[1]Dabbene F, Gay P, Sacco N. Optimization of freshfood supply chains in uncertain environments, Part I: Background and methodology [J]. Biosystems Engineering, 2008, 99: 348359.[2]Chena H, Hsuehb C, Changc M. Production scheduling and vehicle routing with time windows for perishable food products[J]. Computers & Operations Research, 2009, 36: 23112319.[3]Eksioglu S D, Romeijn H E, Pardalos P M. Crossfacility management of production and transportation planning problem[J]. Computers & Operations Research, 2006, 33(11): 32313251.[4]Leung S C H, Wan L N. A goal programming model for production planning of perishable products with postponement[J]. Computer & Industrial Engineering, 2007, 53(3): 531541.[5]Ahuja R K, Huang W, Romeijn H E, et al. A heuristic approach to the multiperiod singlesourcing problem with production and inventory capacities and perishability constraints[J]. Informs Journal on Computing, 2007, 19(3): 1426.[6]Zanoni S, Zavanella L. Singlevendor singlebuyer with integrated transport inventory system: Model and heuristics in the case of perishable goods[J]. Computer & Industrial Engineering, 2007, 52(1): 107123.[7]Adegoke O, Mohan G. Managing disruptions in supply chains: A case study of a retail supply chain[J]. International Journal of Production Economics, 2009, 118: 168174.[8]Kleindorfer P R, Saad G H. Managing disruption risks in supply chains[J]. Production and Operations Management, 2005, 14(1): 5368.[9]Chopra S C, Sodhi M S. Managing risk to avoid supplychain breakdown[J]. MIT Sloan Management Review, 2004,46 (1): 5361.[10]Hendricks K B, Singhal V R. An empirical analysis of the effect of supply chain disruptions on logrun stock price and equity risk of the firm[J]. Production and Operations Management, 2005, 14(1): 3552.[11]Tagaras G, Vlachos D. A periodic review inventory system with emergency replenishment[J]. Management Science, 2001, 47(3): 415429.[12]Wijngaard J, Miltenburg G J. On the cost of using capacity flexibility—A dynamic programming approach[J]. International Journal of Production Economics, 1997, 53(1): 1319.[13]Osvald A, Stirn L Z. A vehicle routing algorithm for the distribution of fresh vegetables and similar perishable food[J]. Journal of Food Engineering, 2008, 85(2): 285295.[14]Williams C L, Patuwo B E. A perishable inventory model with positive order lead time[J]. European Journal of Operational Research, 1999, 116(2): 35237. |