[1] |
王嘉民, 何琪敏, 李晓鸣. 边装边卸流程的系统开发[J]. 港口装卸, 2006 (3): 1-4.
|
|
WANG Jiamin, HE Qimin, LI Xiaoming. System development for dual cycle both loading and unloading process[J]. Port Operation, 2006(3): 1-4.
|
[2] |
GOODCHILD A V, DAGANZO C F. Double-cycling strategies for container ships and their effect on ship loading and unloading operations [J]. Transportation Science, 2006, 40(4): 473-483.
|
[3] |
ZHANG H, KIM K H. Maximizing the number of dual-cycle operations of quay cranes in container terminals [J]. Computers & Industrial Engineering, 2009, 56(3): 979-992.
|
[4] |
LEE C Y, LIU M, CHU C C. Optimal algorithm for the general quay crane double-cycling problem[J]. Transportation Science, 2014, 49(4): 957-967.
|
[5] |
曾庆成, 杨忠振, 陆靖. 集装箱码头同贝同步装卸调度模型与算法[J]. 交通运输工程学报, 2010, 10(1): 88-93.
|
|
ZENG Qingcheng, YANG Zhongzhen, LU Jing. Scheduling model and algorithm of integrating loading and unloading operations in same ship-bay at container terminal[J]. Journal of Traffic & Transportation Engineering, 2010, 10(1): 88-93.
|
[6] |
CHEN L, BOSTEL N, DEJAX P, et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal[J]. European Journal of Operational Research, 2007, 181(1): 40-58.
|
[7] |
ZENG Q, YANG Z. Integrating simulation and optimization to schedule loading operations in container terminals[J]. Computers & Operations Research, 2009, 36(6): 1935-1944.
|
[8] |
AGRA A, OLIVEIRA M. MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem[J]. European Journal of Operational Research, 2017, 264(1): 138-148.
|
[9] |
SHANG X T, CAO J X, REN J. A robust optimization approach to the integrated berth allocation and quay crane assignment problem[J]. Transportation Research Part E: Logistics & Transportation Review, 2016, 94: 44-65.
|
[10] |
TANG L, ZHAO J, LIU J. Modeling and solution of the joint quay crane and truck scheduling problem[J]. European Journal of Operational Research, 2014, 236(3): 978-990.
|
[11] |
孙彬, 孙俊清, 陈秋双. 基于鲁棒反应式策略的泊位和岸桥联合调度[J]. 系统工程理论与实践, 2013, 33(4): 1076-1083.
|
|
SUN Bin, SUN Junqing, CHEN Qiushuang. Integrated scheduling for berth and quay cranes based on robust and reactive policy[J]. Systems Engineering Theory & Practice, 2013, 33(4): 1076-1083.
|
[12] |
郑红星, 尹昊, 曹红雷, 等. 考虑潮汐影响的离散型泊位和岸桥集成调度[J]. 运筹与管理, 2017, 26(6): 167-175.
|
|
ZHENG Hongxing, YIN Hao, CAO Honglei, et al. Integrated discrete berth allocation and quay crane scheduling under tidal influence at container terminal [J]. Operations Research and Management Science, 2017, 26(6): 167-175.
|
[13] |
KIRKPATRICK S, GELATT C D, VECCHI M P. Optimization by simulated annealing[J]. Science, 1983, 220(4598): 671-680.
|