianlei, ZHOU Buxiang. Optimal Scheduling Strategy of Newly-Built Microgrid in Small Sample Data-Driven Mode [J]. Journal of Shanghai Jiao Tong University, 2025, 59(6): 732-745. |
| [3] | ZHANG Li, WANG Bao, JIA Jianxiong, SONG Zhumeng, YE Yutong, YU Yue, LIN Jiaqing, XU Xiaoyuan. End-to-End Collaborative Optimization Method for Microgrid Power Prediction and Optimal Scheduling [J]. Journal of Shanghai Jiao Tong University, 2025, 59(6): 720-731. |
| [4] | ZHONG Ming, WU Ying, WU Chunli, WANG Fang. Tugboat Scheduling Problem Considering Time Windows and Flexible Returning Way to Base [J]. J Shanghai Jiaotong Univ Sci, 2025, 30(6): 1276-1288. |
| [5] | QIU Zizhang, WANG Dawang, LU Zhifeng, WU Guohua. An Illuminator Resource Scheduling Methods Based on Tabu Search [J]. Air & Space Defense, 2025, 8(3): 132-140. |
| [6] | ZHAO Yingying, QIU Yue, ZHU Tianchen, LI Fan, SU Yun, TAI Zhenying, SUN Qingyun, FAN Hang. Online Steady-State Scheduling of New Power Systems Based on Hierarchical Reinforcement Learning [J]. Journal of Shanghai Jiao Tong University, 2025, 59(3): 400-412. |
| [7] | HU Kaiqiang, CAI Zexiang, CAI Yu, QU Jing, LIU Yuanyuan. Micro-Service Scheduling Model and Optimization for Protection and Control of Distribution Network Considering Virtualization Delay [J]. Journal of Shanghai Jiao Tong University, 2025, 59(11): 1684-1693. |
| [8] | ZHANG Jianhua, YAO Yi, ZHAO Si, WANG Yongyue. A Coordinated Control Scheme for Fast Frequency Regulation of Thermal Power Units Based on Flexibility Transformation [J]. Journal of Shanghai Jiao Tong University, 2025, 59(11): 1694-1706. |
| [9] | ZHOU Siyi, YANG Huanhong, HUANG Wentao, ZHOU Ze, JIAO Wei, YANG Zhenyu. Two-Stage Day-Ahead and Intra-Day Rolling Optimization Scheduling of Container Integrated Port Energy System [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1357-1369. |
| [10] | WANG Xuan, WANG Bao, CHEN Yanping, LIU Hong, MA Xiaohui. Joint Economic Optimization of AGV Logistics Scheduling and Orderly Charging in a Low-Carbon Automated Terminal [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1370-1380. |
| [11] | JIANG Zuhua1∗(蒋祖华), ZHOU Hongming2(周宏明), TAO Ningrong3(陶宁蓉), LI Baihe1(李柏鹤). Knowledge-Based Curved Block Construction Scheduling and Application in Shipbuilding [J]. J Shanghai Jiaotong Univ Sci, 2024, 29(5): 759-765. |
| [12] | CHEN Yini(陈旖旎), JIANG Zuhua* (蒋祖华). Multi-AGVs Scheduling with Vehicle Conflict Consideration in Ship Outfitting Items Warehouse [J]. J Shanghai Jiaotong Univ Sci, 2024, 29(3): 492-508. |
| [13] | GU Huijie, ZHOU Huafeng, PENG Chaoyi, HU Yaping, ZHAO Xinyi, XIE Jun, SHI Xionghua. A Multi-Time Scale Scheduling Model for Power Generation Systems with a High Proportion of New Energy Including Pumped Storage Power Stations [J]. Journal of Shanghai Jiao Tong University, 2024, 58(12): 1957-1967. |
| [14] | YE Zhiliang, LI Canbing, ZHANG Yongjun, LI Licheng, XIAO Yinjing, WU Yuhang, TAI Nengling. Optimization of Day-Ahead Dispatch Time Resolution in Power System with a High Proportion of Climate-Sensitive Renewable Energy Sources [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 781-790. |
| [15] | LI Junshuang, HU Yan, TAI Nengling. Collaborative Optimization Scheduling of 5G Base Station Energy Storage and Distribution Network Considering Communication Load and Power Supply Reliability [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 791-802. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||