上海交通大学学报 ›› 2026, Vol. 60 ›› Issue (6): 975-984.doi: 10.16183/j.cnki.jsjtu.2024.277

• 船舶海洋与建筑工程 • 上一篇    下一篇

考虑拉索非线性效应的大跨斜拉桥拉索多级张拉控制方法

周思成1, 杨健1(), 汪来发2, 王星尔1, 邹赐2   

  1. 1 上海交通大学 船舶海洋与建筑工程学院, 上海 200240
    2 中交第三航务工程局有限公司, 上海 200032
  • 收稿日期:2024-07-12 修回日期:2024-09-27 接受日期:2024-10-18 出版日期:2026-06-28 发布日期:2026-07-02
  • 通讯作者: 杨 健,教授,博士生导师;E-mail: j.yang.1@sjtu.edu.cn.
  • 作者简介:周思成(2000—),硕士生,从事桥梁施工技术方向研究.

Multi-Stage Tensioning Control Method for Cables of Large-Span Cable-Stayed Bridge Considering Cable Nonlinear Effect

ZHOU Sicheng1, YANG Jian1(), WANG Laifa2, WANG Xing’er1, ZOU Ci2   

  1. 1 School of Ocean and Civil Engineering, Shanghai Jiao Tong University, Shanghai 200240, China
    2 CCCC Third Harbor Engineering Co., Ltd., Shanghai 200032, China
  • Received:2024-07-12 Revised:2024-09-27 Accepted:2024-10-18 Online:2026-06-28 Published:2026-07-02

摘要:

针对垂度非线性影响下大跨斜拉桥拉索多级张拉控制的问题,根据拉索多级等值张拉和垂度非线性效应基本原理,对多级等值张拉过程进行分阶段计算理论推导,给出施工过程中多种影响因素在理论计算中的修正方法,提出一种新的多级等值张拉计算理论.数值分析与实测结果对比显示,采用该计算理论进行张拉控制的最大张拉力误差为-1.25%,最大线形误差为3.3 cm,相较于常规线性方法,该计算理论可大幅提高计算索力均匀性和准确性,且无需进行多次迭代计算,满足实际工程应用需求,可有效指导大跨斜拉桥施工的拉索张拉控制.

关键词: 桥梁与隧道工程, 大跨斜拉桥, 等值张拉, 垂度非线性, 多级张拉

Abstract:

Aiming at the multi-stage tensioning control of cables for long-span cable-stayed bridges under the influence of sag nonlinearity, based on the fundamental principles of multi-stage equivalent tensioning of cables and sag nonlinearity effects, the multi-stage equivalent tensioning process is theoretically derived, providing correction methods for various influencing factors in theoretical calculations during the construction process, and a new theory for multi-stage equivalent tensioning calculation is proposed. Through comparison between numerical analysis and measured results, the maximum error of tension control using the proposed calculation theory is -1.25%, and the maximum beam alignment error is 3.3 cm. Compared with conventional linear methods, the proposed method can significantly improve the uniformity and accuracy of cable force calculation without multiple iterative calculations, meeting practical engineering application requirements and effectively guiding cable tensioning control in the construction of long-span cable-stayed bridges.

Key words: bridge and tunnel engineering, large-span cable-stayed bridge, equivalent tension, sag nonlinearity, multi-stage tension