Journal of Shanghai Jiaotong University ›› 2012, Vol. 46 ›› Issue (12): 1977-1982.
• Others • Previous Articles Next Articles
HU Xin-Yu, ZHOU Bing-Hai
Received:2011-11-14
Online:2012-12-29
Published:2012-12-29
CLC Number:
HU Xin-Yu, ZHOU Bing-Hai. Time Buffer Determination Method Based on System’s Random Variability[J]. Journal of Shanghai Jiaotong University, 2012, 46(12): 1977-1982.
| [1]郭永辉. DrumBufferRope理论研究综述[J]. 工业工程与管理, 2008(2): 14.GUO Yonghui. Review on DrumBufferRope theory[J]. Industrial Engineering and Management, 2008(2): 14.[2]Cao Zhengcai, Peng Yazhen, Wang Yongji. A drumbufferrope based scheduling method for semiconductor manufacturing system[C]∥ 2011 IEEE Conference on Automation Science and Engineering. Trieste, Italy: IEEE, 2011: 120125.[3]Rhee SeungHyun, Cho Nam Wook, Bae Hyerim. Increasing the efficiency of business processes using a theory of constraints[J]. Information Systems Frontiers, 2010, 12(4): 443455.[4]Schragenheim E, Ronen B. Buffer management: A diagnostic tool for production control[J]. Production and Inventory Management Journal, 1991(2): 7479.[5]Ronen B, Starr M K. Synchronized manufacturing as in OPT: From practice to theory[J]. Computers Industrial Engineering, 1990, 18(4): 585600.[6]Wu S Y, John S M, Thomas M G. A simulation analysis of the effectiveness of DrumBufferRope scheduling in furniture manufacturing[J]. Computers Industrial Engineering, 1994, 26(4): 757764.[7]Chen Jie, Chen Dong. The study on hybrid production scheduling based on TOC[C]∥ International Technology and Innovation Conference. Hangzhou, China: IEL, 2006: 193198.[8]Ye Taofeng, Han Wenmin. A quantitative method to determine the size of the stock buffer in front of the bottleneck under multiproduct[C]∥ The Sixth World Congress on Intelligent Control and Automation. Dalian, China: IEEE, 2006: 72397243.[9]Ma Lili, Chen Jun. Modeling and simulating of time buffer control for engine remanufacturing system[C]∥ International Conference on Information Engineering and Computer Science. Wuhan, China: IEEE, 2009: 14.[10]郭永辉, 钱省三. 基于鼓—缓冲器—绳子理论的半导体晶圆厂车间层控制[J]. 计算机集成制造系统, 2006, 12(1): 111116.GUO Yonghui, QIAN Xingsan. Shop floor control in wafer fabrication based on drumbufferrope theory[J]. Computer Integrated Manufacturing Systems, 2006, 12(1): 111116.[11]蒋舒宇, 周炳海. 基于瓶颈设备处理时间波动的WIP估计方法[J]. 上海交通大学学报, 2008, 42(12): 19531957.JIANG Shuyu, ZHOU Binghai. A workinprocess estimation method based on bottleneck machines process time variability[J]. Journal of Shanghai Jiaotong University, 2008, 42(12): 19531957.[12]Hoop W J, Spearman M L. Factory physics[M]. Beijing: Tsinghua University Press, 2002: 248286. |
| [1] | ZHANG Fuyou, ZHOU Qiangqiang, DU Pengcheng. Seismic Response Analysis of Cut-Off Wall of Dam Foundation Under Spatial Variability of Parameters [J]. Journal of Shanghai Jiao Tong University, 2022, 56(5): 684-692. |
| [2] | ZHANG Guang,WANG Huixing,OUYANG Qing,WANG Jiong. Thermal and Fluid Coupling Field Analysis of MR Damper for Gun Recoil [J]. Journal of Shanghai Jiaotong University, 2019, 53(4): 504-512. |
| [3] | LI Xiansheng1,MENG Fansong1,ZHENG Xuelian1,REN Yuanyuan1,YAN Jiahui2,WU Ping3,ZHANG Jinghai1. Psychological Characteristics of Drivers in the Stress Scene Based on Heart Rate Variability [J]. Journal of Shanghai Jiao Tong University, 2018, 52(2): 163-168. |
| [4] | ZHAO Ziren1, DU Shichang1, HUANG Delin1, REN Fei2, LIANG Xinguang2. Modelling and Bottleneck Analysis of Product Quality in Transient Phase#br# of MultiStage Manufacturing Systems Based on Markovian Chains [J]. Journal of Shanghai Jiao Tong University, 2017, 51(10): 1166-1173. |
| [5] | HUANG Bao-rui1,2 (黄宝瑞), WANG Feng2* (王锋), LI Jun-hui2 (李军辉), WANG Nian-song1,2* (汪年松). Serum Renalase Inversely Related to Heart Rate Variability in Dialysis Patients [J]. Journal of shanghai Jiaotong University (Science), 2014, 19(4): 508-512. |
| [6] | CHENG Yan, ZHANG Lu-lu, ZHANG Lei, WANG Jian-hua. Coupled Consolidation in Unsaturated Soils Based on Random Field Theory [J]. Journal of Shanghai Jiao Tong University, 2014, 48(11): 1528-1535. |
| [7] | LI Cheng, JIANG Zhi-Bin, LI You, LI Na, GENG Na, YAO Shi-Qing, JIA Wen-You. Rule-Based Scheduling of Batch Processing Machine Applied to Semiconductor Wafer Fabrication System [J]. Journal of Shanghai Jiaotong University, 2013, 47(02): 230-235. |
| [8] |
JIANG Shu-yu,ZHOU Bing-hai.
A WorkinProcess Estimation Method Based on Bottleneck Machines’ Process Time Variability [J]. Journal of Shanghai Jiaotong University, 2008, 42(12): 1953-1957. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||