[1]Pham H, Wang H. Imperfect Repair[J]. European Journal of Operational Research, 1996, 94: 425438. [2]Kijima M. Some results for repairable systems with general repair[J]. Journal of Applied Probability, 1989, 26: 89102. [3]Guo R, Ascher H E, Love C E. Generalized models of repairable systems—A survey via stochastic processes formalism[J]. ORiON, 2000, 16(2): 87128. [4]Liu X, Makis V, Jardine A K S. A replacement model with overhauls and repairs[J]. Naval Research Logistics, 1995, 42: 10631079. [5]Nakagawa T. A summary of imperfect preventive maintenance policies with minimal repair[J]. RAIRO Operations Research, 1980, 14: 249255. [6]Nakagawa T. Periodic and sequential preventive maintenance policies[J]. Journal of Applied Probability, 1986, 23: 536542. [7]Lin D, Zuo M J, Yam R C M. General sequential imperfect preventive maintenance models[J]. International Journal of Reliability Quality and Safety Engineering, 2000, 7: 253266. [8]Wang Z M, Yang J G, Wang G Q, et al. Sequential imperfect preventive maintenance policy with random maintenance quality under reliability limit[J]. Proceedings of the Institution of Mechanical Engineers, Part C, Journal of Mechanical Engineering Science, 2011, 225(8): 19261935. [9]Jayabalan V, Chaudhuri D. Cost optimization of maintenance scheduling for a system with assured reliability[J]. IEEE Transactions on Reliability, 1992, 41(1): 2125. [10]韩帮军, 范秀敏, 马登哲. 基于可靠度约束的预防性维修策略的优化研究[J]. 机械工程学报, 2003, 39(6): 102105. HAN Bangjun, FAN Xiumin, MA Dengzhe. Research on the optimal preventive maintenance policy based on reliability constraints [J]. Chinese Journal of Mechanical Engineering, 2003, 39(6):102105. [11]Zhao X J, Xi L F, Lee J. Reliabilitycentered predictive maintenance scheduling for a continuously monitored system subject to degradation[J]. Reliability Engineering and System Safety, 2007, 92: 530534. [12]Wu S, ClementsCroome D. Preventive maintenance models with random maintenance quality[J]. Reliability Engineering and System Safety, 2005, 90: 99105. [13]Pulcini G. A bounded intensity process for the reliability of repairable equipment[J]. Journal of Quality Technology, 2001, 33(4): 480492. [14]王智明, 杨建国. 数控机床可靠性评估中的边界强度过程[J]. 上海交通大学学报, 2012, 46(10): 16221626. WANG Zhiming, YANG Jianguo. Bounded intensity process and its applications in reliability assessment of NC machine tools[J]. Journal of Shanghai Jiaotong University, 2012, 46(10): 16221626. [15]Kijima M, Morimura H, Suzuki Y. Periodical replacement problem without assuming minimal repair[J]. European Journal of Operational Research, 1988, 37: 194203. |