上海交通大学学报 ›› 2026, Vol. 60 ›› Issue (6): 965-974.doi: 10.16183/j.cnki.jsjtu.2024.526

• 新型电力系统与综合能源 • 上一篇    下一篇

含势能回馈的集装箱码头物流-能量协同优化调度方法

杨欢红1, 叶婧元1(), 李俊1, 张卫川2, 王理想2, 王宇轩1   

  1. 1 上海电力大学 电气工程学院, 上海 200090
    2 河南许继仪表有限公司, 河南 许昌 461000
  • 收稿日期:2024-12-27 修回日期:2025-02-06 接受日期:2025-03-14 出版日期:2026-06-28 发布日期:2026-07-02
  • 通讯作者: 叶婧元,硕士生;E-mail:miuye0124@163.com.
  • 作者简介:杨欢红(1965—),副教授,从事电力系统安全运行、微电网及综合能源系统研究.
  • 基金资助:
    国家自然科学基金(52177100)

Logistics-Energy Coordinated Optimization Scheduling Method for Container Terminals with Potential Energy Feedback

YANG Huanhong1, YE Jingyuan1(), LI Jun1, ZHANG Weichuan2, WANG Lixiang2, WANG Yuxuan1   

  1. 1 College of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, China
    2 Henan Xuji Instrument Co., Ltd., Xuchang 461000, Henan, China
  • Received:2024-12-27 Revised:2025-02-06 Accepted:2025-03-14 Online:2026-06-28 Published:2026-07-02

摘要:

为降低集装箱码头的运行成本并提高能源利用效率,构建一种含势能回馈的集装箱码头微电网日前协同调度模型.首先,构建集装箱码头物流-能量耦合系统,基于此建立含势能回馈的岸桥作业模型与自动导引车能量管理模型;其次,分析码头各类物流设备的作业特点,建立以日运行成本最小为目标的物流-能量协同优化模型,采用自适应模拟退火遗传算法对该模型进行求解,得到岸桥-自动导引车最优协同调度方案;最后,以上海某集装箱码头为例进行仿真验证.所提调度方案与传统调度方式下的场景相比,运行成本降低4.96%,势能回馈利用率提升18.69%,可有效缩短岸桥势能回馈装置改造的投资回收周期.

关键词: 集装箱码头, 势能回馈, 耦合系统优化调度, 岸桥, 自动导引车

Abstract:

To reduce the operating costs of container terminals and improve energy utilization efficiency, a day-ahead coordinated scheduling model for container terminal microgrids with potential energy feedback is developed. First, a logistics-energy coupling system of container terminals is established, based on which, a quay crane operation model with potential energy feedback and an automatic guided vehicle energy management model are developed. Next, the operation characteristics of various logistics equipment in the terminal are analyzed, and a logistics-energy coordinated optimization model with the objective of minimizing daily operating costs is established. The model is then solved using an adaptive simulated annealing genetic algorithm to obtain the optimal collaborative scheduling scheme for quay cranes and automated guided vehicles. Finally, a container terminal in Shanghai is adopted for simulation verification. Compared with the traditional scheduling method, the proposed scheduling scheme reduces the operating cost by 4.96%, increases the utilization rate of potential energy feedback by 18.69%, and effectively shortens the investment payback period of the quay crane potential energy feedback device transformation.

Key words: container terminal, potential energy feedback, coupled system optimization scheduling, quay crane (QC), automated guided vehicle (AGV)

中图分类号: