[1]QIU Ling, HSU Wenjing. Scheduling and routing algorithms for AGVs: A survey [J]. International Journal of Production Research, 2002, 40(3): 745760.[2]Broadbent A J, Besant C B, Premi S K,et al. Free ranging AGV systems: Promises, problems and pathways[C]//Proceedings of the 2nd International Conference on Automated Materials Handling. UK:IFS Publication Ltd,1985:221237.[3]Kim C W, Tanchoco J M A. Operational control of a bidirectional automated guided vehicle systems[J]. International Journal of Production Research, 1993, 31(9):21232138.[4]Taghaboni F, Tanchoco J M A. Comparison of dynamic routing techniques for automated guided vehicle systems[J]. International Journal of Production Research, 1995, 33(10):26532669.[5]Langevin A, Lauzon D, Riopel D. Dispatching, routing and scheduling of two automated guided vehicles in a flexible manufacturing system[J]. International Journal of Flexible Manufacturing System, 1996,8: 246262.[6]刘国栋,曲道奎,张雷.多AGV 调度系统中的两阶段动态路径规划[J]. 机器人,2005,27(3):210214. LIU Guodong,QU Daokui,ZHANG Lei. Twostage dynamic path planning for multiple AGV scheduling systems[J].Robot, 2005,27(3):210214.[7]贺丽娜,楼佩煌,钱晓明,等.基于时间窗的自动导引车无碰撞路径规划[J]. 计算机集成制造系统,2010,16(12):26302634. HE Lina, LOU Peihuang,QIAN Xiaoming, et al. Conflictfree automated guided vehicles routing based on time window[J].Computer Integrated Manufacture System,2010,16(12):26302634.[8]Smolicrocak N, Stjepan P T. Time windows based dynamic routing in multiAGV systems[J].IEEE Transactions on Automation Science and Engineering, 2010, 1(7):151155.[9]胡彬.时间窗实验之一[EB/OL].(20120202)[2012-02-02].http://v.youku.com/v_show/id_XMzQ4MjY5ODUy.html.[10]胡彬.时间窗实验之二[EB/OL].(20120202)[2012-02-02].http://v.youku.com/v_show/id_XMzQ4MjcxMDUy.html. |