Journal of Shanghai Jiaotong University ›› 2015, Vol. 49 ›› Issue (05): 702-707.
• Mechanical instrumentation engineering • Previous Articles Next Articles
ZHANG Xiaowen,SUN Xiaoming,JIANG Zuhua,HU Jiawen
Received:
2014-07-14
CLC Number:
ZHANG Xiaowen,SUN Xiaoming,JIANG Zuhua,HU Jiawen. Opportunistic Preventive Maintenance Strategy for Series-Parallel System Considering Line Balancing[J]. Journal of Shanghai Jiaotong University, 2015, 49(05): 702-707.
[1]Cui L R, Li H J. Opportunistic maintenance for multicomponent shock models [J]. Mathematical Methods of Operations Research, 2006, 63(3): 493511.[2]Zhou X, Xi L, Lee J. Opportunistic preventive maintenance scheduling for a Multiunit series system based on dynamic programming [J]. International Journal of Production Economics, 2009, 118(2): 361366.[3]Wang H Z, Pham H. Availability and maintenance of series systems subject to imperfect repair and correlated failure and repair [J]. European Journal of Operational Research, 2006, 174(3): 17061722. [4]Zhou X J, Lu Z Q, Xi L F. Preventive maintenance optimization for a multicomponent system under changing job shop schedule [J]. Reliability Engineering and System Safety, 2012, 101(1): 1420.[5]Tsai Y T, Wang K S, Tsai L C. A study of availabilitycentered preventive maintenance for multicomponent systems [J]. Reliability Engineering and System Safety, 2004, 84(3): 261270.[6]Zhou X, Xi L, Lee J. Reliability centered predictive maintenance scheduling for a continuously monitored system subject to degradation [J]. Reliability Engineering and System Safety, 2007, 92(4): 530540.[7]朱海平, 郭磊, 刘繁茂, 等. 生产批量约束下的串并联系统选择性维修方法[J]. 计算机集成制造系统, 2011,17(2): 419424.ZHU Haiping, GUO Lei, LIU Fanmao, et al. Selective maintenance method for seriesparallel system under production lot constraint [J]. Computer Integrated Manufacturing Systems, 2011, 17(2): 419424.[8]侯文瑞, 蒋祖华, 金玉兰. 基于可靠度的多设备混联系统机会维护模型[J]. 上海交通大学学报, 2009, 43(4): 658662.HOU Wenrui, JIANG Zuhua, JIN Yulan. Reliabilitybased opportunistic preventive maintenance model of multiunits serial parallel system [J]. Journal of Shanghai Jiaotong University, 2009, 43(4): 658662.[9]Xia T B, Xi L F, Zhou X J, et al. Dynamic maintenance decisionmaking for seriesparallel manufacturing system based on MAMMTW methodology [J]. European Journal of Operation Research, 2012, 221(1): 231240.[10]夏唐斌, 奚立峰, 周晓军, 等. 串并联衰退系统的多目标预防性维护优化建模[J]. 计算机集成制造系统, 2010, 16(4): 783788.XIA Tangbin, XI Lifeng, ZHOU Xiaojun, et al. Optimization of multiobjective preventive maintenance for serialsparallel deteriorating systems [J]. Computer Integrated Manufacturing Systems, 2010, 16(4): 783788.[11]侯文瑞, 蒋祖华, 金玉兰. 基于可靠度的多部件系统机会维护模型[J]. 系统工程与电子技术, 2008, 30(9): 18051808.HOU Wenrui, JIANG Zuhua, JIN Yulan. Opportunistic preventive maintenance model of multicomponents system based on reliability [J]. Systems Engineering and Electronics, 2008, 30(9): 18051808. |
[1] | DU Yu,LI Yuqing,ZHANG Xiufang,PAN Ershun. Preventive Maintenance and Replacement Policy for Series Deteriorating Production System Considering Generalized Time Value [J]. Journal of Shanghai Jiaotong University, 2020, 54(5): 465-472. |
[2] | WANG Shaohua *(王少华), ZHANG Shixin (张仕新), XU Longyang (徐隆洋), XING Ruxin (邢汝鑫). Optimal Research on Equipment Maintenance Unequal Time-Interval Based on Simulation [J]. Journal of Shanghai Jiao Tong University (Science), 2019, 24(4): 485-489. |
[3] | SUN Bowen,GUO Wenyu,XIA Tangbin,PAN Ershun,XI Lifeng. Capacity Balancing-Oriented Leasing Profit Optimization of Opportunistic Maintenance for Leased Series-Parallel Production System [J]. Journal of Shanghai Jiaotong University, 2019, 53(3): 276-284. |
[4] | LIANG Qingxue (梁晴雪), HU Hao* (胡昊). Uncertainty Analysis of Value for Money Assessment for Public-Private Partnership Projects [J]. Journal of Shanghai Jiao Tong University (Science), 2017, 22(6): 672-681. |
[5] | ZHU Yinghua (朱莹华), XU Feng* (徐 峰), HU Hao (胡 昊). A Stochastic Concession Model for Infrastructure Projects Under Build-Operate-Transfer Schemes [J]. Journal of shanghai Jiaotong University (Science), 2016, 21(3): 320-327. |
[6] | WANG Hong,DU Weixin,LIU Zhilong,YANG Xinzhu,LI Zhongxue. Integrating Failure and Economic Dependence for Maintenance of Electric Multiple Unit MultiComponent System [J]. Journal of Shanghai Jiaotong University, 2016, 50(05): 660-667. |
[7] | CHENG Yan, ZHANG Lu-lu, ZHANG Lei, WANG Jian-hua. Coupled Consolidation in Unsaturated Soils Based on Random Field Theory [J]. Journal of Shanghai Jiao Tong University, 2014, 48(11): 1528-1535. |
[8] | WANG Hongjian,XU Jinlong,LIU Xiangbo,LI Juan,ZHANG Aihua. Adaptive Divided Difference Filter Algorithm Based on Support Vector Regression [J]. Journal of Shanghai Jiaotong University, 2014, 48(07): 929-935. |
[9] | FAN Jiangtao1,2,MA Guanyi1,2. A Pre-Despreading Delay-and-Multiplication Method for Global Positioning System Signal Acquisition [J]. Journal of Shanghai Jiaotong University, 2014, 48(03): 363-366. |
[10] | Ding H.; Xu B.; Ni C.; Wang J.-Y.; Jin X.-J.. Monte Carlo simulation of B2-L21 ordering transitions in Au-Cu-Al alloy systems [J]. J Shanghai Jiaotong Univ Sci, 2011, 16(2): 186-189. |
[11] | DIAO Yonghao,JIANG Zhibin. A Stochastic Programming Based Method for Hospital Site Selection [J]. Journal of Shanghai Jiaotong University, 2010, 44(03): 433-0436. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||