Optimization of Warship Spare Parts in the Scenario of Wartime Mission
WANG Rui-1, LEI Hong-Wei-1, PENG Ying-Wu-2, LI Qing-Min-2, QI Yong-Qiang-1
(1. Department of Military Logistics and Armament, National Defense University, Beijing 100083, China; 2. Department of Weapon Engineering, Naval University of Engineering, Wuhan 430033, China)
WANG Rui-1, LEI Hong-Wei-1, PENG Ying-Wu-2, LI Qing-Min-2, QI Yong-Qiang-1. Optimization of Warship Spare Parts in the Scenario of Wartime Mission[J]. Journal of Shanghai Jiaotong University, 2013, 47(03): 398-403.
[1]Sherbrooke C C. A multiechelon technique for recoverable item control [J]. Operations Research, 1968, 16(2): 122141.[2]Sherbrooke C C. VARIMETRIC: Improved approximation for multiindenture, multiechelon svailability models[J].Operations Research, 1986, 34(2): 311319.[3]刘勇,武昌,李阳,等. 两级备件保障系统的装备时变可用度评估模型[J]. 兵工学报, 2010, 31(2): 253256.LIU Yong, WU Chang, LI Yang, et al. Evaluation model of equipment timevarying availability in twoechelon spare partssupport system [J]. Acta Armamentarii, 2010, 31(2): 253256.[4]Lau H C, Song H, See T C, et al. Evaluation of timevarying availability in multiechelon spare parts systems withpassivation[J]. European Journal of Operational Research, 2006, 170(1): 91105.[5]Slay F M, Bachman T C, Kline R C. Optimizing spares support: The aircraft sustainability model[R]. Washington:Logistics Management Institute, 1996.[6]Sherbrooke C C. Optimal inventory modeling of system: Multiechelon techniques[M]. Boston: Artech House, 2004.[7]郝杰忠,杨建军,杨若鹏. 装备技术保障运筹分析[M]. 北京: 国防工业出版社, 2006.[8]Crawford G B. Palm’s theorem for nonstationary processes[R]. Santa Monica: RAND Corporation, 1981.