Journal of Shanghai Jiao Tong University ›› 2021, Vol. 55 ›› Issue (12): 1640-1649.doi: 10.16183/j.cnki.jsjtu.2021.273

Special Issue: 《上海交通大学学报》2021年“电气工程”专题 《上海交通大学学报》2021年12期专题汇总专辑

Previous Articles     Next Articles

Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems

HU Hong1, CHEN Xinyi1, WANG Lifeng1, TENG Xiaobi1, YAN Zheng2(), XU Xiaoyuan2, WANG Han2   

  1. 1. East China Branch of State Grid Corporation of China, Shanghai 200120, China
    2. Key Laboratory of Control of Power Transmission and Conversion of the Ministry of Education, Shanghai Jiao Tong University, Shanghai 200240, China
  • Received:2021-07-30 Online:2021-12-28 Published:2021-12-30
  • Contact: YAN Zheng E-mail:yanz@sjtu.edu.cn

Abstract:

In order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy development, net load fluctuation, and the demand of power market reform. Furthermore, it proposes an operating reserve proposal system of East China power grid under the new situation based on the status of typical power systems at home and abroad. The suggested operating reserve system reorganizes and revises the principles of reserve classification, response time, and minimum reserve configuration. The results verify the effectiveness of the proposed operating reserve system through the measurement and analysis of the actual operation data of the East China power grid.

Key words: operating reserve, East China power grid, minimum reserve configuration, measurement and analysis